PROJECT CLASSIFICATION :
T_Max
1 80.51 29.43 1256 7.2 22
2 80.58 29.3 1865 11.9 130
3 80.4 29.53 1635 19.7 335
4 80.48 29.61 842 26.8 0
5 80.85 29.58 1456 42.3 56
6 80.21 29.03 176 46.2 215
7 80.95 29.25 1360 46.9 106
8 80.51 29.81 1097 49.1 3
9 81 29 1388 64.6 129
10 81.2 29.53 1304 71.4 75
80.67 29.41 1238 38.6 77
T_Min
1 80.51 29.43 1256 7.2 22
2 80.58 29.3 1865 11.9 130
3 80.4 29.53 1635 19.7 335
4 80.48 29.61 842 26.8 0
5 80.85 29.58 1456 42.3 56
6 80.21 29.03 176 46.2 215
7 80.95 29.25 1360 46.9 106
8 80.51 29.81 1097 49.1 3
9 81 29 1388 64.6 129
10 81.2 29.53 1304 71.4 75
80.67 29.41 1238 38.6 77
Precipiattion & PET Stations Stations:
PET
1 80.51 29.43 1256 7.2 22
2 80.58 29.3 1865 11.9 130
3 80.4 29.53 1635 19.7 335
4 80.48 29.61 842 26.8 0
5 80.85 29.58 1456 42.3 56
6 80.21 29.03 176 46.2 215
7 80.51 29.81 1097 49.1 3
8 81.2 29.53 1304 71.4 75
9 81.1 28.95 340 75.7 128
10 80.6 28.68 167 77.4 172
80.64 29.35 1014 42.8 100
Wind
1 80.58 29.3 1865 11.9 130
2 80.21 29.03 176 46.2 215
3 80.6 28.68 167 77.4 172
4 79.65 29.46 2311 81.6 277
5 81.61 28.6 720 138.8 128
6 79.4 28.36 169 154.2 224
7 81.35 28.16 215 158.6 148
8 82.16 29.28 2350 162.6 93
9 81.56 28.1 190 175.7 143
10 80.16 27.38 142 223.5 188
80.73 28.64 831 123.1 164
Results
Temperature Results:
Daylen. [h]
January 10:27
February 11:07
March 11:57
April 12:50
May 13:34
June 13:56
July 13:46
August 13:08
Septembe 12:18
October 11:26
November 10:39
December 10:15
Mean 12:07
T_Max
N PATAN-(WE
NEPAL 1 87.15 26.95 305 15.9
SE DADELDHUR
NEPAL 2 86.81 27.01 1295 18.9
NW BAITADI NEPAL
N KAKERPAKH
NEPAL
NE PIPALKOTNEPAL
SW MAHENDRANEPAL
E SILGARHI-
NEPAL
N DARCHULANEPAL 3 87.2 27.01 1317 19.8
SE KATAI NEPAL 4 87.05 27.18 1595 20.6
E CHAINPURNEPAL 5 87.15 26.85 146 22.3
E 87.07 27 932 19.5
T_Min
N PATAN-(WE
NEPAL
SE DADELDHUR
NEPAL
NW BAITADI NEPAL
N KAKERPAKH
NEPAL
NE PIPALKOTNEPAL
SW MAHENDRANEPAL 1 87.15 26.95 305 15.9
E SILGARHI-
NEPAL 2 86.81 27.01 1295 18.9
N DARCHULANEPAL 3 87.2 27.01 1317 19.8
SE KATAI NEPAL 4 87.05 27.18 1595 20.6
E CHAINPURNEPAL 5 87.15 26.85 146 22.3
E 87.07 27 932 19.5
T_Min
1 87.15 26.95 305 15.9
2 86.81 27.01 1295 18.9
3 87.2 27.01 1317 19.8
4 87.05 27.18 1595 20.6
5 87.15 26.85 146 22.3
6 87.15 26.8 183 26.8
7 87.26 27.11 412 28.5
8 86.81 27.2 1829 29.1
9 87.3 26.9 365 31.7
10 87.33 26.96 1060 33
87.12 27 851 24.7
Stations:
PET
N PATAN-(WE
NEPAL
SE DADELDHUR
NEPAL
NW BAITADI NEPAL
N KAKERPAKH
NEPAL
NE PIPALKOTNEPAL
SW MAHENDRANEPAL 1 87.15 26.95 305 15.9
N DARCHULANEPAL 2 86.81 27.01 1295 18.9
E CHAINPURNEPAL 3 87.2 27.01 1317 19.8
SE BANGGA-CNEPAL 4 87.05 27.18 1595 20.6
S DHUNGADHI
NEPAL 5 87.15 26.85 146 22.3
E 87.07 27 932 19.5
Stations:
Wind
SE DADELDHUR
NEPAL
SW MAHENDRANEPAL
S DHUNGADHI
NEPAL
W MUKTESHINDIA
SE SURKHETNEPAL
SW BAREILLYINDIA 1 87.05 27.18 1595 20.6
SE GULARIA NEPAL 2 87.35 26.98 1445 34.8
E JUMLA NEPAL 3 87.28 26.81 444 34.9
SE KHAJURANEPAL 4 87.26 26.7 200 42.2
S HARDOI INDIA
S 87.24 26.92 921 33.1
Stations:
Direction Station Country Name
Longitude Latitude [ Altitude [ Distance
N PATAN-(WE
NEPAL
SE DADELDHUR
NEPAL
NW BAITADI NEPAL
N KAKERPAKH
NEPAL
NE PIPALKOTNEPAL
SW MAHENDRANEPAL Sun
E SILGARHI-
NEPAL 1 87.15 26.95 305 15.9
N DARCHULANEPAL 2 86.81 27.01 1295 18.9
SE KATAI NEPAL 3 87.2 27.01 1317 19.8
E CHAINPURNEPAL 4 87.05 27.18 1595 20.6
E 5 87.15 26.85 146 22.3
87.07 27 932 19.5
Vertical Longitudi Latitudin Gradient Gradient Absolute Expl. Var Expl. Var of Hor. Corr
[°C/100m [°C/100k [°C/100k Degrees [°C/100k % %
[°C/100m [°C/100k [°C/100k Degrees [°C/100k % %
Vertical Longitudi Latitudin Gradient Gradient Absolute Expl. Var Expl. Var of Hor. Corr
[mm/100 [mm/100 [mm/100 Degrees [mm/100 % %
[mm/100 [mm/100 [mm/100 Degrees [mm/100 % %
Vertical Longitudi Latitudin Gradient Gradient Absolute Expl. Var Expl. Var of Hor. Corr
[hPa/100 [hPa/100 [hPa/100 Degrees [hPa/100 % %
[min/100 %
Direction Direction Station Country Name
110 E MACHUWAG
NEPAL
273 W KHOTANG-
NEPAL
87 E MUNGA NEPAL
14 N BHOJPURNEPAL
138 SE BARAKSHE
NEPAL
90 E
110 E MACHUWAG
NEPAL
273 W KHOTANG-
NEPAL
87 E MUNGA NEPAL
14 N BHOJPURNEPAL
138 SE BARAKSHE
NEPAL
90 E
110 E MACHUWAG
NEPAL
273 W KHOTANG-
NEPAL
87 E MUNGA NEPAL
14 N BHOJPURNEPAL
138 SE BARAKSHE
NEPAL
90 E
92 E
110 E MACHUWAG
NEPAL
273 W KHOTANG-
NEPAL
87 E MUNGA NEPAL
14 N BHOJPURNEPAL
138 SE BARAKSHE
NEPAL
146 SE CHATRA NEPAL
65 NE LEGUWA-GH
NEPAL
320 NW DWARPA NEPAL
110 E MUL-GHAT
NEPAL
98 E DUMUHAN
NEPAL
92 E
110 E MACHUWAG
NEPAL
273 W KHOTANG-
NEPAL
87 E MUNGA NEPAL
14 N BHOJPURNEPAL
138 SE BARAKSHE
NEPAL
90 E
110 E MACHUWAG
NEPAL
273 W KHOTANG-
NEPAL
87 E MUNGA NEPAL
14 N BHOJPURNEPAL
138 SE BARAKSHE
NEPAL
90 E
138 SE BARAKSHE
NEPAL
146 SE CHATRA NEPAL
65 NE LEGUWA-GH
NEPAL
320 NW DWARPA NEPAL
110 E MUL-GHAT
NEPAL
98 E DUMUHANNEPAL
92 E
14 N BHOJPURNEPAL
94 E DHANKUTA
NEPAL
127 SE DHARAN-B
NEPAL
142 SE TARAHAWA
NEPAL
111 E
14 N BHOJPURNEPAL
94 E DHANKUTA
NEPAL
127 SE DHARAN-B
NEPAL
142 SE TARAHAWA
NEPAL
111 E
304 NW OKHALDHUNEPAL
156 SE BIRATNA NEPAL
59 NE TAPLEJUNG
NEPAL
244 SW SIRAHA NEPAL
255 W HARDINATH
NEPAL
115 SE CHANDRAGNEPAL
156 SE
110 E MACHUWAG
NEPAL
273 W KHOTANG-
NEPAL
87 E MUNGA NEPAL
14 N BHOJPURNEPAL
138 SE BARAKSHE
NEPAL
90 E
98 E DUMUHAN
NEPAL
92 E
Form -17
CHECKLIST OF ENVIRONMENTAL PARAMETERS
INITIAL ENVIRONMENTAL EXAMINATION (IEE)
NAME OF PROJECT : Tuka Irrigation Project,Ajayameru District : Dadeldhura
IEE(D)
Recommended No
Actions affecting Environmental Resources and Values Damages to Environment Significant Impact
Feasibile Protection significa
( A) (B) nt
Measures (C)
Impact Moder
(D1) Small Major
ate
(D2) (D4)
(D3)
i)Loss of precious natural
A. Environmental Effects due to Site Selection resources
ii)Impediment of wildlife and
i)Careful
disruption of local
planning/Design/Operat
economics/ socio-
i)Encroachment into forests/swamp-lands ion plus offsetting
ii)Careful Ö
econiomics
planning/Design/
ii)Impediment to movement of wildife, cattle and people. iii)Loss of precious values operation Ö
iii)Impediment of histrorical/cultural monuments, buildings
and values iv)Socio-economic inequeties Ö
iv)Conficts in water-supply rights Ö
v)Regional flooding/drainage hazards Ö
Recommended No
Actions affecting Environmental Resources and Values Damages to Environment Significant Impact
Feasibile Protection significa
( A) (B) nt
Measures (C)
Impact Moder
(D1) Small Major
ate
(D2) (D4)
(D3)
xi)Project benefits impaired xi) "
xi)Use of agricultural chemicals plus damage to downstream Ö
xii)Project benefits impaired
water-quality
plus environmental
xii)Selection of pesticides contamination xii) " Ö
xiii)Social conflicts/ project
xiii)Land-use conflicts benefits impaired xiii) " Ö
xiv)Inequities in water distribution xiv) " xiv) " Ö
xv)Canal maintenance xv)Project benefits impaired xv) " Ö
xvi)Loss of wildlife plus
disruption of local
xvi)Passageways economics/socio-economics xvi) " Ö
xvii)Scouring hazards xvii)Project benefits impaired xvii) " Ö
C. Problems during Construction Stage i)Careful construction
i)Loss of soil plus damage stage planning plus
i)Erosion control to downstream water qulity monitoring
ii)Careful construction Ö
ii)Adverse environmental stage planning plus
ii)Other construction stage hazards effects
iii) Without this , serious monitoring Ö
adverse effects likely to
iii)Monitoring during construction occur iii)Provision of monitorin Ö
D. Problems stemming from Deficiencies in Operations Ö
i)Careful operation plus
i)Inadequate O&M i)Loss in project efficiency monitoring Ö
ii)Adverse soil modifications ii)Loss in project efficiency ii) " Ö
iii)Adverses effects on other
iii)Changes in ground-water hydrology water- and land-use iii) " Ö
iv)Increase in communicable
diseases in service area and
iv)Water-oriented disease hazards region
v)Adverses effects on vi)
v)Careful use of" Ö
aquaculture and downstream agricultural chemicals
v)Toxic chemicals hazards water-quality
vi)Adverse effects on including training Ö
aquaculture and downstream
vi)Fertilizer runoff hazards water
vii)If notquality
provided, iv) " Ö
opereations inefficiency is vii)Provision of
vii)Operations monitoring likely monitoring
viii)Careful operation to Ö
viii)Serious aquaculture ensure continuing
viii)Aquaculture water supply losses supply Ö
IEE(D)
Recommended No
Actions affecting Environmental Resources and Values Damages to Environment Significant Impact
Feasibile Protection significa
( A) (B) nt
Measures (C)
Impact Moder
(D1) Small Major
ate
(D2) (D4)
(D3)
E. Realization of Enhancement Potentials i)Non-realization of very Ö
valuable socio-economic i)Project component for
i)Community water supply in service area gains
ii Non realizaaytion of very this Ö
valuable socio-economic
ii)Aquaculture in service area gains ii) " Ö
F. Overall Environmental Review Criteria Ö
i)Long-term environmental
i)Unwarranted losses in precious resources and economic gains i)Careful Planning Ö
ii)Long-term environmental
ii)Unwarranted accelerated use of resources for short-term gai and economic gains ii) " Ö
iii)Adverse effects on
iii)Adverse effects on national energy-exchange situation. national economics iii) " Ö
iv)Unwarranted hazards to endangered species losses vi) " Ö
v)Identification of urban
v)Undersirable population-migration to upban sector socio-economics problems v) " Ö
vi)Intensification of national
vi)Increase in affluennt/poor income gap socio-economics imbalances vii) " Ö
Conclusion
The above shows that the effect of cosnstruction of the Project is negligible, and also that an EIA is not calle
Classification
D1
Table 1: Flow Estimation Using MIP Method
1000
900
800
Mean Monthly Flows (lps) 80% Monthly Flows (lps)
700
600
500
400
300
200
100
0
ar
y ry ch r il ay ne Ju
ly st be
r
be
r
be
r
be
r
nu ua ar Ap M Ju gu m to m m
Ja br M Au te Oc ve ce
Fe Se
p
No De
WATER RESOURCES
Name of Project Tuka Irrigation Project,Ajayameru RM-4
Sources: Tuka
Catchment area = 5.59 km2 (Region 2)
Ct = 2.324*log(0.6*T)*log
Perpatually a 0
Catchment AA 5.59
P =(a+6)/(A P= 107.33
Ct= 7.58
Return Peri T= 50 Years
Qt= 24 Cumecs
January 3.00 16.30 47% 0.61 86.40 6.27 12.3 1.89 1.87 2.04
February 5.00 18.70 42% 0.63 103.68 7.00 15.1 2.5 2.35 2.75
March 9.30 22.70 39% 0.76 112.32 7.28 18 3.5 3.25 3.93
April 12.80 26.50 32% 0.80 146.88 8.22 21.2 5.2 4.78 5.34
May 15.30 28.20 36% 1.01 146.88 8.28 22.3 5.74 5.61 5.44
June 18.10 29.60 58% 1.81 129.60 5.72 18.6 4.52 4.83 4.28
July 19.20 28.20 69% 2.08 112.32 4.68 16.8 3.54 3.79 3.49
August 19.30 28.10 67% 2.01 103.68 4.60 16 3.34 3.39 3.31
September 17.50 27.50 65% 1.83 95.04 5.28 15.7 3.21 3.24 3.19
October 13.00 25.80 46% 1.10 86.40 6.85 15.4 3.12 3.14 2.91
November 7.60 21.30 41% 0.74 69.12 7.13 13.4 2.26 2.48 2.15
December 3.50 18.00 39% 0.56 69.12 6.67 11.8 1.8 1.92 1.82
Stations Used
Stations Longitude [° Latitude [°] Altitude [m] Distance [km] Direction
PATAN-(WEST) 80.51 29.43 1256 7.2 N
DADELDHURA 80.58 29.3 1865 11.9 SE
BAITADI 80.4 29.53 1635 19.7 NW
KAKERPAKHA 80.48 29.61 842 26.8 N
PIPALKOT 80.85 29.58 1456 42.3 NE
MAHENDRA-NAGAR 80.21 29.03 176 46.2 SW
SILGARHI-DOTI 80.95 29.25 1360 46.9 E
DARCHULA 80.51 29.81 1097 49.1 N
DHARCHULA 80.53 29.85 817 53.7 N
KATAI 81 29 1388 64.6 SE
Stations Used
Stations Longitude [ Latitude [° Altitude [m Distance [k Direction
PATAN-(WEST) 80.51 29.43 1256 7.2 N
DADELDHURA 80.58 29.3 1865 11.9 SE
BAITADI 80.4 29.53 1635 19.7 NW
KAKERPAKHA 80.48 29.61 842 26.8 N
PIPALKOT 80.85 29.58 1456 42.3 NE
MAHENDRA-NAGAR 80.21 29.03 176 46.2 SW
SILGARHI-DOTI 80.95 29.25 1360 46.9 E
DARCHULA 80.51 29.81 1097 49.1 N
KATAI 81 29 1388 64.6 SE
CHAINPUR-(WEST) 81.2 29.53 1304 71.4 E
Temperature Estimate
Mean Monthly Temperature
est Estimateow Estimate igh Estimatetandard Error Bias
Months [°C] [°C] [°C] [°C] [°C]
January 10.00 6.30 13.70 3.70 (0.62)
February 11.80 7.69 15.91 4.11 (0.73)
March 15.80 11.12 20.48 4.68 (0.88)
April 19.70 14.98 24.42 4.72 (0.73)
May 21.70 17.05 26.35 4.65 (0.71)
June 23.70 19.47 27.93 4.23 (0.59)
July 23.70 19.78 27.62 3.92 (0.57)
August 23.70 19.75 27.65 3.95 (0.60)
September 22.50 17.89 27.11 4.61 (0.77)
October 19.30 15.20 23.40 4.10 (0.69)
November 14.80 11.28 18.32 3.52 (0.61)
December 11.00 7.90 14.10 3.10 (0.52)
Mean 18.14 14.03 22.25 4.11 (0.67)
Months/Sub Jan Feb Mar Apr May June July Aug Sep Oct Nov Dec
1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2
1 Eto Value mm/day 1.87 2.04 2.35 2.75 3.25 3.93 4.78 5.34 5.61 5.44 4.83 4.28 3.79 3.49 3.39 3.31 3.24 3.19 3.14 2.91 2.48 2.15 1.92 1.82
2 80% Reliable Rainfall 5.73 7.68 11.26 12.94 14.05 14.36 11.20 17.20 33.61 43.99 43.98 64.83 ### ### ### ### 65.23 37.18 8.79 (4.39) 0.10 0.10 4.35 6.05
3 Crop Coefficient (Kc)
1 M Paddy MP 1.10 1.10 1.10 1.10 1.05 1.05 0.95 0.95
2 Wheat Wh 1.15 1.15 1.15 0.90 0.40 0.43 0.65 1.05
3 S Maize SM 0.45 0.60 0.80 1.05 1.05 1.05 0.80
4 W Potato WPo 0.79 1.01 1.13 1.13 1.08 0.94 0.77 0.42 0.55
5 W Pulses WPu 0.50 0.75 0.95 1.05 1.05 0.96 0.40
6 W Vegetables Wve 0.86 0.95 0.95 0.89 0.28 0.34 0.54
5 Land Preparation
a M Paddy MP 55.00 55.00 50.00 50.00
a S Paddy SP 55.00 55.00 50.00 50.00
b Wheat Wh 60.00
6 Deep Percolation
a M Paddy MP 75.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00
a S Paddy SP 75.00 75.00 75.00 75.00 75.00 75.00 75.00
8 Effective Rainfall 4.87 6.52 9.57 11.00 11.94 12.20 9.52 14.62 28.57 37.39 37.38 55.10 82.16 93.12 89.23 76.53 55.44 31.60 7.47 - - - - 5.14
Months/Sub Jan Feb Mar Apr May June July Aug Sep Oct Nov Dec
1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2
11 Net CWR l/s/ha per half month
1 M Paddy MP - - - - - - - - - - - 1.197 0.917 0.690 0.708 0.410 0.563 0.723 0.903 0.899 0.273 - - -
2 Wheat Wh 0.211 0.221 0.239 0.202 0.058 - - - - - - - - - - - - - - - - 0.570 0.144 0.182
3 S Maize SM - - - - 0.077 0.179 0.369 0.536 0.461 0.373 0.159 - - - - - - - - - - - - -
4 W Potato WPo 0.133 0.188 0.233 0.275 0.314 0.333 0.353 - - - - - - - - - - - - - - - 0.093 0.076
5 W Pulses WPu 0.071 0.127 0.185 0.249 0.303 0.343 - - - - - - - - - - - - - - - - - 0.045
6 W Vegetables Wve 0.149 0.174 0.185 0.198 - - - - - - - - - - - - - - - - - 0.070 0.076 0.074
12 Net CWR l/s/ha per month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 M Paddy MP - - - - - 1.20 1.61 1.12 1.29 1.80 0.27 -
2 Wheat Wh 0.43 0.44 0.06 - - - - - - - 0.57 0.33
3 S Maize SM - - 0.26 0.91 0.83 0.16 - - - - - -
4 W Potato WPo 0.32 0.51 0.65 0.35 - - - - - - - 0.17
5 W Pulses WPu 0.20 0.43 0.65 - - - - - - - - 0.04
6 W Vegetables Wve 0.32 0.38 - - - - - - - - 0.07 0.15
Table 4: Irrigattion Water Requirement & Water Balance Tuka Irrigation Project,Ajayameru RM-4
(CCA) 10 ha Total Coverage 19.5 ha
Cropping Intensity 195%
S.N Particular Unit Paddy (Local) Wheat S Maize W Vegetable W Pulses Potato
Incomes
1 Yield (t/ha) 4.0 3.0 3.0 8.0 1.5 10.2
Farm-gate Price NRs/t 35000.00 35000.00 30000.00 40000.00 120000.00 35000.00
Gross Income NRs/ha 140000.00 105000.00 90000.00 320000.00 180000.00 357000.00
Expenses
1 Seed kg/ha 30 120 25 12 27 2000
Price (=0.0012*FG Pric NRs/kg 42.00 42.00 36.00 48.00 144.00 42.00
Value NRs/ha 1260.00 5040.00 900.00 576.00 3888.00 84000.00
2 Chemical Fert.
a N kg/ha 64 64 12 50 12 40
Price (Urea, 46%N=17/k NRs/kg 41.39 41.39 41.39 41.39 41.39 41.39
Value NRs/ha 2663.44 2663.44 503.89 2087.56 503.89 1673.65
b P kg/ha 40 40 20 50 20 50
Price (TSP,48%P=22/kg NRs/kg 100.04 100.04 100.04 100.04 100.04 100.04
Value NRs/ha 4001.74 4001.74 2000.87 5002.17 2000.87 5002.17
c K kg/ha 20 20 10 40 10 30
Price (MOP,60%K=16/k NRs/kg 53.37 53.37 53.37 53.37 53.37 53.37
Value NRs/ha 1067.33 1067.33 533.67 2134.67 533.67 1601.00
Agro-chemicals NRs/ha 200.00 260.00 240.00 280.00 240.00 400.00
Human labour md/ha 115 60 65 200 65 180
Price Nrs./Md 525 525 525 525 525 525
Value NRs/ha 60375.00 31500.00 34125.00 105000.00 34125.00 94500.00
Animal Labour md/ha 44 35 22 50 22 50
Price Nrs./Md 500 500 500 500 500 500
Value NRs/ha 22000.00 17500.00 11000.00 25000.00 11000.00 25000.00
Others @5% 4578.38 3101.63 2465.17 7004.02 2614.57 10608.84
Total Expenses NRs/ha 96145.89 65134.14 51768.60 147084.42 54906.00 222785.66
Net Returns NRs/ha 43854.11 39865.86 38231.40 172915.58 125094.00 134214.34
FORM -16
DERIVATION OF INCREMENTAL BENEFIT
Name of Project :- Tuka Irrigation Project,Ajayameru RM-4
Command Area : 10 ha District: Dadeldhura
Without Project With Project
Crop
Yield Benefits/ Total Crop Crop Yield Benefits/h Total Crop
Crop Name Area
(T/ha) ha (Nrs) benefit NRs Area (Ha) (T/ha) a (Nrs) benefit NRs
(Ha)
Paddy (Local) 3 2.40 10734.89 32204.67 8 4.00 43854.11 328905.84
Wheat 2 1.70 6404.29 12808.58 5 3.00 39865.86 199329.31
Spring Maize 1 1.60 8023.20 8023.20 2 3.00 38231.40 76462.80
Winter Vegetables 1 4.00 25008.52 25008.52 2 8.00 172915.58 345831.16
W Pulses 1 0.50 16716.76 16716.76 1 1.50 125094.00 125094.00
Potato 1 6.20 4431.17 2215.59 2 10.20 134214.34 268428.67
Total, NRs 9 96,977.31 20 1,344,051.77
Cropping Intensi 85% 195%
4 Present Inputs:
Chemical Fertilizer, Kg/ha Pesticid
Seed Labour
Crop es
Kg/ha N P K md/ha
Nrs/ha
Paddy (HYV) 30 20 10 0 100 @5%
Wheat 120 30 20 10 200 @5%
S Maize 25 10 5 0 90 @5%
Winter Vegeta 12 80 50 10 200 @5%
W Pulses 27 10 5 0 170 @5%
Potato 2000 50 20 0 200 @5%
4 Command Area
Gross Command Area : 13.6 ha
Culturable Command Area : 10 ha
5 Environment
Landslide Zone : Seen
Soil Erosion : Seen
IEE Evaluation : D1
6 Institutional and Sociology
Population : 150
Households : 25
WUA Committee : Formed
Water Right Conflict : Not Found
7 Source Stream
Name : Tuka Khola
Type : Perennial
Catchment Area(Basini) : 5.59 km2
Minimum Discharge : 38.00 lps
8 Distribution System
8.a Intake System
Design Discharge : 0.01 cumec
Intake Structure : Side Intake
8.b Pipe System
Main Pipe Length
Hdpe Pipe 125mm dia 6kg/cm2 1419 m
Hdpe Pipe 125mm dia 10kg/cm2 1864.5 m
9 Cost Analysis
Project Implementation Cos : ### NRs Yet to be Done
Cost per Hectare : 1,000,000.00 NRs Yet to be Done
10 Econonic Analysis
Economic Internal Rate of : 10.03% Yet to be Done
Benifit Cost Ratio
at 10% : 1.10 Yet to be Done
at 12% : 0.96 Yet to be Done
11 Agriculture
Existing Cropping Pattern : Paddy/Wheat/Maize/Potato
Proposed Cropping Pattern : Paddy/Wheat/Maize/Potato
Present Cropping Intensity : 85%
Future Cropping Intensity : 195%
12 Implementation Schedule
Date of Commencement : FY 075/76
Expected Date of Completi : FY 077/78
13 Recommendations : Recommended for Implementation
Sensitivity analysis
Main Canal
30 ha/70 lps
Ch. 3+000
Proposed SP Structure
Ch 4+050