Why AVR?
(Automatic Voltage Regulation)
A little Analogy
System load
I
Actuator U
ED VACUTAP®
Setpoint
TAPCON® 230 Desired line voltage
System load
I
Actuator U
ED VACUTAP®
Setpoint
TAPCON® 230 Desired line voltage
Why MR?
(Maschinenfabrik Reinhausen)
Made in Germany
…more than 60 %!
Made in Germany
…more than 80 %!
1971 1979 1988 1989 1997 1999 2001 2003 2007 2008 2009 2012
PQ systems
Temperature Sensors
Maintenance Free
for OLTC &
Silicagel Breather
Main Tank
Winding~ and
Oil Thermometer
Digital Oil
Temperature
Sensors Automatic
Voltage
Regulation
Intelligent
Fan Control
Special Application
Motor Drive unit (PST, Generator)
SCADA Integration
Date: 09.05.2012
Voltage Regulation TAPCON® 230 Features Versions Quality & Service
Product Features
Tap Position Indication 0 … 20 mA, Resistor contact range, BCD Code, selectable via Display
3 desired voltage levels 49 … 140 V (-51% + 40% - VT Output = 100 V, selectable localy or
from remote via digital Inputs or via SCADA Protocol)
Safety Features
{ to assure, that the transformer units can not run apart in parallel mode, e.g if the CAN-BUS
connection is interrupted
4
6
Pos 3 Pos 4
{ Additional limitation of regulating range. Outside of this range, the Automatic Voltage
Regulation is disabled.
| Flexibility
{ 8 individually programmable inputs (Pull-down Menu)
{ 7 individually programmable outputs (Pull-down Menu)
{ Tap position indication selectable on the display
{ Additional DC power supply integrated
| Additional Values
{ Compensation of losses on overhead / cable lines
{ Parallel control of up to 6 transformers in two groups
{ Master / Follower method
{ Method of Circulating Reactive Current Minimization
| Robust Design
{ IEC-Values „doubled“ e.g.
{ ESD – 8kV/15kV (IEC 4kV/8kV) or
{ Burst – 6,5kV (IEC 2kV/4kV)
| MR - System Benefit
{ 100% compatible with MR OLTC & MR Motor drive unit
Plug-in connection diagram without illustration of interfaces and exclusively in English; in documentation with illustration of interfaces
Additional Values
o Compensation of losses
on overhead / cable lines
Z Compensation
Uz
Uz*
Voltrise = x 100%
U
Benefits
- can be used with minor changes in the phase angle φ *Current 100%
- not dependent on phase angle φ
- simple to set Voltage rise: 0 … 15 % of desired value
- can also be used in meshed grids Limit: 0 … 15 % of desired value
Ur Ux
Requirements
The LDC compensation requires a good knowledge of the of the R and X of the overhead/cable lines.
Are the parameter not known, can they be usually set using the aproximation & test method.
Additional Values
CB CB
L+ ext. logic
L+
& & &
LV
CB
TAPCON® 230 © Copyright MR Maschinenfabrik Reinhausen GmbH 12-05-09 26
Voltage Regulation TAPCON® 230 Features Versions Quality & Service
Application Example 2
Parallel Mode Application for a Spare Transformer
HV
Inputs TAPCON
1 Input parallel group 1
Motor 2 Input parallel group 2 Motor
drive 3 Input Master/Follower drive
CB CB
Product Versions
3 different Versions
Communication
&
Protocols
RJ45 Optical
RS-232 RS-485 Optical
(ETHERNET) (ETHERNET)
DNP3 – Level 2 x x x x
MODBUS ASCII x x x
MODBUS RTU x x x x
MODBUS TCP
IEC60870-5-101 x x x
IEC60870-5-103 x x x
IEC61850 x x
Card 1 or Card 2
IEC60870-5-101/103,
DNP3, IEC61850
Modbus
Optical LC 1300 nm –
Ethernet
Standard RS-232; RS-485
RJ45 – Ethernet
(interchangeable on unit)
Communication Card 1
Communication Card 2
IEC61850
Optical LC 1300nm – Ethernet
Standard
RJ45 – Ethernet (interchangeable on unit)
When required:
Plug adaptor LC to ST
Commissioning
&
Configuration
Menu bar
Toolbar with action buttons
Function tree
Status bar
| Connect to the Tapcon, download and modify the configuration using the Visualisation Software on
the Laptop
| Get a default ICD file from MR (w/o IED name, IP address, MAC address)
Hardware
| Parts FMEA (Failure Mode and Effects Analysis) on single components
| Extended FMEA during entire production process
| AOI (Automatic Optical Inspection) after every production step
| ICT (In Circuit Test) on every printed circuit board
| Visual and computer controlled Function Test on every assembled device
| High Voltage Test of every finalized device
| 24 hours long term Burn In Test (one test per 50 TAPCON®)
Firmware
| Individual functional tests on every single TAPCON® 230
| Complete testing of all functionalities of firmware as installed on the TAPCON® 230
Service