Sequence for “Chinese” Digester

Figure 1 Start of digestion

Figure 2 Filling and Biogas Generation

1 Paul Harris
harrisfm@aapt.net.au
Figure 3 Maximum Pressure - gas should be burned off before this point!

Figure 4 As gas is burned liquid returns to the digester, replacing the gas volume to maintain fairly constant pressure.