Professional Documents
Culture Documents
Questionaire
Questionaire
The purpose of the questionnaire is to collect data for the above final year research project.
1. To identify the factor that cause construction waste during design phase
2. To suggest better solution to solve the problem about construction waste during
design phase.
Section C: Solutions to solve the problem about construction waste during design phase
All information given will be kept with utmost confidentially and it is for education purpose
only. Your cooperation and time will be highly appreciated in completing this questionnaire.
Prepared by
Student:
JASON CHONG JIE SHENG (AP160206)
Bachelor Degree of Technology Management (Construction Management)
Faculty of Technology Management and Business
University Tun Hussein Onn Malaysia
Tel: 017-805 5857
Supervisor:
ASSOCIATE PROFESSOR DR SEOW TA WEE
Faculty of Technology Management and Business
University Tun Hussein Onn Malaysia
Section A: Respondent’s background information.
Instruction: Please choose ONE answer from the following options for each question.
1. Gender
A. Male
B. Female
2. Age
A. 25 – 35 years old
B. 36 – 45 years old
C. 46 – 55 years old
D. 56 years old and above
3. What is your position in organization?
A. Project Manager
B. Project Engineer
C. Engineer Site
D. Engineer
E. Others (Please Specify…………………………)
4. How long you have been working in the construction industry?
A. 0 – 5 years
B. 5 – 10 years
C. 10 – 15 years
D. 15 – 20 years
E. 21 years and above
5. What type of projects undertaken by you?
A. Government
B. Private
C. Both/ mix
Section B: FACTOR THAT CAUSE CONSTRUCTION WASTE DURING
DESIGN PHASE
Instruction: The following that Likert Scale 1 – 5 are relevant to investigate the
factor that cause construction waste during design phase.
5. Which are the common factor that cause construction waste during design phase
a) Frequent design change 1 2 3 4 5
b) Design errors 1 2 3 4 5
c) Lack of design information 1 2 3 4 5
d) Poor design quality 1 2 3 4 5
e) Slow drawing distribution 1 2 3 4 5
f) Incomplete contract document 1 2 3 4 5
g) Complicated design 1 2 3 4 5
h) Inexperience designer 1 2 3 4 5
i) Error in contract documentation 1 2 3 4 5
j) Interaction between various specialists 1 2 3 4 5
k) Too many suppliers which is not easy to select 1 2 3 4 5
l) Poor coordination of parties during design stage 1 2 3 4 5
m) Last minute client requirements 1 2 3 4 5
n) Challenge of lack of awareness with material 1 2 3 4 5
management
o) Poor scheduling of construction materials on site 1 2 3 4 5
p) Improper arrangement of materials 1 2 3 4 5
q) Poor communication between parties in materials 1 2 3 4 5
management
r) Poor storage of facilities of materials 1 2 3 4 5
Others (Please Specify):
Instruction: The following that Likert Scale 1 – 5 are relevant to suggest the better
solution to solve the problem about construction waste during design phase.
8. In your opinion, what are the best recommendations to reduce the construction
waste generated at the construction site?
THANK YOU FOR YOUR COOPERATION