[Type here] detailed work procedure of /floor and wall tiling [Type here]
Material Consumption statement
S.NO Items of work Unit Cement White Surkhi Fine Coarse Bricks Stone Stone Brick Water . Bag Lime Cum Sand Sand Nos grite Ballast Ballast proof Cum Cum Cum cum Cum Cum compou nd Kg 1 2 3 4 5 6 7 8 9 10 11 12 13 Lime conc. With 40 mm gauge Brick Ballast 1 Cum 0.15 0.30 1.00 100:16:32 Lime conc. With 40 mm gauge Brick Ballast 2 Cum 0.18 0.36 1.00 100:18:36 Cement conc. With 40 mm gauge Brick 3 Cum 2.25 0.48 1.00 Ballast 1:6:12 Cement conc. With 40 mm gauge Brick 4 Cum 2.83 0.50 1.00 Ballast 1:5:10 Cement conc. With 40 mm gauge Brick 5 Cum 3.44 0.50 1.00 Ballast 1:4:8 Cement conc. With 40 mm gauge Stone 6 Cum 6.74 0.45 0.90 Ballast 1:2:4 Cement conc. With 40 mm gauge Stone 7 Cum 4.49 0.465 0.92 Ballast 1:3:6 Cement conc. With 40 mm gauge Stone 8 Cum 3.44 0.50 1.00 Ballast 1:4:8 9 R.C.C. work with 20 mm stone grit in 1:2:4 Cum 6.66 0.45 0.90 R.C.C. work with 20 mm stone grit in 10 Cum 8.68 0.425 0.85 1:1/2:3 11 Brick work with white lime and surkhi in 1:2 Cum 0.11 0.22 460 12 Brick work with white lime and surkhi in 1:3 Cum 0.08 0.24 460 Brick work with cemennt and fine sand in 13 Cum 1.26 0.27 460 1:6 Brick work with cemennt and fine sand in 14 Cum 1.57 0.27 460 1:5 Brick work with cemennt and fine sand in 15 Cum 1.86 0.27 460 1:4 Brick work with cemennt and fine sand in 16 Cum 2.48 0.27 460 1:3 R.B. work with cemennt and coarse sand in 17 Cum 3.74 0.33 425 1:3 20 mm thick DPC with cement and coarse 18 Sqm 0.27 0.02 0.27 sand in 1:2 [Type here] detailed work procedure of /floor and wall tiling [Type here]
25 mm thick DPC with cement, coarse sand
19 Sqm 0.25 0.011 0.023 0.25 stone grite in 1:1/2:3 10 mm thick plaster with cement and fine 20 Sqm 0.063 0.013 sand in 1:6 21 12 mm thick plaster in 1:3 Sqm 0.152 0.015 22 12 mm thick plaster in 1:4 Sqm 0.114 0.015 23 12 mm thick plaster in 1:5 Sqm 0.091 0.015 24 12 mm thick plaster in 1:6 Sqm 0.075 0.015 25 15 mm thick plaster in 1:6 Sqm 0.095 0.019 12 mm thick plaster with cement, white 26 Sqm 0.075 0.0024 0.012 0.0024 lime, coarse sand and fine sand in 1:1:1:5 12 mm thick plaster with cement, white 27 Sqm 0.075 0.0021 0.010 0.005 lime, coarse sand and fine sand in 1:1:2:4 12 mm thick plaster with cement, white lime 28 Sqm 0.057 0.057 0.019 and fine sand in 1:1:6 29 Extra for rough face plaster Sqm 10% extra on each item 15 mm thick plaster rough face with cement, 30 Sqm 0.09 0.019 lime and fine sand in 1:1:6 31 3 mm neat cement floating coat Sqm 0.03 Making drip coarse with cement and coarse 32 Mt 0.108 0.00068 sand in 1:3 33 15 mm thick sand faced plaster in 1:2 Sqm 0.285 0.099 0.080 34 Struck cement pointing in 1:2 Sqm 0.045 0.003 35 15 mm thick Dado in 1:2 Sqm 0.30 0.015 36 15 mm thick Dado in 1:3 Sqm 0.182 0.015 37 20 mm thick Dado in 1:2 Sqm 0.40 0.018 20 mm thick marble dado with 8 mm thick 38 Sqm 0.23 0.015 0.108 topping 20 mm thick marble dado with 5 mm thick 39 Sqm 0.182 0.015 0.173 topping 40 15 mm thick CC floor in 1:2:4 Sqm 0.219 0.011 0.023 41 40 mm thick CC floor in 1:2:4 Sqm 0.296 0.02 0.04 25 mm thick Granolothick marble floor with 42 Sqm 0.189 0.012 0.022 0.108 5 mm thick surface coat (topper) 25 mm thick Granolothick marble floor with 43 0.160 0.012 0.022 0.123 5 mm topping 40 mm thick Granolothick marble floor with 44 Sqm 0.331 0.020 0.040 0.108 5 mm topping 40 mm thick Granolothick marble floor with 45 Sqm 0.302 0.020 0.040 0.173 8 mm topping [Type here] detailed work procedure of /floor and wall tiling [Type here]
6 mm china white glazed tileswith cement
46 Sqm 0.344 0.108 and coarse sand in 1:3 47 Brick on edge floor sand filled Sqm 0.03 59 48 Flat Brick floor sand filled Sqm 0.024 38 49 Brick edging along apron Rm 0.021 0.0023 4.35 Mud phaska with cement and coarse sand in 50 Sqm 0.100 0.0108 38 1:3 51 RCC Jali 25 mm-40 mm Sqm 0.26 52 RCC Jali 65 mm-75 mm Sqm 0.45 53 RCC 1:2:4 with river single Sqm 6.10 0.45 0.85 54 Laying 60/80 mm thick interlocking tiles Sqm 35 55 White washing three coat Sqm 0.325 kg/sqm 56 Cement wash Sqm 0.013 kg/sqm Finishing walls with two coat waterproof White 0.018 Snow 0.36 57 Sqm cement paint over one coat primer cement kg/sqm cem kg/sqm 0.075 0.124 58 Two coat painting over one coat primer Sqm Primer Paint ltr/sqm ltr/sqm Wax 0.05 59 Wax polish for floor Sqm polish kg/sqm 60 M.S. iron work Qtl 2.50% Wastage on steel