DRAFT FESIBILITY REPORT SH-22 Road Cost Estimate of Hume Pipe Culverts

(Sahajpur-Ghatkhedi-Salabarru-Pratapgarh-Ghatkhedi-Pipliyakewat Road)

JOBAT-NANPUR ROAD
Summary of Hume Pipe Culvert
Sr. No. Description Cost in Rs. Cost in Cr.
1 Estimate of HPC @ 0730 522,125.63 0.052
2 Estimate of HPC @1120 #REF! #REF!
3 Estimate of HPC @1535 #REF! #REF!
4 Estimate of HPC @3175 #REF! #REF!
5 Estimate of HPC @3545 #REF! #REF!
6 Estimate of HPC @4028 #REF! #REF!
7 Estimate of HPC @4070 #REF! #REF!
8 Estimate of HPC @5023 #REF! #REF!
9 Estimate of HPC @5737 #REF! #REF!
10 Estimate of HPC @5860 #REF! #REF!
11 Estimate of HPC @5975 #REF! #REF!
12 Estimate of HPC @6108 #REF! #REF!
13 Estimate of HPC @7170 #REF! #REF!
14 Estimate of HPC @7525 #REF! #REF!
15 Estimate of HPC @8022 #REF! #REF!
16 Estimate of HPC @9123 #REF! #REF!
17 Estimate of HPC @10010 #REF! #REF!
18 Estimate of HPC @10335 #REF! #REF!
19 Estimate of HPC @10540 #REF! #REF!
20 Estimate of HPC @10749 #REF! #REF!
21 Estimate of HPC @10927 #REF! #REF!
22 Estimate of HPC @15780 #REF! #REF!
23 Estimate of HPC @16150 #REF! #REF!
24 Estimate of HPC @16960 #REF! #REF!
25 Estimate of HPC @19620 #REF! #REF!
26 Estimate of HPC @20305 #REF! #REF!
27 Estimate of HPC @20475 #REF! #REF!
28 Estimate of HPC @21550 #REF! #REF!
29 Estimate of HPC @22610 #REF! #REF!
30 Estimate of HPC @22920 #REF! #REF!
31 Estimate of HPC @23050 #REF! #REF!
32 Estimate of HPC @23355 #REF! #REF!
33 Estimate of HPC @23440 #REF! #REF!
34 Estimate of HPC @23905 #REF! #REF!
35 Estimate of HPC @24140 #REF! #REF!
36 Estimate of HPC @24465 #REF! #REF!
37 Estimate of HPC @25465 #REF! #REF!
38 Estimate of HPC @25465 #REF! #REF!
39 Estimate of HPC @27145 #REF! #REF!
40 Estimate of HPC @27230 #REF! #REF!
41 Estimate of HPC @27625 #REF! #REF!
42 Estimate of HPC @28740 #REF! #REF!

Lion Engineering Consultants 1


DRAFT FESIBILITY REPORT SH-22 Road Cost Estimate of Hume Pipe Culverts
(Sahajpur-Ghatkhedi-Salabarru-Pratapgarh-Ghatkhedi-Pipliyakewat Road)

JOBAT-NANPUR ROAD
Summary of Hume Pipe Culvert
Sr. No. Description Cost in Rs. Cost in Cr.
43 Estimate of HPC @2855 #REF! #REF!
44 Estimate of HPC @30835 #REF! #REF!
45 Estimate of HPC @31085 #REF! #REF!
46 Estimate of HPC @31320 #REF! #REF!
47 Estimate of HPC @31790 #REF! #REF!
48 Estimate of HPC @32022 #REF! #REF!
49 Estimate of HPC @32365 #REF! #REF!
50 Estimate of HPC @32820 #REF! #REF!
51 Estimate of HPC @33630 #REF! #REF!
Estimate of HPC @34060
Estimate of HPC @35906
Estimate of HPC @36685
Estimate of HPC @36800
Estimate of HPC @37130

Lion Engineering Consultants 2


DRAFT FESIBILITY REPORT SH-22 Road Cost Estimate of Hume Pipe Culverts
(Sahajpur-Ghatkhedi-Salabarru-Pratapgarh-Ghatkhedi-Pipliyakewat Road)

JOBAT-NANPUR ROAD
Summary of Hume Pipe Culvert
Sr. No. Description Cost in Rs. Cost in Cr.

Lion Engineering Consultants 3


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 300 Dia


Pipe Culvert @ 0+730
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 .
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 4


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 300 Dia


Pipe Culvert @ 0+730
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.63 1.40 1.22 22.65
Pipe Portion 1 14.85 1.60 0.79 18.77
For stone pitching for Apron on the u/s side 1 1.50 6.63 0.50 4.97
For stone pitching for Apron on the d/s side 1 3.00 6.63 0.50 9.95
Total 56.34 52.00 2929.47095999993
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.63 1.40 0.15 2.78 3409.00 9492.7014
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 12422.1723599999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.43 0.825 4.256 45.15
Deduction of Pipe -1 3.14 0.360 0.817 (0.92)
Encasing of Pipe 1 15.60 1.600 0.890 22.21
Deduction of Pipe -1 15.30 3.142 0.023 (1.08)
Total 65.363 5396.00 352698.38915374
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 17.50 17.50 5668.00 99190


b) 1200mm dia meter 1 0.00 - 7713.00 0
Total for Sub-structure (C) 451888.38915374
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.43 15.20 1.85 180.81


Deduction of Pipe Portion -1 15.20 1.60 0.57 (13.86)
Total 166.95 144.00 24040.6848
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.43 4.26 54.73 48.00 2627.14368
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 5


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 300 Dia


Pipe Culvert @ 0+730
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.43 0.3 2.89
For Apron on the d/s side 1 3.00 6.43 0.3 5.79
For slopes 4 1.54 2.70 0.3 4.99
Total 13.67 2033.00 27791.3133
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 57815.06378


Cost of One Culvert (A+B+C+D) 1 No. 522125.62529374

Lion Engineering Consultants 6


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 1+120
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 1 6.90 6.90 183.00 1262.7
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1262.70

Lion Engineering Consultants 7


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 1+120
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.20 22.98
Pipe Portion 1 12.35 1.84 0.77 17.50
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 55.87 52.00 2905.23375999997
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 12698.60896


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 8


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 1+120
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 338405.149831747

Lion Engineering Consultants 9


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 1+535
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 10


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 1+535
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 19.85 1.84 0.79 28.85
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 67.61 52.00 3515.68879999991
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 13309.0639999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 20.60 1.840 1.800 68.23
Deduction of Pipe -1 20.30 3.142 0.360 (22.96)
Total 73.410 5396.00 396117.734061052
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 22.50 22.50 7713.00 173542.5
Total for Sub-structure (C) 569660.234061052
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 20.20 2.09 280.33


Deduction of Pipe Portion -1 20.20 1.84 0.57 (21.19)
Total 259.14 144.00 37316.41344
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 11


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 1+535
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 70754.71784


Cost of One Culvert (A+B+C+D) 1 No. 653724.02

Lion Engineering Consultants 12


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 3+175
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 1 9.00 9.00 183.00 1647
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1647.00

Lion Engineering Consultants 13


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 3+175
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 24.85 1.84 0.79 36.12
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 74.88 52.00 3893.6247999999
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 13686.9999999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 25.60 1.840 1.800 84.79
Deduction of Pipe -1 25.30 3.142 0.360 (28.61)
Total 84.315 5396.00 454961.832935265
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 27.50 27.50 7713.00 212107.5
Total for Sub-structure (C) 667069.332935265
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 25.20 2.09 349.72


Deduction of Pipe Portion -1 25.20 1.84 0.57 (26.43)
Total 323.29 144.00 46553.14944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 14


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 3+175
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 79991.45384


Cost of One Culvert (A+B+C+D) 1 No. 762394.79

Lion Engineering Consultants 15


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 3+545
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 16


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 3+545
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 19.85 1.84 0.79 28.85
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 67.61 52.00 3515.68879999991
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 13309.0639999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 22.50 22.50 7713.00 173542.5
Total for Sub-structure (C) 325391.727031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 20.20 2.09 280.33


Deduction of Pipe Portion -1 20.20 1.84 0.57 (21.19)
Total 259.14 144.00 37316.41344
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 17


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 3+545
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 70754.71784


Cost of One Culvert (A+B+C+D) 1 No. 409455.51

Lion Engineering Consultants 18


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 4+028
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 19


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 4+028
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 56.71 52.00 2948.78479999994
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 12742.1599999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 20


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 4+028
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 337186.00

Lion Engineering Consultants 21


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 4+870
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 22


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 4+870
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 56.71 52.00 2948.78479999994
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 12742.1599999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 13.10 1.840 1.800 43.39
Deduction of Pipe -1 12.80 3.142 0.360 (14.48)
Total 57.052 5396.00 307851.585749732
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 423546.585749732
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 23


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 4+870
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 493188.36

Lion Engineering Consultants 24


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 5+023
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 1 10.20 10.20 183.00 1866.6
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1866.60

Lion Engineering Consultants 25


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 5+023
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 19.85 1.84 0.79 28.85
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 67.61 52.00 3515.68879999991
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 13309.0639999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 22.50 22.50 7713.00 173542.5
Total for Sub-structure (C) 325391.727031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 20.20 2.09 280.33


Deduction of Pipe Portion -1 20.20 1.84 0.57 (21.19)
Total 259.14 144.00 37316.41344
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 26


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 5+023
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 70754.71784


Cost of One Culvert (A+B+C+D) 1 No. 411322.11

Lion Engineering Consultants 27


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 5+737
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 1 8.30 8.30 183.00 1518.9
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1518.90

Lion Engineering Consultants 28


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 5+737
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 19.85 3.88 0.79 60.84
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 99.60 52.00 5179.18231999985
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 14972.5575199999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -2 3.14 0.518 0.817 (2.66)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 26.811 5396.00 144669.484623494
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 2 0.00 - 5668.00 0


b) 1200mm dia meter 2 22.50 45.00 7713.00 347085
Total for Sub-structure (C) 491754.484623494
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 20.20 2.09 280.33


Deduction of Pipe Portion -1 20.20 3.88 0.57 (44.67)
Total 235.65 144.00 33934.0608
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 29


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 5+737
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 67372.3652


Cost of One Culvert (A+B+C+D) 1 No. 575618.31

Lion Engineering Consultants 30


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 5+860
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 1 8.40 8.40 135.00 1134
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1134.00

Lion Engineering Consultants 31


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 5+860
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 17.35 1.84 0.79 25.22
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 63.98 52.00 3326.72079999992
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 13120.0959999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 20.00 20.00 7713.00 154260
Total for Sub-structure (C) 306109.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 17.70 2.09 245.63


Deduction of Pipe Portion -1 17.70 1.84 0.57 (18.56)
Total 227.07 144.00 32698.04544
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 32


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 5+860
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 66136.34984


Cost of One Culvert (A+B+C+D) 1 No. 386499.67

Lion Engineering Consultants 33


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 5+975
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 1 8.00 8.00 183.00 1464
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1464.00

Lion Engineering Consultants 34


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 5+975
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 19.85 1.84 0.79 28.85
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 67.61 52.00 3515.68879999991
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 13309.0639999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 22.50 22.50 7713.00 173542.5
Total for Sub-structure (C) 325391.727031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 20.20 2.09 280.33


Deduction of Pipe Portion -1 20.20 1.84 0.57 (21.19)
Total 259.14 144.00 37316.41344
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 35


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 5+975
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 70754.71784


Cost of One Culvert (A+B+C+D) 1 No. 410919.51

Lion Engineering Consultants 36


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 6+108
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 2 8.30 16.60 312.00 5179

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 5179.00

Lion Engineering Consultants 37


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 6+108
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 9.08 1.40 1.22 31.02
Pipe Portion 1 12.35 3.88 0.79 37.86
For stone pitching for Apron on the u/s side 1 1.50 9.08 0.50 6.81
For stone pitching for Apron on the d/s side 1 3.00 9.08 0.50 13.62
Total 89.30 52.00 4643.72999999989
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 9.08 1.40 0.15 3.81 3409.00 13000.5624
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 17644.2923999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 8.88 0.825 2.690 39.41
Deduction of Pipe -2 3.14 0.518 0.817 (2.66)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 36.753 5396.00 198317.811663494
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 2 0.00 - 5668.00 0


b) 1200mm dia meter 2 15.00 30.00 7713.00 231390
Total for Sub-structure (C) 429707.811663494
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 8.88 12.70 2.09 235.70


Deduction of Pipe Portion -1 12.70 3.88 0.57 (28.09)
Total 207.61 144.00 29896.49088
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 8.88 2.69 47.77 48.00 2293.1712
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 38


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 6+108
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 8.88 0.3 4.00
For Apron on the d/s side 1 3.00 8.88 0.3 7.99
For slopes 4 1.54 2.70 0.3 4.99
Total 16.98 2033.00 34515.4608
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 70061.04488


Cost of One Culvert (A+B+C+D) 1 No. 522592.15

Lion Engineering Consultants 39


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 7+170
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 1 8.30 8.30 135.00 1120.5
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1120.50

Lion Engineering Consultants 40


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 7+170
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 19.85 1.84 0.79 28.85
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 67.61 52.00 3515.68879999991
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 13309.0639999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 20.60 1.840 1.800 68.23
Deduction of Pipe -1 20.30 3.142 0.360 (22.96)
Total 73.410 5396.00 396117.734061052
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 22.50 22.50 7713.00 173542.5
Total for Sub-structure (C) 569660.234061052
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 20.20 2.09 280.33


Deduction of Pipe Portion -1 20.20 1.84 0.57 (21.19)
Total 259.14 144.00 37316.41344
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 41


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 7+170
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 70754.71784


Cost of One Culvert (A+B+C+D) 1 No. 654844.52

Lion Engineering Consultants 42


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 7+525
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 1 9.00 9.00 135.00 1215
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1215.00

Lion Engineering Consultants 43


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 7+525
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 19.85 3.88 0.79 60.84
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 99.60 52.00 5179.18231999985
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 14972.5575199999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -2 3.14 0.518 0.817 (2.66)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 26.811 5396.00 144669.484623494
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 2 0.00 - 5668.00 0


b) 1200mm dia meter 2 22.50 45.00 7713.00 347085
Total for Sub-structure (C) 491754.484623494
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 20.20 2.09 280.33


Deduction of Pipe Portion -1 20.20 3.88 0.57 (44.67)
Total 235.65 144.00 33934.0608
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 44


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 7+525
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 67372.3652


Cost of One Culvert (A+B+C+D) 1 No. 575314.41

Lion Engineering Consultants 45


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 8+022
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 1 8.40 8.40 135.00 1134
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1134.00

Lion Engineering Consultants 46


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 8+022
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 22.35 1.84 0.79 32.49
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 71.24 52.00 3704.65679999991
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 13498.0319999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 25.00 25.00 7713.00 192825
Total for Sub-structure (C) 344674.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 22.70 2.09 315.02


Deduction of Pipe Portion -1 22.70 1.84 0.57 (23.81)
Total 291.21 144.00 41934.78144
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 47


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 8+022
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 75373.08584


Cost of One Culvert (A+B+C+D) 1 No. 434679.34

Lion Engineering Consultants 48


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 9+123
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 1 9.00 9.00 183.00 1647
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1647.00

Lion Engineering Consultants 49


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 9+123
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 22.35 1.84 0.79 32.49
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 71.24 52.00 3704.65679999991
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 13498.0319999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 25.00 25.00 7713.00 192825
Total for Sub-structure (C) 344674.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 22.70 2.09 315.02


Deduction of Pipe Portion -1 22.70 1.84 0.57 (23.81)
Total 291.21 144.00 41934.78144
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 50


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 9+123
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 75373.08584


Cost of One Culvert (A+B+C+D) 1 No. 435192.34

Lion Engineering Consultants 51


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 10+010
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 1x
9.00 9.00 135.00 1215
0.75
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1215.00

Lion Engineering Consultants 52


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 10+010
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 17.35 1.84 0.79 25.22
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 63.98 52.00 3326.72079999992
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 13120.0959999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 20.00 20.00 7713.00 154260
Total for Sub-structure (C) 306109.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 17.70 2.09 245.63


Deduction of Pipe Portion -1 17.70 1.84 0.57 (18.56)
Total 227.07 144.00 32698.04544
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 53


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 10+010
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 66136.34984


Cost of One Culvert (A+B+C+D) 1 No. 386580.67

Lion Engineering Consultants 54


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 10+335
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 55


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 10+335
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 56.71 52.00 2948.78479999994
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 12742.1599999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 56


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 10+335
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 337186.00

Lion Engineering Consultants 57


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 10+540
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 1 10.50 10.50 183.00 1921.5
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1921.50

Lion Engineering Consultants 58


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 10+540
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 19.85 1.84 0.79 28.85
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 67.61 52.00 3515.68879999991
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 13309.0639999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 22.50 22.50 7713.00 173542.5
Total for Sub-structure (C) 325391.727031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 20.20 2.09 280.33


Deduction of Pipe Portion -1 20.20 1.84 0.57 (21.19)
Total 259.14 144.00 37316.41344
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 59


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 10+540
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 70754.71784


Cost of One Culvert (A+B+C+D) 1 No. 411377.01

Lion Engineering Consultants 60


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 10+749
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 1 9.10 9.10 183.00 1665.3
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1665.30

Lion Engineering Consultants 61


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 10+749
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 24.85 1.84 0.79 36.12
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 74.88 52.00 3893.6247999999
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 13686.9999999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 25.60 1.840 1.800 84.79
Deduction of Pipe -1 25.30 3.142 0.360 (28.61)
Total 84.315 5396.00 454961.832935265
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 27.50 27.50 7713.00 212107.5
Total for Sub-structure (C) 667069.332935265
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 25.20 2.09 349.72


Deduction of Pipe Portion -1 25.20 1.84 0.57 (26.43)
Total 323.29 144.00 46553.14944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 62


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 10+749
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 79991.45384


Cost of One Culvert (A+B+C+D) 1 No. 762413.09

Lion Engineering Consultants 63


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 10+927
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 64


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 10+927
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 14.85 1.84 0.79 21.59
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 60.34 52.00 3137.75279999993
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 12931.1279999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 17.50 17.50 7713.00 134977.5
Total for Sub-structure (C) 286826.727031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 15.20 2.09 210.94


Deduction of Pipe Portion -1 15.20 1.84 0.57 (15.94)
Total 195.00 144.00 28079.67744
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 65


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 10+927
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 61517.98184


Cost of One Culvert (A+B+C+D) 1 No. 361275.84

Lion Engineering Consultants 66


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 15+780
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 67


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 15+780
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 56.71 52.00 2948.78479999994
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 12742.1599999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 68


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 15+780
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 337186.00

Lion Engineering Consultants 69


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 16+150
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 70


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 16+150
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 17.35 1.84 0.79 25.22
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 63.98 52.00 3326.72079999992
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 13120.0959999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 18.10 1.840 1.800 59.95
Deduction of Pipe -1 17.80 3.142 0.360 (20.13)
Total 67.957 5396.00 366695.684623945
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 20.00 20.00 7713.00 154260
Total for Sub-structure (C) 520955.684623945
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 17.70 2.09 245.63


Deduction of Pipe Portion -1 17.70 1.84 0.57 (18.56)
Total 227.07 144.00 32698.04544
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 71


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 16+150
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 66136.34984


Cost of One Culvert (A+B+C+D) 1 No. 600212.13

Lion Engineering Consultants 72


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 16+960
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 1 10.10 10.10 312.00 3151

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 3151.00

Lion Engineering Consultants 73


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 16+960
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 14.85 1.84 0.79 21.59
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 60.34 52.00 3137.75279999993
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 12931.1279999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 15.60 1.840 1.800 51.67
Deduction of Pipe -1 15.30 3.142 0.360 (17.30)
Total 62.504 5396.00 337273.635186839
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 17.50 17.50 7713.00 134977.5
Total for Sub-structure (C) 472251.135186839
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 15.20 2.09 210.94


Deduction of Pipe Portion -1 15.20 1.84 0.57 (15.94)
Total 195.00 144.00 28079.67744
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 74


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 16+960
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 61517.98184


Cost of One Culvert (A+B+C+D) 1 No. 549851.25

Lion Engineering Consultants 75


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 19+620
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 76


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 19+620
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 56.71 52.00 2948.78479999994
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 12742.1599999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 77


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 19+620
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 337186.00

Lion Engineering Consultants 78


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 20+305
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 79


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 20+305
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 14.85 1.84 0.79 21.59
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 60.34 52.00 3137.75279999993
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 12931.1279999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 17.50 17.50 7713.00 134977.5
Total for Sub-structure (C) 286826.727031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 15.20 2.09 210.94


Deduction of Pipe Portion -1 15.20 1.84 0.57 (15.94)
Total 195.00 144.00 28079.67744
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 80


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 20+305
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 61517.98184


Cost of One Culvert (A+B+C+D) 1 No. 361275.84

Lion Engineering Consultants 81


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 20+475
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 82


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 20+475
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 14.95 1.84 0.79 21.73
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 60.49 52.00 3145.31151999993
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 12938.6867199999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 17.60 17.60 7713.00 135748.8
Total for Sub-structure (C) 287598.027031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 15.30 2.09 212.33


Deduction of Pipe Portion -1 15.30 1.84 0.57 (16.05)
Total 196.28 144.00 28264.41216
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 83


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 20+475
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 61702.71656


Cost of One Culvert (A+B+C+D) 1 No. 362239.43

Lion Engineering Consultants 84


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 21+550
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 85


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 21+550
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 56.71 52.00 2948.78479999994
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 12742.1599999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 13.10 1.840 1.800 43.39
Deduction of Pipe -1 12.80 3.142 0.360 (14.48)
Total 57.052 5396.00 307851.585749732
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 423546.585749732
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 86


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 21+550
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 493188.36

Lion Engineering Consultants 87


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 22+610
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 1 7.50 7.50 312.00 2340

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 2340.00

Lion Engineering Consultants 88


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 22+610
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 14.85 1.84 0.79 21.59
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 60.34 52.00 3137.75279999993
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 12931.1279999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 3.623 39.69
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 38.363 5396.00 207006.858439747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 17.50 17.50 7713.00 134977.5
Total for Sub-structure (C) 341984.358439747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 15.20 2.09 210.94


Deduction of Pipe Portion -1 15.20 1.84 0.57 (15.94)
Total 195.00 144.00 28079.67744
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 3.62 48.11 48.00 2309.44512
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 89


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 22+610
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 62112.71336


Cost of One Culvert (A+B+C+D) 1 No. 419368.20

Lion Engineering Consultants 90


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 22+920
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 1 7.50 7.50 312.00 2340

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 2340.00

Lion Engineering Consultants 91


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 22+920
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 56.71 52.00 2948.78479999994
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 12742.1599999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 3.618 39.64
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 38.308 5396.00 206711.265559747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 322406.265559747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 3.62 48.05 48.00 2306.25792
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 92


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 22+920
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 57491.15816


Cost of One Culvert (A+B+C+D) 1 No. 394979.58

Lion Engineering Consultants 93


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 23+050
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 94


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 23+050
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 56.71 52.00 2948.78479999994
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 12742.1599999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 95


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 23+050
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 337186.00

Lion Engineering Consultants 96


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 23+355
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 1 7.50 7.50 183.00 1372.5
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1372.50

Lion Engineering Consultants 97


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 23+355
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 1.40 1.22 23.37
Pipe Portion 1 17.35 1.84 0.79 25.22
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 63.98 52.00 3326.72079999992
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 1.40 0.15 2.87 3409.00 9793.3752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 13120.0959999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 20.00 20.00 7713.00 154260
Total for Sub-structure (C) 306109.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 17.70 2.09 245.63


Deduction of Pipe Portion -1 17.70 1.84 0.57 (18.56)
Total 227.07 144.00 32698.04544
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 98


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 23+355
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 66136.34984


Cost of One Culvert (A+B+C+D) 1 No. 386738.17

Lion Engineering Consultants 99


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 23+440
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 1 9.50 9.50 135.00 1282.5
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1282.50

Lion Engineering Consultants 100


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 23+440
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 2.40 1.22 40.06
Pipe Portion 1 19.85 1.84 0.79 28.85
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 84.30 52.00 4383.54799999989
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 2.40 0.15 4.92 3409.00 16788.6432
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 21172.1911999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 22.50 22.50 7713.00 173542.5
Total for Sub-structure (C) 325391.727031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 20.20 2.09 280.33


Deduction of Pipe Portion -1 20.20 1.84 0.57 (21.19)
Total 259.14 144.00 37316.41344
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 101


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 23+440
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 70754.71784


Cost of One Culvert (A+B+C+D) 1 No. 418601.14

Lion Engineering Consultants 102


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 23+905
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 103


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 23+905
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 9.08 3.40 1.22 75.33
Pipe Portion 1 14.85 3.88 0.79 45.52
For stone pitching for Apron on the u/s side 1 1.50 9.08 0.50 6.81
For stone pitching for Apron on the d/s side 1 3.00 9.08 0.50 13.62
Total 141.28 52.00 7346.34679999982
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 9.08 3.40 0.15 9.26 3409.00 31572.7944
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 38919.1411999998


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 8.88 0.825 2.690 39.41
Deduction of Pipe -2 3.14 0.518 0.817 (2.66)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 36.753 5396.00 198317.811663494
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 2 0.00 - 5668.00 0


b) 1200mm dia meter 2 17.50 35.00 7713.00 269955
Total for Sub-structure (C) 468272.811663494
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 8.88 15.20 2.09 282.10


Deduction of Pipe Portion -1 15.20 3.88 0.57 (33.62)
Total 248.48 144.00 35781.62688
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 8.88 2.69 47.77 48.00 2293.1712
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 104


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 23+905
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 8.88 0.3 4.00
For Apron on the d/s side 1 3.00 8.88 0.3 7.99
For slopes 4 1.54 2.70 0.3 4.99
Total 16.98 2033.00 34515.4608
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 75946.18088


Cost of One Culvert (A+B+C+D) 1 No. 583138.13

Lion Engineering Consultants 105


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 24+140
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 2 9.00 18.00 135.00 2430
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 2430.00

Lion Engineering Consultants 106


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 24+140
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 9.08 4.40 1.22 97.48
Pipe Portion 1 17.35 3.88 0.79 53.18
For stone pitching for Apron on the u/s side 1 1.50 9.08 0.50 6.81
For stone pitching for Apron on the d/s side 1 3.00 9.08 0.50 13.62
Total 171.09 52.00 8896.89319999978
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 9.08 4.40 0.15 11.99 3409.00 40858.9104
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 49755.8035999998


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 8.88 0.825 2.690 39.41
Deduction of Pipe -2 3.14 0.518 0.817 (2.66)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 36.753 5396.00 198317.811663494
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 2 0.00 - 5668.00 0


b) 1200mm dia meter 2 20.00 40.00 7713.00 308520
Total for Sub-structure (C) 506837.811663494
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 8.88 17.70 2.09 328.50


Deduction of Pipe Portion -1 17.70 3.88 0.57 (39.15)
Total 289.35 144.00 41666.76288
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 8.88 2.69 47.77 48.00 2293.1712
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 107


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 24+140
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 8.88 0.3 4.00
For Apron on the d/s side 1 3.00 8.88 0.3 7.99
For slopes 4 1.54 2.70 0.3 4.99
Total 16.98 2033.00 34515.4608
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 81831.31688


Cost of One Culvert (A+B+C+D) 1 No. 640854.93

Lion Engineering Consultants 108


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 24+465
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 109


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 24+465
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 4.40 1.22 73.43
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 106.78 52.00 5552.36239999987
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 4.40 0.15 9.03 3409.00 30779.1792
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 36331.5415999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 110


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 24+465
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 360775.38

Lion Engineering Consultants 111


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 25+465
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 112


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 25+465
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 4.40 1.22 73.43
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 106.78 52.00 5552.36239999987
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 4.40 0.15 9.03 3409.00 30779.1792
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 36331.5415999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 113


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 25+465
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 360775.38

Lion Engineering Consultants 114


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 27+145
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 1 9.00 9.00 312.00 2808

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 2808.00

Lion Engineering Consultants 115


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 27+145
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 4.40 1.22 73.43
Pipe Portion 1 22.35 1.84 0.79 32.49
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 121.31 52.00 6308.23439999984
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 4.40 0.15 9.03 3409.00 30779.1792
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 37087.4135999998


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 25.00 25.00 7713.00 192825
Total for Sub-structure (C) 344674.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 22.70 2.09 315.02


Deduction of Pipe Portion -1 22.70 1.84 0.57 (23.81)
Total 291.21 144.00 41934.78144
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 116


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 27+145
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 75373.08584


Cost of One Culvert (A+B+C+D) 1 No. 459942.73

Lion Engineering Consultants 117


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 27+230
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 1 9.00 9.00 312.00 2808

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 2808.00

Lion Engineering Consultants 118


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 27+230
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 4.40 1.22 73.43
Pipe Portion 1 17.35 1.84 0.79 25.22
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 114.04 52.00 5930.29839999986
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 4.40 0.15 9.03 3409.00 30779.1792
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 36709.4775999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 20.00 20.00 7713.00 154260
Total for Sub-structure (C) 306109.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 17.70 2.09 245.63


Deduction of Pipe Portion -1 17.70 1.84 0.57 (18.56)
Total 227.07 144.00 32698.04544
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 119


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 27+230
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 66136.34984


Cost of One Culvert (A+B+C+D) 1 No. 411763.05

Lion Engineering Consultants 120


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 27+625
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 121


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 27+625
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 4.40 1.22 73.43
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 106.78 52.00 5552.36239999987
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 4.40 0.15 9.03 3409.00 30779.1792
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 36331.5415999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 122


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 27+625
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 360775.38

Lion Engineering Consultants 123


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 28+740
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 1 9.00 9.00 183.00 1647
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1647.00

Lion Engineering Consultants 124


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 28+740
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 4.40 1.22 73.43
Pipe Portion 1 14.85 1.84 0.79 21.59
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 110.41 52.00 5741.33039999987
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 4.40 0.15 9.03 3409.00 30779.1792
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 36520.5095999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 15.60 1.840 1.800 51.67
Deduction of Pipe -1 15.30 3.142 0.360 (17.30)
Total 62.504 5396.00 337273.635186839
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 17.50 17.50 7713.00 134977.5
Total for Sub-structure (C) 472251.135186839
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 15.20 2.09 210.94


Deduction of Pipe Portion -1 15.20 1.84 0.57 (15.94)
Total 195.00 144.00 28079.67744
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 125


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 28+740
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 61517.98184


Cost of One Culvert (A+B+C+D) 1 No. 571936.63

Lion Engineering Consultants 126


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 28+855
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 1 9.00 9.00 183.00 1647
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1647.00

Lion Engineering Consultants 127


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 28+855
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 4.40 1.22 73.43
Pipe Portion 1 17.35 1.84 0.79 25.22
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 114.04 52.00 5930.29839999986
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 4.40 0.15 9.03 3409.00 30779.1792
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 36709.4775999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 20.00 20.00 7713.00 154260
Total for Sub-structure (C) 306109.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 17.70 2.09 245.63


Deduction of Pipe Portion -1 17.70 1.84 0.57 (18.56)
Total 227.07 144.00 32698.04544
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 128


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 28+855
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 66136.34984


Cost of One Culvert (A+B+C+D) 1 No. 410602.05

Lion Engineering Consultants 129


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 30+835
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 130


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 30+835
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 4.40 1.22 73.43
Pipe Portion 1 14.85 1.84 0.79 21.59
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 110.41 52.00 5741.33039999987
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 4.40 0.15 9.03 3409.00 30779.1792
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 36520.5095999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 17.50 17.50 7713.00 134977.5
Total for Sub-structure (C) 286826.727031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 15.20 2.09 210.94


Deduction of Pipe Portion -1 15.20 1.84 0.57 (15.94)
Total 195.00 144.00 28079.67744
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 131


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 30+835
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 61517.98184


Cost of One Culvert (A+B+C+D) 1 No. 384865.22

Lion Engineering Consultants 132


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 31+085
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 1 7.00 7.00 183.00 1281
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1281.00

Lion Engineering Consultants 133


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 31+085
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 4.40 1.22 73.43
Pipe Portion 1 14.85 1.84 0.79 21.59
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 110.41 52.00 5741.33039999987
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 4.40 0.15 9.03 3409.00 30779.1792
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 36520.5095999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 17.50 17.50 7713.00 134977.5
Total for Sub-structure (C) 286826.727031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 15.20 2.09 210.94


Deduction of Pipe Portion -1 15.20 1.84 0.57 (15.94)
Total 195.00 144.00 28079.67744
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 134


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 31+085
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 61517.98184


Cost of One Culvert (A+B+C+D) 1 No. 386146.22

Lion Engineering Consultants 135


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 31+320
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 1 9.10 9.10 183.00 1665.3
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1665.30

Lion Engineering Consultants 136


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 31+320
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 4.40 1.22 73.43
Pipe Portion 1 19.85 1.84 0.79 28.85
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 117.68 52.00 6119.26639999985
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 4.40 0.15 9.03 3409.00 30779.1792
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 36898.4455999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 20.60 1.840 1.800 68.23
Deduction of Pipe -1 20.30 3.142 0.360 (22.96)
Total 73.410 5396.00 396117.734061052
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 22.50 22.50 7713.00 173542.5
Total for Sub-structure (C) 569660.234061052
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 20.20 2.09 280.33


Deduction of Pipe Portion -1 20.20 1.84 0.57 (21.19)
Total 259.14 144.00 37316.41344
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 137


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 31+320
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 70754.71784


Cost of One Culvert (A+B+C+D) 1 No. 678978.70

Lion Engineering Consultants 138


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 31+790
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 1 9.00 9.00 183.00 1647
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1647.00

Lion Engineering Consultants 139


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 31+790
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 4.40 1.22 73.43
Pipe Portion 1 19.85 1.84 0.79 28.85
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 117.68 52.00 6119.26639999985
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 4.40 0.15 9.03 3409.00 30779.1792
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 36898.4455999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 22.50 22.50 7713.00 173542.5
Total for Sub-structure (C) 325391.727031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 20.20 2.09 280.33


Deduction of Pipe Portion -1 20.20 1.84 0.57 (21.19)
Total 259.14 144.00 37316.41344
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 140


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 31+790
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 70754.71784


Cost of One Culvert (A+B+C+D) 1 No. 434691.89

Lion Engineering Consultants 141


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 32+022
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 1 9.00 9.00 135.00 1215
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1215.00

Lion Engineering Consultants 142


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 32+022
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 4.40 1.22 73.43
Pipe Portion 1 19.85 1.84 0.79 28.85
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 117.68 52.00 6119.26639999985
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 4.40 0.15 9.03 3409.00 30779.1792
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 36898.4455999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 22.50 22.50 7713.00 173542.5
Total for Sub-structure (C) 325391.727031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 20.20 2.09 280.33


Deduction of Pipe Portion -1 20.20 1.84 0.57 (21.19)
Total 259.14 144.00 37316.41344
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 143


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 32+022
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 70754.71784


Cost of One Culvert (A+B+C+D) 1 No. 434259.89

Lion Engineering Consultants 144


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 32+365
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 1 12.00 12.00 135.00 1620
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1620.00

Lion Engineering Consultants 145


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 32+365
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 4.40 1.22 73.43
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 106.78 52.00 5552.36239999987
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 4.40 0.15 9.03 3409.00 30779.1792
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 36331.5415999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 13.10 1.840 1.800 43.39
Deduction of Pipe -1 12.80 3.142 0.360 (14.48)
Total 57.052 5396.00 307851.585749732
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 423546.585749732
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 146


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 32+365
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 518397.74

Lion Engineering Consultants 147


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 32+820
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 148


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 32+820
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 4.40 1.22 73.43
Pipe Portion 1 19.85 1.84 0.79 28.85
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 117.68 52.00 6119.26639999985
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 4.40 0.15 9.03 3409.00 30779.1792
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 36898.4455999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 20.60 1.840 1.800 68.23
Deduction of Pipe -1 20.30 3.142 0.360 (22.96)
Total 73.410 5396.00 396117.734061052
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 22.50 22.50 7713.00 173542.5
Total for Sub-structure (C) 569660.234061052
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 20.20 2.09 280.33


Deduction of Pipe Portion -1 20.20 1.84 0.57 (21.19)
Total 259.14 144.00 37316.41344
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 149


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 32+820
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 70754.71784


Cost of One Culvert (A+B+C+D) 1 No. 677313.40

Lion Engineering Consultants 150


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 33+630
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 151


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 33+630
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 4.40 1.22 73.43
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 106.78 52.00 5552.36239999987
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 4.40 0.15 9.03 3409.00 30779.1792
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 36331.5415999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 13.10 1.840 1.800 43.39
Deduction of Pipe -1 12.80 3.142 0.360 (14.48)
Total 57.052 5396.00 307851.585749732
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 423546.585749732
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 152


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 33+630
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 516777.74

Lion Engineering Consultants 153


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 34+060
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 154


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 34+060
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 9.08 4.40 1.22 97.48
Pipe Portion 1 17.35 3.88 0.79 53.18
For stone pitching for Apron on the u/s side 1 1.50 9.08 0.50 6.81
For stone pitching for Apron on the d/s side 1 3.00 9.08 0.50 13.62
Total 171.09 52.00 8896.89319999978
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 9.08 4.40 0.15 11.99 3409.00 40858.9104
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 49755.8035999998


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 8.88 0.825 2.690 39.41
Deduction of Pipe -2 3.14 0.518 0.817 (2.66)
Encasing of Pipe 1 18.10 3.880 1.800 126.41
Deduction of Pipe -2 17.80 3.142 0.360 (40.26)
Total 122.900 5396.00 663171.062847891
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 2 0.00 - 5668.00 0


b) 1200mm dia meter 2 20.00 40.00 7713.00 308520
Total for Sub-structure (C) 971691.062847891
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 8.88 17.70 2.09 328.50


Deduction of Pipe Portion -1 17.70 3.88 0.57 (39.15)
Total 289.35 144.00 41666.76288
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 8.88 2.69 47.77 48.00 2293.1712
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 155


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 34+060
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 8.88 0.3 4.00
For Apron on the d/s side 1 3.00 8.88 0.3 7.99
For slopes 4 1.54 2.70 0.3 4.99
Total 16.98 2033.00 34515.4608
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 81831.31688


Cost of One Culvert (A+B+C+D) 1 No. 1103278.18

Lion Engineering Consultants 156


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 35+960
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 157


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 35+960
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 5.40 1.22 90.12
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 123.47 52.00 6420.22159999985
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 5.40 0.15 11.08 3409.00 37774.4472
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 44194.6687999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 158


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 35+960
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 368638.51

Lion Engineering Consultants 159


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 36+685
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 160


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 36+685
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 6.40 1.22 106.81
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 140.16 52.00 7288.08079999983
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 6.40 0.15 13.13 3409.00 44769.7152
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 52057.7959999998


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 161


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 36+685
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 376501.64

Lion Engineering Consultants 162


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 36+800
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 163


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 36+800
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 7.40 1.22 123.50
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 156.84 52.00 8155.93999999981
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 7.40 0.15 15.18 3409.00 51764.9832
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 59920.9231999998


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 164


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 36+800
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 384364.76

Lion Engineering Consultants 165


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 37+130
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 166


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 37+130
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 8.40 1.22 140.19
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 173.53 52.00 9023.79919999979
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 8.40 0.15 17.24 3409.00 58760.2512
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 67784.0503999998


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 167


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 37+130
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 392227.89

Lion Engineering Consultants 168


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 37+300
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 169


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 37+300
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 9.40 1.22 156.88
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 190.22 52.00 9891.65839999977
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 9.40 0.15 19.29 3409.00 65755.5192
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 75647.1775999998


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 170


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 37+300
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 400091.02

Lion Engineering Consultants 171


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 37+910
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 172


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 37+910
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 10.40 1.22 173.57
Pipe Portion 1 19.85 1.84 0.79 28.85
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 217.82 52.00 11326.4215999997
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 10.40 0.15 21.34 3409.00 72750.7872
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 84077.2087999997


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 22.50 22.50 7713.00 173542.5
Total for Sub-structure (C) 325391.727031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 20.20 2.09 280.33


Deduction of Pipe Portion -1 20.20 1.84 0.57 (21.19)
Total 259.14 144.00 37316.41344
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 173


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 37+910
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 70754.71784


Cost of One Culvert (A+B+C+D) 1 No. 480223.65

Lion Engineering Consultants 174


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 38+385
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 175


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 38+385
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 11.40 1.22 190.26
Pipe Portion 1 17.35 1.84 0.79 25.22
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 230.87 52.00 12005.3127999997
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 11.40 0.15 23.39 3409.00 79746.0552
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 91751.3679999997


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 20.00 20.00 7713.00 154260
Total for Sub-structure (C) 306109.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 17.70 2.09 245.63


Deduction of Pipe Portion -1 17.70 1.84 0.57 (18.56)
Total 227.07 144.00 32698.04544
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 176


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 38+385
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 66136.34984


Cost of One Culvert (A+B+C+D) 1 No. 463996.94

Lion Engineering Consultants 177


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 39+375
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 178


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 39+375
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 12.40 1.22 206.95
Pipe Portion 1 14.85 1.84 0.79 21.59
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 243.93 52.00 12684.2039999997
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 12.40 0.15 25.44 3409.00 86741.3232
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 99425.5271999997


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 17.50 17.50 7713.00 134977.5
Total for Sub-structure (C) 286826.727031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 15.20 2.09 210.94


Deduction of Pipe Portion -1 15.20 1.84 0.57 (15.94)
Total 195.00 144.00 28079.67744
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 179


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 39+375
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 61517.98184


Cost of One Culvert (A+B+C+D) 1 No. 447770.24

Lion Engineering Consultants 180


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 39+775
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 181


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 39+775
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 13.40 1.22 223.64
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 256.98 52.00 13363.0951999997
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 13.40 0.15 27.50 3409.00 93736.5912
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 107099.6864


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 182


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 39+775
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 431543.53

Lion Engineering Consultants 183


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 40+450
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 184


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 40+450
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 14.40 1.22 240.33
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 273.67 52.00 14230.9543999997
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 14.40 0.15 29.55 3409.00 100731.8592
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 114962.8136


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 185


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 40+450
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 439406.65

Lion Engineering Consultants 186


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 40+622
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 187


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 40+622
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 15.40 1.22 257.02
Pipe Portion 1 14.85 1.84 0.79 21.59
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 294.00 52.00 15287.7815999996
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 15.40 0.15 31.60 3409.00 107727.1272
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 123014.9088


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 17.50 17.50 7713.00 134977.5
Total for Sub-structure (C) 286826.727031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 15.20 2.09 210.94


Deduction of Pipe Portion -1 15.20 1.84 0.57 (15.94)
Total 195.00 144.00 28079.67744
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 188


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 40+622
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 61517.98184


Cost of One Culvert (A+B+C+D) 1 No. 471359.62

Lion Engineering Consultants 189


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 41+555
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 190


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 41+555
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 16.40 1.22 273.71
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 307.05 52.00 15966.6727999996
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 16.40 0.15 33.65 3409.00 114722.3952
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 130689.068


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 191


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 41+555
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 455132.91

Lion Engineering Consultants 192


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 42+165
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 193


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 42+165
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 17.40 1.22 290.40
Pipe Portion 1 14.85 1.84 0.79 21.59
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 327.37 52.00 17023.4999999996
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 17.40 0.15 35.70 3409.00 121717.6632
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 138741.1632


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 17.50 17.50 7713.00 134977.5
Total for Sub-structure (C) 286826.727031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 15.20 2.09 210.94


Deduction of Pipe Portion -1 15.20 1.84 0.57 (15.94)
Total 195.00 144.00 28079.67744
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 194


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 42+165
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 61517.98184


Cost of One Culvert (A+B+C+D) 1 No. 487085.87

Lion Engineering Consultants 195


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 42+400
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 8.00 0.50 2.30 18.40
-
-
18.40 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 1 9.00 9.00 183.00 1647
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1647.00

Lion Engineering Consultants 196


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 42+400
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 18.40 1.22 307.09
Pipe Portion 1 19.85 1.84 0.79 28.85
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 351.33 52.00 18269.2951999996
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 18.40 0.15 37.76 3409.00 128712.9312
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 146982.2264


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 22.50 22.50 7713.00 173542.5
Total for Sub-structure (C) 325391.727031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 20.20 2.09 280.33


Deduction of Pipe Portion -1 20.20 1.84 0.57 (21.19)
Total 259.14 144.00 37316.41344
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 197


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 42+400
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 70754.71784


Cost of One Culvert (A+B+C+D) 1 No. 544775.67

Lion Engineering Consultants 198


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 42+975
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 6.20 0.50 2.00 12.40
-
-
12.40 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 1 9.00 9.00 312.00 2808

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 2808.00

Lion Engineering Consultants 199


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 42+975
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 19.40 1.22 323.78
Pipe Portion 1 14.85 1.84 0.79 21.59
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 360.75 52.00 18759.2183999996
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 19.40 0.15 39.81 3409.00 135708.1992
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 154467.4176


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 17.50 17.50 7713.00 134977.5
Total for Sub-structure (C) 286826.727031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 15.20 2.09 210.94


Deduction of Pipe Portion -1 15.20 1.84 0.57 (15.94)
Total 195.00 144.00 28079.67744
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 200


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 42+975
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 61517.98184


Cost of One Culvert (A+B+C+D) 1 No. 505620.13

Lion Engineering Consultants 201


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 3 Row 1200 Dia


Pipe Culvert @ 43+885
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 3 9..3 #VALUE! 183.00 #VALUE!
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) #VALUE!

Lion Engineering Consultants 202


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 3 Row 1200 Dia


Pipe Culvert @ 43+885
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 10.92 20.40 1.22 543.55
Pipe Portion 1 14.85 5.92 0.79 69.45
For stone pitching for Apron on the u/s side 1 1.50 10.92 0.50 8.19
For stone pitching for Apron on the d/s side 1 3.00 10.92 0.50 16.38
Total 637.57 52.00 33153.8687999992
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 10.92 20.40 0.15 66.83 3409.00 227824.8336
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 260978.702399999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 10.72 0.825 2.690 47.58
Deduction of Pipe -3 3.14 0.518 0.817 (3.99)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 43.589 5396.00 235206.337895241
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
3 9.2 bedding included) in single row including fixing
collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 3 0.00 - 5668.00 0


b) 1200mm dia meter 3 17.50 52.50 7713.00 404932.5
Total for Sub-structure (C) 640138.837895241
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 10.72 15.20 2.09 340.55


Deduction of Pipe Portion -1 15.20 5.92 0.57 (51.29)
Total 289.26 144.00 41653.73952
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 10.72 2.69 57.67 48.00 2768.3328
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 203


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 3 Row 1200 Dia


Pipe Culvert @ 43+885
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 10.72 0.3 4.82
For Apron on the d/s side 1 3.00 10.72 0.3 9.65
For slopes 4 1.54 2.70 0.3 4.99
Total 19.46 2033.00 39565.4328
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 87343.42712


Cost of One Culvert (A+B+C+D) 1 No. #VALUE!

Lion Engineering Consultants 204


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 44+160
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 1 9.50 9.50 183.00 1738.5
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1738.50

Lion Engineering Consultants 205


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 44+160
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 21.40 1.22 357.16
Pipe Portion 1 14.85 1.84 0.79 21.59
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 394.13 52.00 20494.9367999995
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 21.40 0.15 43.91 3409.00 149698.7352
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 170193.671999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 17.50 17.50 7713.00 134977.5
Total for Sub-structure (C) 286826.727031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 15.20 2.09 210.94


Deduction of Pipe Portion -1 15.20 1.84 0.57 (15.94)
Total 195.00 144.00 28079.67744
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 206


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 44+160
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 61517.98184


Cost of One Culvert (A+B+C+D) 1 No. 520276.88

Lion Engineering Consultants 207


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 44+560
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 208


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 44+560
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 22.40 1.22 373.85
Pipe Portion 1 17.35 1.84 0.79 25.22
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 414.46 52.00 21551.7639999995
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 22.40 0.15 45.96 3409.00 156694.0032
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 178245.767199999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 20.00 20.00 7713.00 154260
Total for Sub-structure (C) 306109.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 17.70 2.09 245.63


Deduction of Pipe Portion -1 17.70 1.84 0.57 (18.56)
Total 227.07 144.00 32698.04544
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 209


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 44+560
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 66136.34984


Cost of One Culvert (A+B+C+D) 1 No. 550491.34

Lion Engineering Consultants 210


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 44+705
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 1 9.00 9.00 183.00 1647
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1647.00

Lion Engineering Consultants 211


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 44+705
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 23.40 1.22 390.54
Pipe Portion 1 19.85 1.84 0.79 28.85
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 434.78 52.00 22608.5911999994
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 23.40 0.15 48.02 3409.00 163689.2712
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 186297.862399999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 22.50 22.50 7713.00 173542.5
Total for Sub-structure (C) 325391.727031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 20.20 2.09 280.33


Deduction of Pipe Portion -1 20.20 1.84 0.57 (21.19)
Total 259.14 144.00 37316.41344
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 212


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 44+705
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 70754.71784


Cost of One Culvert (A+B+C+D) 1 No. 584091.31

Lion Engineering Consultants 213


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 45+140
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 1 9.00 9.00 183.00 1647
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1647.00

Lion Engineering Consultants 214


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 45+140
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 24.40 1.22 407.23
Pipe Portion 1 22.35 1.84 0.79 32.49
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 455.10 52.00 23665.4183999994
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 24.40 0.15 50.07 3409.00 170684.5392
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 194349.957599999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 25.00 25.00 7713.00 192825
Total for Sub-structure (C) 344674.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 22.70 2.09 315.02


Deduction of Pipe Portion -1 22.70 1.84 0.57 (23.81)
Total 291.21 144.00 41934.78144
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 215


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 45+140
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 75373.08584


Cost of One Culvert (A+B+C+D) 1 No. 616044.27

Lion Engineering Consultants 216


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 46+370
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 217


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 46+370
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 25.40 1.22 423.92
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 457.26 52.00 23777.4055999994
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 25.40 0.15 52.12 3409.00 177679.8072
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 201457.212799999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 218


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 46+370
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 525901.05

Lion Engineering Consultants 219


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 46+615
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 220


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 46+615
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 26.40 1.22 440.61
Pipe Portion 1 17.35 1.84 0.79 25.22
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 481.22 52.00 25023.2007999994
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 26.40 0.15 54.17 3409.00 184675.0752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 209698.275999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 20.00 20.00 7713.00 154260
Total for Sub-structure (C) 306109.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 17.70 2.09 245.63


Deduction of Pipe Portion -1 17.70 1.84 0.57 (18.56)
Total 227.07 144.00 32698.04544
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 221


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 46+615
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 66136.34984


Cost of One Culvert (A+B+C+D) 1 No. 581943.85

Lion Engineering Consultants 222


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 47+200
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 223


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 47+200
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 27.40 1.22 457.30
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 490.64 52.00 25513.1239999994
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 27.40 0.15 56.22 3409.00 191670.3432
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 217183.467199999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 224


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 47+200
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 541627.31

Lion Engineering Consultants 225


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1000 Dia


Pipe Culvert @ 47+405
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 226


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1000 Dia


Pipe Culvert @ 47+405
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.63 28.40 1.22 459.43
Pipe Portion 1 7.35 1.60 0.79 9.29
For stone pitching for Apron on the u/s side 1 1.50 6.63 0.50 4.97
For stone pitching for Apron on the d/s side 1 3.00 6.63 0.50 9.95
Total 483.64 52.00 25149.2997599994
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.63 28.40 0.15 56.49 3409.00 192566.2284
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 217715.528159999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.43 0.825 2.450 25.99
Deduction of Pipe -1 3.14 0.360 0.817 (0.92)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.250 -
Total 25.069 5396.00 135273.779672046
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 10.00 10.00 5668.00 56680


b) 1200mm dia meter 1 0.00 - 7713.00 0
Total for Sub-structure (C) 191953.779672046
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.43 7.70 1.85 91.60


Deduction of Pipe Portion -1 7.70 1.60 0.57 (7.02)
Total 84.57 144.00 12178.5048
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.43 2.45 31.51 48.00 1512.336
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 227


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1000 Dia


Pipe Culvert @ 47+405
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.43 0.3 2.89
For Apron on the d/s side 1 3.00 6.43 0.3 5.79
For slopes 4 1.54 2.70 0.3 4.99
Total 13.67 2033.00 27791.3133
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 44838.0761


Cost of One Culvert (A+B+C+D) 1 No. 454507.38

Lion Engineering Consultants 228


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 47+510
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 229


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 47+510
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 8.88 29.40 1.22 637.02
Pipe Portion 1 22.35 3.88 0.79 68.51
For stone pitching for Apron on the u/s side 1 1.50 8.88 0.50 6.66
For stone pitching for Apron on the d/s side 1 3.00 8.88 0.50 13.32
Total 725.50 52.00 37726.1507999991
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 8.88 29.40 0.15 78.32 3409.00 266998.3344
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 304724.485199999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 8.68 0.825 2.690 38.53
Deduction of Pipe -2 3.14 0.518 0.817 (2.66)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 35.865 5396.00 193527.782463494
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 2 0.00 - 5668.00 0


b) 1200mm dia meter 2 25.00 50.00 7713.00 385650
Total for Sub-structure (C) 579177.782463494
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 8.68 22.70 2.09 411.81


Deduction of Pipe Portion -1 22.70 3.88 0.57 (50.20)
Total 361.60 144.00 52070.67648
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 8.68 2.69 46.70 48.00 2241.5232
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 230


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 47+510
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 8.68 0.3 3.91
For Apron on the d/s side 1 3.00 8.68 0.3 7.81
For slopes 4 1.54 2.70 0.3 4.99
Total 16.71 2033.00 33966.5508
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 91634.67248


Cost of One Culvert (A+B+C+D) 1 No. 975536.94

Lion Engineering Consultants 231


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 900 Dia


Pipe Culvert @ 48+675
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 232


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 900 Dia


Pipe Culvert @ 48+675
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.63 30.40 1.22 491.79
Pipe Portion 1 8.85 1.60 0.79 11.19
For stone pitching for Apron on the u/s side 1 1.50 6.63 0.50 4.97
For stone pitching for Apron on the d/s side 1 3.00 6.63 0.50 9.95
Total 517.89 52.00 26930.3205599994
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.63 30.40 0.15 60.47 3409.00 206127.2304
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 233057.550959999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.43 0.825 2.450 25.99
Deduction of Pipe -1 3.14 0.360 0.817 (0.92)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.203 -
Total 25.069 5396.00 135273.779672046
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 11.50 11.50 5668.00 65182


b) 1200mm dia meter 1 0.00 - 7713.00 0
Total for Sub-structure (C) 200455.779672046
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.43 9.20 1.85 109.44


Deduction of Pipe Portion -1 9.20 1.60 0.57 (8.39)
Total 101.05 144.00 14550.9408
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.43 2.45 31.51 48.00 1512.336
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 233


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 900 Dia


Pipe Culvert @ 48+675
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.43 0.3 2.89
For Apron on the d/s side 1 3.00 6.43 0.3 5.79
For slopes 4 1.54 2.70 0.3 4.99
Total 13.67 2033.00 27791.3133
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 47210.5121


Cost of One Culvert (A+B+C+D) 1 No. 480723.84

Lion Engineering Consultants 234


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 49+170
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 235


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 49+170
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 31.40 1.22 524.05
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 557.40 52.00 28984.5607999993
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 31.40 0.15 64.43 3409.00 219651.4152
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 248635.975999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 236


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 49+170
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 573079.82

Lion Engineering Consultants 237


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 49+680
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 238


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 49+680
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 32.40 1.22 540.74
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 574.08 52.00 29852.4199999993
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 32.40 0.15 66.48 3409.00 226646.6832
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 256499.103199999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 239


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 49+680
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 580942.94

Lion Engineering Consultants 240


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 49+975
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 241


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 49+975
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 33.40 1.22 557.43
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 590.77 52.00 30720.2791999993
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 33.40 0.15 68.54 3409.00 233641.9512
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 264362.230399999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 242


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 49+975
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 588806.07

Lion Engineering Consultants 243


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 50+040
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 244


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 50+040
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 34.40 1.22 574.12
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 607.46 52.00 31588.1383999992
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 34.40 0.15 70.59 3409.00 240637.2192
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 272225.357599999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 245


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 50+040
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 596669.20

Lion Engineering Consultants 246


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 50+200
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 247


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 50+200
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 35.40 1.22 590.81
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 624.15 52.00 32455.9975999992
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 35.40 0.15 72.64 3409.00 247632.4872
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 280088.484799999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 248


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 50+200
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 604532.33

Lion Engineering Consultants 249


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 50+300
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 250


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 50+300
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 36.40 1.22 607.50
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 640.84 52.00 33323.8567999992
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 36.40 0.15 74.69 3409.00 254627.7552
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 287951.611999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 251


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 50+300
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 612395.45

Lion Engineering Consultants 252


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 50+550
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 253


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 50+550
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 8.88 37.40 1.22 810.35
Pipe Portion 1 12.35 3.88 0.79 37.86
For stone pitching for Apron on the u/s side 1 1.50 8.88 0.50 6.66
For stone pitching for Apron on the d/s side 1 3.00 8.88 0.50 13.32
Total 868.19 52.00 45145.8019999989
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 8.88 37.40 0.15 99.63 3409.00 339650.9424
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 384796.744399999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 8.68 0.825 2.690 38.53
Deduction of Pipe -2 3.14 0.518 0.817 (2.66)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 35.865 5396.00 193527.782463494
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 2 0.00 - 5668.00 0


b) 1200mm dia meter 2 15.00 30.00 7713.00 231390
Total for Sub-structure (C) 424917.782463494
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 8.68 12.70 2.09 230.39


Deduction of Pipe Portion -1 12.70 3.88 0.57 (28.09)
Total 202.31 144.00 29132.05248
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 8.68 2.69 46.70 48.00 2241.5232
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 254


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1200 Dia


Pipe Culvert @ 50+550
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 8.68 0.3 3.91
For Apron on the d/s side 1 3.00 8.68 0.3 7.81
For slopes 4 1.54 2.70 0.3 4.99
Total 16.71 2033.00 33966.5508
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 68696.04848


Cost of One Culvert (A+B+C+D) 1 No. 878410.58

Lion Engineering Consultants 255


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 50+600
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 256


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 50+600
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 38.40 1.22 640.88
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 674.22 52.00 35059.5751999992
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 38.40 0.15 78.80 3409.00 268618.2912
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 303677.866399999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 257


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 50+600
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 628121.71

Lion Engineering Consultants 258


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 50+800
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 259


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 50+800
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 39.40 1.22 657.57
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 690.91 52.00 35927.4343999991
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 39.40 0.15 80.85 3409.00 275613.5592
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 311540.993599999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 260


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 50+800
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 635984.83

Lion Engineering Consultants 261


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 50+950
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 262


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 50+950
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 40.40 1.22 674.26
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 707.60 52.00 36795.2935999991
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 40.40 0.15 82.90 3409.00 282608.8272
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 319404.120799999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 263


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 50+950
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 643847.96

Lion Engineering Consultants 264


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 51+020
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 265


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 51+020
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 41.40 1.22 690.95
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 724.29 52.00 37663.1527999991
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 41.40 0.15 84.95 3409.00 289604.0952
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 327267.247999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 266


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 51+020
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 651711.09

Lion Engineering Consultants 267


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 51+810
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 1 10.10 10.10 312.00 3151

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 3151.00

Lion Engineering Consultants 268


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 51+810
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 42.40 1.22 707.64
Pipe Portion 1 24.85 1.84 0.79 36.12
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 759.15 52.00 39475.851999999
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 42.40 0.15 87.00 3409.00 296599.3632
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 336075.215199999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 27.50 27.50 7713.00 212107.5
Total for Sub-structure (C) 363956.727031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 25.20 2.09 349.72


Deduction of Pipe Portion -1 25.20 1.84 0.57 (26.43)
Total 323.29 144.00 46553.14944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 269


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 51+810
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 79991.45384


Cost of One Culvert (A+B+C+D) 1 No. 783174.40

Lion Engineering Consultants 270


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 52+720
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 271


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 52+720
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 43.40 1.22 724.33
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 757.67 52.00 39398.871199999
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 43.40 0.15 89.06 3409.00 303594.6312
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 342993.502399999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 272


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 52+720
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 667437.34

Lion Engineering Consultants 273


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 52+935
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 274


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 52+935
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 44.40 1.22 741.02
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 774.36 52.00 40266.730399999
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 44.40 0.15 91.11 3409.00 310589.8992
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 350856.629599999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 275


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 52+935
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 675300.47

Lion Engineering Consultants 276


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 53+000
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 277


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 53+000
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 45.40 1.22 757.71
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 791.05 52.00 41134.589599999
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 45.40 0.15 93.16 3409.00 317585.1672
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 358719.756799999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 278


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 53+000
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 683163.60

Lion Engineering Consultants 279


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 53+135
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 280


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 53+135
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 46.40 1.22 774.40
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 807.74 52.00 42002.448799999
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 46.40 0.15 95.21 3409.00 324580.4352
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 366582.883999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 281


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 53+135
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 691026.72

Lion Engineering Consultants 282


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1000 Dia


Pipe Culvert @ 53+220
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 283


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1000 Dia


Pipe Culvert @ 53+220
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.63 47.40 1.22 766.80
Pipe Portion 1 12.35 1.60 0.79 15.61
For stone pitching for Apron on the u/s side 1 1.50 6.63 0.50 4.97
For stone pitching for Apron on the d/s side 1 3.00 6.63 0.50 9.95
Total 797.33 52.00 41461.013359999
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.63 47.40 0.15 94.28 3409.00 321395.7474
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 362856.760759999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.43 0.825 2.450 25.99
Deduction of Pipe -1 3.14 0.360 0.817 (0.92)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.250 -
Total 25.069 5396.00 135273.779672046
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 15.00 15.00 5668.00 85020


b) 1200mm dia meter 1 0.00 - 7713.00 0
Total for Sub-structure (C) 220293.779672046
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.43 12.70 1.85 151.07


Deduction of Pipe Portion -1 12.70 1.60 0.57 (11.58)
Total 139.49 144.00 20086.6248
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.43 2.45 31.51 48.00 1512.336
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 284


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1000 Dia


Pipe Culvert @ 53+220
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.43 0.3 2.89
For Apron on the d/s side 1 3.00 6.43 0.3 5.79
For slopes 4 1.54 2.70 0.3 4.99
Total 13.67 2033.00 27791.3133
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 52746.1961


Cost of One Culvert (A+B+C+D) 1 No. 635896.74

Lion Engineering Consultants 285


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1000 Dia


Pipe Culvert @ 53+675
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 286


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1000 Dia


Pipe Culvert @ 53+675
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.63 48.40 1.22 782.98
Pipe Portion 1 7.35 1.60 0.79 9.29
For stone pitching for Apron on the u/s side 1 1.50 6.63 0.50 4.97
For stone pitching for Apron on the d/s side 1 3.00 6.63 0.50 9.95
Total 807.18 52.00 41973.587759999
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.63 48.40 0.15 96.27 3409.00 328176.2484
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 370149.836159999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.43 0.825 2.450 25.99
Deduction of Pipe -1 3.14 0.360 0.817 (0.92)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.250 -
Total 25.069 5396.00 135273.779672046
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 10.00 10.00 5668.00 56680


b) 1200mm dia meter 1 0.00 - 7713.00 0
Total for Sub-structure (C) 191953.779672046
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.43 7.70 1.85 91.60


Deduction of Pipe Portion -1 7.70 1.60 0.57 (7.02)
Total 84.57 144.00 12178.5048
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.43 2.45 31.51 48.00 1512.336
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 287


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1000 Dia


Pipe Culvert @ 53+675
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.43 0.3 2.89
For Apron on the d/s side 1 3.00 6.43 0.3 5.79
For slopes 4 1.54 2.70 0.3 4.99
Total 13.67 2033.00 27791.3133
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 44838.0761


Cost of One Culvert (A+B+C+D) 1 No. 606941.69

Lion Engineering Consultants 288


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 53+785
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 1X 7.5
- 135.00 0
0.90 9.0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 289


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 53+785
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 49.40 1.22 824.47
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 857.81 52.00 44606.0263999989
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 49.40 0.15 101.37 3409.00 345566.2392
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 390172.265599999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 290


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 53+785
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 714616.11

Lion Engineering Consultants 291


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 54+295
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 1X
10.00 10.00 135.00 1350
1.00
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1350.00

Lion Engineering Consultants 292


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 54+295
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 50.40 1.22 841.16
Pipe Portion 1 14.85 1.84 0.79 21.59
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 878.13 52.00 45662.8535999989
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 50.40 0.15 103.42 3409.00 352561.5072
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 398224.360799999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 17.50 17.50 7713.00 134977.5
Total for Sub-structure (C) 286826.727031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 15.20 2.09 210.94


Deduction of Pipe Portion -1 15.20 1.84 0.57 (15.94)
Total 195.00 144.00 28079.67744
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 293


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 54+295
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 61517.98184


Cost of One Culvert (A+B+C+D) 1 No. 747919.07

Lion Engineering Consultants 294


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 55+080
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 1X
10.00 10.00 135.00 1350
1.00
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1350.00

Lion Engineering Consultants 295


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 55+080
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 51.40 1.22 857.85
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 891.19 52.00 46341.7447999989
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 51.40 0.15 105.47 3409.00 359556.7752
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 405898.519999999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 296


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 55+080
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 731692.36

Lion Engineering Consultants 297


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 55+503
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 1X
10.30 10.30 135.00 1390.5
0.90
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1390.50

Lion Engineering Consultants 298


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 55+503
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 52.40 1.22 874.54
Pipe Portion 1 14.85 1.84 0.79 21.59
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 911.51 52.00 47398.5719999989
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 52.40 0.15 107.52 3409.00 366552.0432
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 413950.615199999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 17.50 17.50 7713.00 134977.5
Total for Sub-structure (C) 286826.727031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 15.20 2.09 210.94


Deduction of Pipe Portion -1 15.20 1.84 0.57 (15.94)
Total 195.00 144.00 28079.67744
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 299


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 55+503
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 61517.98184


Cost of One Culvert (A+B+C+D) 1 No. 763685.82

Lion Engineering Consultants 300


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1000 Dia


Pipe Culvert @ 55+710
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 301


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1000 Dia


Pipe Culvert @ 55+710
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 8.36 53.40 1.22 1,089.27
Pipe Portion 1 12.25 3.40 0.79 32.90
For stone pitching for Apron on the u/s side 1 1.50 8.36 0.50 6.27
For stone pitching for Apron on the d/s side 1 3.00 8.36 0.50 12.54
Total 1,140.99 52.00 59331.3791199985
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 8.36 53.40 0.15 133.93 3409.00 456557.8248
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 515889.203919999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 8.16 0.825 2.450 32.99
Deduction of Pipe -2 3.14 0.360 0.817 (1.85)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.250 -
Total 31.139 5396.00 168024.908344093
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 2 14.90 29.80 5668.00 168906.4


b) 1200mm dia meter 2 0.00 - 7713.00 0
Total for Sub-structure (C) 336931.308344093
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 8.16 12.60 1.85 190.21


Deduction of Pipe Portion -1 12.60 3.40 0.57 (24.42)
Total 165.79 144.00 23873.8752
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 8.16 2.45 39.98 48.00 1919.232
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 302


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 2 Row 1000 Dia


Pipe Culvert @ 55+710
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 8.16 0.3 3.67
For Apron on the d/s side 1 3.00 8.16 0.3 7.34
For slopes 4 1.54 2.70 0.3 4.99
Total 16.01 2033.00 32539.3848
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 61688.414


Cost of One Culvert (A+B+C+D) 1 No. 914508.93

Lion Engineering Consultants 303


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 56+050
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 1X
10.20 10.20 135.00 1377
1.00
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1377.00

Lion Engineering Consultants 304


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 56+050
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 54.40 1.22 907.91
Pipe Portion 1 12.35 1.84 0.79 17.95
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 941.26 52.00 48945.3223999988
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 54.40 0.15 111.63 3409.00 380542.5792
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 429487.901599999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 15.00 15.00 7713.00 115695
Total for Sub-structure (C) 267544.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 12.70 2.09 176.25


Deduction of Pipe Portion -1 12.70 1.84 0.57 (13.32)
Total 162.93 144.00 23461.30944
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 305


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 56+050
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56899.61384


Cost of One Culvert (A+B+C+D) 1 No. 755308.74

Lion Engineering Consultants 306


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1000 Dia


Pipe Culvert @ 56+268
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 307


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1000 Dia


Pipe Culvert @ 56+268
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.63 55.40 1.22 896.22
Pipe Portion 1 7.15 1.60 0.79 9.04
For stone pitching for Apron on the u/s side 1 1.50 6.63 0.50 4.97
For stone pitching for Apron on the d/s side 1 3.00 6.63 0.50 9.95
Total 920.17 52.00 47848.9429599989
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.63 55.40 0.15 110.19 3409.00 375639.7554
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 423488.698359999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.43 0.825 2.450 25.99
Deduction of Pipe -1 3.14 0.360 0.817 (0.92)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.250 -
Total 25.069 5396.00 135273.779672046
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 9.80 9.80 5668.00 55546.4


b) 1200mm dia meter 1 0.00 - 7713.00 0
Total for Sub-structure (C) 190820.179672046
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.43 7.50 1.85 89.22


Deduction of Pipe Portion -1 7.50 1.60 0.57 (6.84)
Total 82.38 144.00 11862.18
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.43 2.45 31.51 48.00 1512.336
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 308


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1000 Dia


Pipe Culvert @ 56+268
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.43 0.3 2.89
For Apron on the d/s side 1 3.00 6.43 0.3 5.79
For slopes 4 1.54 2.70 0.3 4.99
Total 13.67 2033.00 27791.3133
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 44521.7513


Cost of One Culvert (A+B+C+D) 1 No. 658830.63

Lion Engineering Consultants 309


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1000 Dia


Pipe Culvert @ 56+355
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 310


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1000 Dia


Pipe Culvert @ 56+355
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.63 56.40 1.22 912.39
Pipe Portion 1 9.85 1.60 0.79 12.45
For stone pitching for Apron on the u/s side 1 1.50 6.63 0.50 4.97
For stone pitching for Apron on the d/s side 1 3.00 6.63 0.50 9.95
Total 939.76 52.00 48867.6229599988
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.63 56.40 0.15 112.18 3409.00 382420.2564
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 431287.879359999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.43 0.825 2.450 25.99
Deduction of Pipe -1 3.14 0.360 0.817 (0.92)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.250 -
Total 25.069 5396.00 135273.779672046
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 12.50 12.50 5668.00 70850


b) 1200mm dia meter 1 0.00 - 7713.00 0
Total for Sub-structure (C) 206123.779672046
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.43 10.20 1.85 121.33


Deduction of Pipe Portion -1 10.20 1.60 0.57 (9.30)
Total 112.03 144.00 16132.5648
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.43 2.45 31.51 48.00 1512.336
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 311


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1000 Dia


Pipe Culvert @ 56+355
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.43 0.3 2.89
For Apron on the d/s side 1 3.00 6.43 0.3 5.79
For slopes 4 1.54 2.70 0.3 4.99
Total 13.67 2033.00 27791.3133
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 48792.1361


Cost of One Culvert (A+B+C+D) 1 No. 686203.80

Lion Engineering Consultants 312


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 56+522
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 1X
10.10 10.10 135.00 1363.5
1.00
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 1363.50

Lion Engineering Consultants 313


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 56+522
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.84 57.40 1.22 957.98
Pipe Portion 1 17.35 1.84 0.79 25.22
For stone pitching for Apron on the u/s side 1 1.50 6.84 0.50 5.13
For stone pitching for Apron on the d/s side 1 3.00 6.84 0.50 10.26
Total 998.59 52.00 51926.8359999987
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.84 57.40 0.15 117.78 3409.00 401528.3832
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 453455.219199999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.64 0.825 2.690 29.47
Deduction of Pipe -1 3.14 0.518 0.817 (1.33)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.360 -
Total 28.141 5396.00 151849.227031747
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 0.00 - 5668.00 0


b) 1200mm dia meter 1 20.00 20.00 7713.00 154260
Total for Sub-structure (C) 306109.227031747
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.64 17.70 2.09 245.63


Deduction of Pipe Portion -1 17.70 1.84 0.57 (18.56)
Total 227.07 144.00 32698.04544
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.64 2.69 35.72 48.00 1714.7136
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 314


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1200 Dia


Pipe Culvert @ 56+522
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.64 0.3 2.99
For Apron on the d/s side 1 3.00 6.64 0.3 5.98
For slopes 4 1.54 2.70 0.3 4.99
Total 13.95 2033.00 28367.6688
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 66136.34984


Cost of One Culvert (A+B+C+D) 1 No. 827064.30

Lion Engineering Consultants 315


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1000 Dia


Pipe Culvert @ 56+610
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 316


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1000 Dia


Pipe Culvert @ 56+610
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.63 58.40 1.22 944.75
Pipe Portion 1 14.65 1.60 0.79 18.52
For stone pitching for Apron on the u/s side 1 1.50 6.63 0.50 4.97
For stone pitching for Apron on the d/s side 1 3.00 6.63 0.50 9.95
Total 978.18 52.00 50865.5461599988
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.63 58.40 0.15 116.16 3409.00 395981.2584
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 446846.804559999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.43 0.825 2.450 25.99
Deduction of Pipe -1 3.14 0.360 0.817 (0.92)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.250 -
Total 25.069 5396.00 135273.779672046
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 17.30 17.30 5668.00 98056.4


b) 1200mm dia meter 1 0.00 - 7713.00 0
Total for Sub-structure (C) 233330.179672046
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.43 15.00 1.85 178.43


Deduction of Pipe Portion -1 15.00 1.60 0.57 (13.68)
Total 164.75 144.00 23724.36
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.43 2.45 31.51 48.00 1512.336
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 317


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1000 Dia


Pipe Culvert @ 56+610
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.43 0.3 2.89
For Apron on the d/s side 1 3.00 6.43 0.3 5.79
For slopes 4 1.54 2.70 0.3 4.99
Total 13.67 2033.00 27791.3133
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56383.9313


Cost of One Culvert (A+B+C+D) 1 No. 736560.92

Lion Engineering Consultants 318


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1000 Dia


Pipe Culvert @ 56+610
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
A DISMANTLING
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal
2.3 of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

Lime Concrete, cement concrete grade M-10 and cum


(a)
below
(b) Cement Concrete Grade M-15 & M-20 cum
Head Wall Dismantling cum 2 0.000 0.000 0.000 0.000
0.000

0.000 342.000 0

Prestressed / Reinforced cement concrete grade M-20 cum


(c) & above
RCC Solid Slab -
- 886.00 0

(d) Brick Masonary In cement mortar cum


(e) Dry rubble stone masonry cum
A Rubble stone masonry in lime mortar cum
Head Wall 2 - - - -
-
-
- 207.00 0
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 0 0.00 - 135.00 0
ii) Diameter beyond 600 mm to 900 mm Meter 0 0.00 - 183.00 0
iii) Diameter over 900 mm Meter 0 0.00 - 312.00 0

Dismantling of Flexible Pavements cum


Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres,
2.4 stacking serviceable and unserviceable materials
separately.

-
- 228.00 0

Dismantling of Cement Concrete Pavement cum


Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of
2.5 dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable materials
separately

CC Pavement of FCW -
- 968.00 0

Total for Dismantling (A) 0.00

Lion Engineering Consultants 319


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1000 Dia


Pipe Culvert @ 56+610
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
B FOUNDATION
Earth work in excavation of foundation of structures
as per drawing and technical specification, for all
depths in all types of soil/rock including setting out,
construction of shoring and bracing, dressing of sides
and bottom, back filling with approved material,
1 12.1
disposal of surplus material etc. within all leads and
lifts complete and as per relevant clauses of Section
300 and 2100 of MORT&H Specifications.

i) In all types of soils Cum


Head Wall 2 6.63 58.40 1.22 944.75
Pipe Portion 1 14.65 1.60 0.79 18.52
For stone pitching for Apron on the u/s side 1 1.50 6.63 0.50 4.97
For stone pitching for Apron on the d/s side 1 3.00 6.63 0.50 9.95
Total 978.18 52.00 50865.5461599988
Plain cement concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically mixed,
2 9.1 placed in foundation and compacted by vibration Cum 2 6.63 58.40 0.15 116.16 3409.00 395981.2584
including curing for 14 days. as per MORT&H
Specification 409.

Total for Foundation (B) 446846.804559999


C SUB-STRUCTURE
Plain/Reinforced cement concrete in sub-structure
3 13.6 complete as per drawing and technical specifications Cum

PCC Grade M:20


Head Wall 2 6.43 0.825 2.450 25.99
Deduction of Pipe -1 3.14 0.360 0.817 (0.92)
Encasing of Pipe 1 - - - -
Deduction of Pipe 0 (0.30) 3.142 0.250 -
Total 25.069 5396.00 135273.779672046
Providing and Laying Reinforced cement concrete
pipe NP4/prestrssed concrete pipe for culverts on
first class bedding of granular material (cost of
bedding included) in single row including fixing
3 9.2 collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets.

a) 1000mm dia meter 1 17.30 17.30 5668.00 98056.4


b) 1200mm dia meter 1 0.00 - 7713.00 0
Total for Sub-structure (C) 233330.179672046
D MISCELLANEOUS
Back filling in between Head wall surrounding pipe

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
4 3.10 required slope and compacting to meet requirement Cum
of table 300-1, 300-2 and as per relevent clauses of
section-300.

In between Head wall surrounding pipe 1 6.43 15.00 1.85 178.43


Deduction of Pipe Portion -1 15.00 1.60 0.57 (13.68)
Total 164.75 144.00 23724.36
Painting two coatsafter filling the surface with
5 8.11 synthetic enamel paint in all shades on new concrete
surfaces
Head Wall Sqm 2 6.43 2.45 31.51 48.00 1512.336
Providing painting, figuring and numbering to
6 10.11 culvert upto 6m span complete with synthetic enamel
paint
(i) Two coats on new work Each
on Head Wall 2 2.00 100.00 200

Lion Engineering Consultants 320


DRAFT FESIBILITY REPORT JOBAT-NANPUR ROAD Cost Estimate of Hume Pipe Culverts

Estimate of HPC 1 Row 1000 Dia


Pipe Culvert @ 56+610
Sr. SOR Item
Item Unit Nos. Length Width Height Quantity Rate Amount
No. No.
Providing and laying Pitching on slopes laid over
prepared filter media, Dry boulder toe wall complete
7 15.4 as per drawing and Technical specifications and as
per relevant clauses of Section 2500.

a) Stone/Boulder weighing not less than 40 kg each Cum


For Apron on the u/s side 1 1.50 6.43 0.3 2.89
For Apron on the d/s side 1 3.00 6.43 0.3 5.79
For slopes 4 1.54 2.70 0.3 4.99
Total 13.67 2033.00 27791.3133
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
8 15.5 Technical specification and as per relevant clauses of Cum 4 1.54 2.70 0.15 2.49 1265.00 3155.922
Section 2500.

Total for Miscellaneous (D) 56383.9313


Cost of One Culvert (A+B+C+D) 1 No. 736560.92

Lion Engineering Consultants 321


1 2 3 4 5 6.00 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 38 39 40
Length Width Depth Exist. HW Details

Hea No. of Dia of


Location Socpe Pipe Dia No of Pipe Barrel Existing Developm Round Applicable Exc. Exc. PCC Headw Pipe Emb Exc. Exc. Pipe PCC
dwa Pipe
Emb Exc. HW Exc. PCC Headwa Pipe Emb Fill Exist.
Pipe Exist. Exist. Str
Length Width ent Length off Length HW Pipe all Fill HW Fill Pipe ll O/o Wall
ll Exist. Pipe
Length Width Depth
0+730 Widening 0.3 1 17.5 0.00 17.5 17.5 17.5 6.63 14.85 6.63 6.43 17.5 15.2 1.4 1.600 1.4 0.83 1.600 1.22 0.79 0.15 4.256 1.2 1.85 10.6 0 0.6 PCC 1 0.300 HPC
1+120 Reconstruction 1.2 1 15 6.90 15 15 15 6.84 12.35 6.84 6.64 15 12.7 1.4 1.840 1.4 0.83 1.840 1.2 0.77 0.15 2.69 1.44 2.09 3.1 0.5 1.2 STN 1 0.900 HPC
1+535 New Proposal 1.2 1 22.5 0.00 22.5 22.5 22.5 6.84 19.85 6.84 6.64 22.5 20.2 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
3+175 Reconstruction 1.2 1 27.5 9.00 27.5 27.5 27.5 6.84 24.85 6.84 6.64 27.5 25.2 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 4.6 0.45 3.2 1 0.900 HPC
3+545 New Proposal 1.2 1 22.5 0.00 22.5 22.5 22.5 6.84 19.85 6.84 6.64 22.5 20.2 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
4+028 Reconstruction 1.2 1 15 8.70 15 15 15 6.84 12.35 6.84 6.64 15 12.7 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 7.7 0.4 0.6 STN FCW
4+870 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
5+023 Reconstruction 1.2 1 22.5 10.20 22.5 22.5 22.5 6.84 19.85 6.84 6.64 22.5 20.2 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 3 0.5 1.2 STN 1 0.800 CUTSTONE
5+737 Reconstruction 1.2 2 22.5 8.30 22.5 22.5 22.5 6.84 19.85 6.84 6.64 22.5 20.2 1.4 3.880 1.4 0.83 3.880 1.22 0.79 0.15 2.69 1.44 2.09 6.2 0.5 2.9 STN 1 0.900 HPC
5+860 Reconstruction 1.2 1 20 8.40 20 20 20 6.84 17.35 6.84 6.64 20 17.7 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 4.4 0.4 1.9 STN 1 0.600 HPC
5+975 Reconstruction 1.2 1 22.5 8.00 22.5 22.5 22.5 6.84 19.85 6.84 6.64 22.5 20.2 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 6 0 2 STN 1 0.900 HPC
6+108 Reconstruction 1.2 2 15 8.30 15 15 15 9.08 12.35 9.08 8.88 15 12.7 1.4 3.880 1.4 0.83 3.880 1.22 0.79 0.15 2.69 1.44 2.09 4.60 0.50 1.30 STN 2 1.000 FCW
7+170 Reconstruction 1.2 1 22.5 8.30 22.5 22.5 22.5 6.84 19.85 6.84 6.64 22.5 20.2 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 4.50 0.50 2.90 STN 1 0.600 FCW
7+525 Reconstruction 1.2 2 22.5 9.00 22.5 22.5 22.5 6.84 19.85 6.84 6.64 22.5 20.2 1.4 3.880 1.4 0.83 3.880 1.22 0.79 0.15 2.69 1.44 2.09 4.50 0.50 2.70 STN 1 0.600 HPC
8+022 Reconstruction 1.2 1 25 8.40 25 25 25 6.84 22.35 6.84 6.64 25 22.7 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 4.55 0.50 3.50 STN 1 0.600 HPC
9+123 Reconstruction 1.2 1 25 9.00 25 25 25 6.84 22.35 6.84 6.64 25 22.7 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 4.60 0.50 1.85 STN 1 0.750 HPC
0.75+1.4+
9.00 6.00 0.50 1 x 0.75
10+010 New Proposal 1.2 1 20 20 20 20 6.84 17.35 6.84 6.64 20 17.7 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0.5
10+335 Reconstruction 1.2 1 15 8.30 15 15 15 6.84 12.35 6.84 6.64 15 12.7 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 8.50 0.45 1.00 STN 0 HPC
10+540 Reconstruction 1.2 1 22.5 10.50 22.5 22.5 22.5 6.84 19.85 6.84 6.64 22.5 20.2 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 6.00 0.40 2.85 PCC 1 0.750 HPC
10+749 Reconstruction 1.2 1 27.5 9.10 27.5 27.5 27.5 6.84 24.85 6.84 6.64 27.5 25.2 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 1.50 0.45 2.15 PCC 1 0.750 HPC
10+927 Reconstruction 1.2 1 17.5 8.20 17.5 17.5 17.5 6.84 14.85 6.84 6.64 17.5 15.2 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 9.20 0.50 1.10 STN 0 HPC
15+780 Reconstruction 1.2 1 15 8.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 14.00 0.00 1.50 0 HPC
16+150 Reconstruction 1.2 1 20 8.10 20 20 20 6.84 17.35 6.84 6.64 20 17.7 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 9.00 0.50 0.00 PCC 0 HPC
16+960 Reconstruction 1.2 1 17.5 10.10 17.5 17.5 17.5 6.84 14.85 6.84 6.64 17.5 15.2 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 10.00 0.50 1.0+1.2 PCC 1 1.000 HPC
19+620 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
20+305 New Proposal 1.2 1 17.5 0.00 17.5 17.5 17.5 6.84 14.85 6.84 6.64 17.5 15.2 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
20+475 New Proposal 1.2 1 17.6 0.00 17.6 17.6 17.6 6.84 14.95 6.84 6.64 17.6 15.3 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
21+550 Reconstruction 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0.000
22+610 Reconstruction 1.2 1 17.5 7.50 17.5 17.5 17.5 6.84 14.85 6.84 6.64 17.5 15.2 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 3.623 1.44 2.09 10.00 0.45 1.2 PCC 1 1.000 HPC
22+920 Reconstruction 1.2 1 15 7.50 15 15 15 6.84 12.35 6.84 6.64 15 12.7 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 3.618 1.44 2.09 10.10 0.45 1.7 PCC 1 1.000 HPC
23+050 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
23+355 Reconstruction 1.2 1 20 7.50 20 20 20 6.84 17.35 6.84 6.64 20 17.7 1.4 1.840 1.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 10.20 0.48 1.7 pcc 1 0.900 HPC
23+440 Reconstruction 1.2 1 22.5 9.50 22.5 22.5 22.5 6.84 19.85 6.84 6.64 22.5 20.2 2.4 1.840 2.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 2.00 - 2.10 PCC 1 0.300 HPC
23+905 Reconstruction 1.2 2 17.5 7.80 17.5 17.5 17.5 9.08 14.85 9.08 8.88 17.5 15.2 3.4 3.880 3.4 0.83 3.880 1.22 0.79 0.15 2.69 1.44 2.09 13.40 - 0.60 FCW
24+140 Reconstruction 1.2 2 20 9.00 20 20 20 9.08 17.35 9.08 8.88 20 17.7 4.4 3.880 4.4 0.83 3.880 1.22 0.79 0.15 2.69 1.44 2.09 9.50 0.55 1.70 2 0.600 FCW
24+465 Reconstruction 1.2 1 15 7.50 15 15 15 6.84 12.35 6.84 6.64 15 12.7 4.4 1.840 4.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 14.00 0.00 HPC
25+465 Reconstruction 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 4.4 1.840 4.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0 0 0.000 HPC
27+145 Reconstruction 1.2 1 25 9.00 25 25 25 6.84 22.35 6.84 6.64 25 22.7 4.4 1.840 4.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 6 0.5 2 STN 1 1.000 HPC
27+230 Reconstruction 1.2 1 20 9.00 20 20 20 6.84 17.35 6.84 6.64 20 17.7 4.4 1.840 4.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 6 0.5 1.8 STN 1 1.000 HPC
27+625 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 4.4 1.840 4.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
28+740 Reconstruction 1.2 1 17.5 9.00 17.5 17.5 17.5 6.84 14.85 6.84 6.64 17.5 15.2 4.4 1.840 4.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 6 0.5 2.3 STN 1 0.900 FCW
28+855 Reconstruction 1.2 1 20 9.00 20 20 20 6.84 17.35 6.84 6.64 20 17.7 4.4 1.840 4.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 6 0.5 2.3 STN 1 0.900 FCW
30+835 Reconstruction 1.2 1 17.5 9.00 17.5 17.5 17.5 6.84 14.85 6.84 6.64 17.5 15.2 4.4 1.840 4.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 8 0.5 1.55 PCC - 0.700 FCW

31+085 Reconstruction 1.2 1 17.5 7.00 17.5 17.5 17.5 6.84 14.85 6.84 6.64 17.5 15.2 4.4 1.840 4.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 12.00 0.60 PCC 1 0.900 HPC

31+320 Reconstruction 1.2 1 22.5 9.10 22.5 22.5 22.5 6.84 19.85 6.84 6.64 22.5 20.2 4.4 1.840 4.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 6.10 0.50 2.40 STN 1 0.900 HPC

31+790 Reconstruction 1.2 1 22.5 9.00 22.5 22.5 22.5 6.84 19.85 6.84 6.64 22.5 20.2 4.4 1.840 4.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 2.00 0.40 2.40 1 0.900 HPC

32+022 Reconstruction 1.2 1 22.5 9.00 22.5 22.5 22.5 6.84 19.85 6.84 6.64 22.5 20.2 4.4 1.840 4.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 6.15 0.50 2.80 STN 1 0.600 HPC S/Q

32+365 Reconstruction 1.2 1 15 12.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 4.4 1.840 4.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 2.70 0.40 1.20 STN 1 0.200 HPC

32+820 Reconstruction 1.2 1 22.5 9.00 22.5 22.5 22.5 6.84 19.85 6.84 6.64 22.5 20.2 4.4 1.840 4.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 -
33+630 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 4.4 1.840 4.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
34+060 Reconstruction 1.2 2 20 10.30 20 20 20 9.08 17.35 9.08 8.88 20 17.7 4.4 3.880 4.4 0.83 3.880 1.22 0.79 0.15 2.69 1.44 2.09 14.7 1.85 STN - FCW
35+960 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 5.4 1.840 5.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
36+685 Reconstruction 1.2 1 15 12.50 15 15 15 6.84 12.35 6.84 6.64 15 12.7 6.4 1.840 6.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 2.5 0.6 HPC
36+800 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 7.4 1.840 7.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
37+130 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 8.4 1.840 8.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
37+300 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 9.4 1.840 9.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
37+910 New Proposal 1.2 1 22.5 0.00 22.5 22.5 22.5 6.84 19.85 6.84 6.64 22.5 20.2 10.4 1.840 10.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
38+385 Reconstruction 1.2 1 20 8.75 20 20 20 6.84 17.35 6.84 6.64 20 17.7 11.4 1.840 11.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 12.7 1.7 PCC FCW
39+375 New Proposal 1.2 1 17.5 0.00 17.5 17.5 17.5 6.84 14.85 6.84 6.64 17.5 15.2 12.4 1.840 12.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
39+775 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 13.4 1.840 13.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
40+450 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 14.4 1.840 14.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
40+622 New Proposal 1.2 1 17.5 0.00 17.5 17.5 17.5 6.84 14.85 6.84 6.64 17.5 15.2 15.4 1.840 15.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
41+555 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 16.4 1.840 16.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
42+165 New Proposal 1.2 1 17.5 0.00 17.5 17.5 17.5 6.84 14.85 6.84 6.64 17.5 15.2 17.4 1.840 17.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
42+400 Reconstruction 1.2 1 22.5 9.00 22.5 22.5 22.5 6.84 19.85 6.84 6.64 22.5 20.2 18.4 1.840 18.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 8 0.5 2.3 STN 1 0.9 HPC
42+975 Reconstruction 1.2 1 17.5 9.00 17.5 17.5 17.5 6.84 14.85 6.84 6.64 17.5 15.2 19.4 1.840 19.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 6.20 0.50 2.00 STN 1 1 HPC
43+885 Reconstruction 1.2 3 17.5 9..3 17.5 17.5 17.5 10.92 14.85 10.92 10.72 17.5 15.2 20.4 5.920 20.4 0.83 5.920 1.22 0.79 0.15 2.69 1.44 2.09 15.50 0.40 1.30 PCC 3 0.9 VCW
44+160 Reconstruction 1.2 1 17.5 9.50 17.5 17.5 17.5 6.84 14.85 6.84 6.64 17.5 15.2 21.4 1.840 21.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 2.00 0.45 1.20 1 0.9 HPC S/Q
44+560 New Proposal 1.2 1 20 0.00 20 20 20 6.84 17.35 6.84 6.64 20 17.7 22.4 1.840 22.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
44+705 Reconstruction 1.2 1 22.5 9.00 22.5 22.5 22.5 6.84 19.85 6.84 6.64 22.5 20.2 23.4 1.840 23.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 1.50 0.4 1.95 1 0.75 HPC
45+140 Reconstruction 1.2 1 25 9.00 25 25 25 6.84 22.35 6.84 6.64 25 22.7 24.4 1.840 24.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 1.50 0.4 1 1 0.75 HPC
46+370 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 25.4 1.840 25.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
46+615 New Proposal 1.2 1 20 0.00 20 20 20 6.84 17.35 6.84 6.64 20 17.7 26.4 1.840 26.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
47+200 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 27.4 1.840 27.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
47+405 Widening 1 1 20 10.00 10 10 10 6.63 7.35 6.63 6.43 10 7.7 28.4 1.600 28.4 0.83 1.600 1.22 0.79 0.15 2.45 1.2 1.85 9.00 0.40 1.0+0.6 PCC 1 1 HPC
47+510 Reconstruction 1.2 2 25 7.50 25 25 25 8.88 22.35 8.88 8.68 25 22.7 29.4 3.880 29.4 0.83 3.880 1.22 0.79 0.15 2.69 1.44 2.09 25.00 0.70 PCC FCW
0.9+0.4+0.
8.50 16.50 0.55 1 HPC
48+675 Widening 0.9 1 20 11.5 11.5 11.5 6.63 8.85 6.63 6.43 11.5 9.2 30.4 1.600 30.4 0.83 1.600 1.22 0.79 0.15 2.45 1.2 1.85 6 PCC 0.9
49+170 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 31.4 1.840 31.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
49+680 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 32.4 1.840 32.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
49+975 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 33.4 1.840 33.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
50+040 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 34.4 1.840 34.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
50+200 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 35.4 1.840 35.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
50+300 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 36.4 1.840 36.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
50+550 New Proposal 1.2 2 15 0.00 15 15 15 8.88 12.35 8.88 8.68 15 12.7 37.4 3.880 37.4 0.83 3.880 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
50+600 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 38.4 1.840 38.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
50+800 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 39.4 1.840 39.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
50+950 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 40.4 1.840 40.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
51+020 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 41.4 1.840 41.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
51+810 Reconstruction 1.2 1 27.5 10.10 27.5 27.5 27.5 6.84 24.85 6.84 6.64 27.5 25.2 42.4 1.840 42.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 6.1 0.4 1.7 PCC 1 1 HPC
52+720 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 43.4 1.840 43.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
52+935 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 44.4 1.840 44.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
53+000 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 45.4 1.840 45.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
53+135 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 46.4 1.840 46.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0
53+220 New Proposal 1 1 15 0.00 15 15 15 6.63 12.35 6.63 6.43 15 12.7 47.4 1.600 47.4 0.83 1.600 1.22 0.79 0.15 2.45 1.2 1.85 0 0 0
53+675 Widening 1 1 20 10.00 10 10 10 6.63 7.35 6.63 6.43 10 7.7 48.4 1.600 48.4 0.83 1.600 1.22 0.79 0.15 2.45 1.2 1.85 0.40 1.70 1 X 1.00 HPC
7.5
6.20 0.50 2.60 1 X 0.90 HPC
53+785 Reconstruction 1.2 1 15 9.0 15 15 15 6.84 12.35 6.84 6.64 15 12.7 49.4 1.840 49.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 PCC
54+295 Reconstruction 1.2 1 17.5 10.00 17.5 17.5 17.5 6.84 14.85 6.84 6.64 17.5 15.2 50.4 1.840 50.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 6.00 0.40 2.00 1 X 1.00 HPC

55+080 Reconstruction 1.2 1 15 10.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 51.4 1.840 51.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 6.00 0.40 1.40 PCC 1 X 1.00 HPC
55+503 Reconstruction 1.2 1 17.5 10.30 17.5 17.5 17.5 6.84 14.85 6.84 6.64 17.5 15.2 52.4 1.840 52.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 6.20 0.40 1.60 PCC 1 X 0.90 HPC
55+710 Widening 1 2 25 10.10 14.9 14.9 14.9 8.36 12.25 8.36 8.16 14.9 12.6 53.4 3.400 53.4 0.83 3.400 1.22 0.79 0.15 2.45 1.2 1.85 8.00 0.40 1.80 PCC 2 X 1.00 HPC
56+050 New Proposal 1.2 1 15 10.20 15 15 15 6.84 12.35 6.84 6.64 15 12.7 54.4 1.840 54.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 6.20 0.40 1.0+0.6 1 X 1.00 HPC
56+268 Widening 1 1 20 10.20 9.8 9.8 9.8 6.63 7.15 6.63 6.43 9.8 7.5 55.4 1.600 55.4 0.83 1.600 1.22 0.79 0.15 2.45 1.2 1.85 6.30 0.00 1.60 PCC 1 X 1.00 HPC
56+355 Widening 1 1 22.5 10.00 12.5 12.5 12.5 6.63 9.85 6.63 6.43 12.5 10.2 56.4 1.600 56.4 0.83 1.600 1.22 0.79 0.15 2.45 1.2 1.85 6.20 1.70 PCC 1 X 1.00 HPC
56+522 Reconstruction 1.2 1 20 10.10 20 20 20 6.84 17.35 6.84 6.64 20 17.7 57.4 1.840 57.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 6.20 0.45 2.00 PCC 1 X 1.00 HPC
56+610 Widening 1 1 27.5 10.20 17.3 17.3 17.3 6.63 14.65 6.63 6.43 17.3 15 58.4 1.600 58.4 0.83 1.600 1.22 0.79 0.15 2.45 1.2 1.85 6.20 0.40 2.10 PCC 1 X 1.00 HPC
56+785 New Proposal 1.2 1 15 0.00 15 15 15 6.84 12.35 6.84 6.64 15 12.7 59.4 1.840 59.4 0.83 1.840 1.22 0.79 0.15 2.69 1.44 2.09 0 0 0