Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

ESPULGAR, SOFIA J.

ENGG 411 FORM 5 – DELEGATION PLAN


ACTION PLAN /WORK ACTIVITY SECTION/UNIT DATE OF COMPLETION
SUPPORTIV
INCLUSI E
STATU
VE MEANS OF DELEGATION MEASURES EARLY INDICATOR
AUTHORIT DELEGATED S
TASKS COMPLE RESPONSIBILITY FOR
Y PERSON
TION DELEGATE
DATE WHER
WHAT WHEN WHAT HOW
E
Should be able to
comment and make Inadequate or It causes project
recommendations as Contractor Prevention of incomplete
Pre- Key client Contracts, plan Before Work managers to seek
10/29/19 to the adequacy of (contract Cost specifications Finished
construction advisor and Financing Construction on the project Site expert
the resultant administrator) Overrides
drawings intervention
construction phase
plan.

Before and
Key client Construction field
Foundation 12/05/19 handling design During
advisor Planning
information between Contractor Construction
the client, designers, (project
principal designer manager and No proper
Inadequate
and contractors on field engineer) Procurement and Before, During Prevention of inspection in communication
Key client site Work
Drawing 06/09/20 Construction and After Project the course of between Finished
advisor Site
proper Construction Quality Issues the process of construction
construction department

Should be able to
Before, During
Landscaping/ Key client handle design Contractor Architecture
06/15/20 and After
Design advisor changes before or (Architect) designing
Construction
during the project

Contractor Prevention of Government


Conducts the final
Final Details/ Key client (contract After Delays in the Schedule Work restraints or
06/15/20 walkthrough and Commissioning Finished
Close Out advisor administrator), Construction Construction changes Site Clients alteration
Touch Ups
project manager Schedule of designs
ESPULGAR, SOFIA J.
ENGG 411 FORM 5 – DELEGATION PLAN
and field
engineer)
Supervise the Final
Arrangements before Contractor
Key client After
Final Draw 06/18/20 the cleaning and (contract Project Closeout
advisor Construction
moving in of the administrator)
clients

You might also like