Engg 411 Form 3 Resources
Engg 411 Form 3 Resources
A. MATERIALS
What Quantity Quality When Source? Unit Cost Amount
needed?
Sand ₱1200/cu.
50cu.m River sand Construction ALU Merch. ₱60,000
m
Gravel ₱1450/cu. ₱47,125
32.5cu. m Construction ALU Merch.
M
Portland Cement 700 bags Portland Construction ALU Merch. ₱290/bag ₱203,000
Hollow Block 6500 pcs Construction ALU Merch. ₱ 12/pc ₱78000
Steel Bars 3500 pcs 25mm Construction ALU Merch. ₱400/pc ₱ 1,400,000
Tie Wire 165 kg #16 Construction ALU Merch. ₱ 75/kg ₱12,375
Angle Bars 325 pcs 4” diameter Construction ALU Merch. ₱ 653/pc ₱212,225
Welding Rods Structural- ₱ 130/kg ₱21,450
165 kg Construction ALU Merch.
6011
Plywood 416 pcs Marine Construction ALU Merch. ₱ 600/pc ₱249,600
Lumber 332 pcs 2x2Rough Construction ALU Merch. ₱ 86/bd.ft ₱28,552
Ceramic Tiles Wall tile(30x30) ₱ 55/pc ₱214,500
3900 pcs Construction ALU Merch.
Floor tile(30x30)
Granite Tiles 3500 pcs Construction ALU Merch. ₱488/pc ₱1,708,000
Nails 26 kgs Finishing Construction ALU Merch. ₱65/kg ₱1690
Paint 165 gal. Boysen Construction ALU Merch. ₱590/gal ₱97,350
Sub-total______₱4,333,867______
B.
EQUIPMENT
Quantity Quality Period Source? Rental Rate Amount
needed?
Concrete Mixer 2 1 Bagger Pouring ALU Merch. ₱560/day ₱3360
Backhoe 1 Excavation ALU Merch. ₱4800/day ₱ 14400
Dump Trucks 2 Clearing ALU Merch. ₱4000/day ₱8000