North: Mataf Extension King Abd Al-Aziz-Minaret - 1 Stairs and Elevator Steel Plans 1/3

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

THE CONNECTION BETWEEN IPE200 AND CONNECTION PLATE OUT OF CONCRETE SLAB

CLASH BETWEEN IPE200 WITH STEP (TYP. FOR ALL LEVELS) (TYP. FOR ALL LEVELS)
UPN200 IS NOT APPLICABLE (SECT. 15.2-15.2) SEE ATTACHED -4 (SECT. 5-5)
SEE ATTACHED-1 AND 1.b IN DRAWING No.S11082-0100D-41-SS-FC-04-01-05-5030-01 IN DRAWING No.S11082-0100D-41-SS-FC-04-01-05-5030-01
SEE ATTACHED-2 & 1.a (FOR ALL LEVELS)

10 11 12 13 14 15 16

20 21 22 23 24 25 26

30 31 32 33 34 35 36

40 41 42 43 44 45 46

50 51 52 53 54 55 56

60 61 62 63 64 65 66

70 71 72 73 74 75 76

80 81 82 83 84 85 86

NORTH

(SECT. 4-4) CLASHES:


1. BETWEEN STAIR BASE PLATE AND COLUMN
2. BETWEEN STAIR BASE PLATE AND CONCRETE WALL
3. STAIR BASE PLATE OUT OF CONCRETE SLAB
SEE ATTACHED -3

29/01/2015
S11082-0100D
1/50
S.K.
O.K. / M.L.
M.G.
S.G.

MATAF EXTENSION

KING ABD AL-AZIZ-MINARET - 1

STAIRS AND ELEVATOR

STEEL PLANS 1/3

41 SS FC 04 01 01 1030

You might also like