Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE BUILDING OFFICIAL

TABLE OF CONTENTS
A1 PERSPECTIVE VIEW, VICINITY MAP, SITE DEVELOPMENT PLAN
A2 GROUND FLOOR PLAN, SECOND FLOOR PLAN
DISTRICT/ MUNICIPALITY
A3 FRONT ELEVATION, REAR ELEVATION
A4 LEFT SIDE ELEVATION, RIGHT SIDE ELEVATION
LAND USE AND ZONING
A5 SECTION THRU A, SECTION THRU B
A6 WINDOW DETAILS, DOOR DETAILS
A7 STAIR DETAILS PLAN. STAIR DETAILS ELEVATION
A8 GROUND FLOOR CEILING PLAN, SECOND FLOOR CEILING PLAN, ROOF PLAN
E1 GROUND FLOOR POWER LAYOUT SECOND FLOOR POWER LAYOUT
E2 GROUND FLOOR LIGHTING LAYOUT SECOND FLOOR LIGHTING LAYOUT
E3 GENERAL NOTES AND SPECS,LOAD SCHED, LOAD ANALYSIS,RISER DIAGRAM
MOUNTING HEIGH DETAILS, LEGENDS AND SYMBOL LINE AND GRADE
P1 GROUND FLOOR SANITARY LAYOUT, SECOND FLOOR SANITARY LAYOUT
P2 GROUND FLOOR WATER LAYOUT, SECOND FLOOR WATER LAYOUT
P3 SANITARY AND STORM DRAINAGE ISOMETRIC VIEW, WATERLINE ISOMETRIC
VIEW
P4 GENERAL NOTES, MATERIAL SPECIFICATION, LEGENDS, DETAIL OF CATCH
BASIN, DETAIL OF EXISTING SEPTIC TANK, DETAIL OF FLOOR DRAIN,
DETAIL OF WATER METER, DETAIL OF HOSE BIBB
S1 FOUNDATION PLAN, SECOND FLOOR FRAMING PLAN, ROOF BEAM PLAN,
ARCHITECTURAL
SCHEDULE OF COLUMNS, SCHEDULE OF ISOLATED FOOTINGS
S2 TYPICAL BEAM DETAIL,SCHEDULE OF BEAMS, SCHEDULE OF SLAB, FLOOR
SLAB DETAIL SECTIONS
S3 TYPICAL COLUMN DETAIL, TYPICAL FOOTING DETAIL, TYPICAL CANTILEVER
FOOTING DETAIL, SLAB-END WALL
S4 ROOF FRAMING PLAN, TYPICAL DETAIL OF RB-RAFTER CONNECTION,

1 PERSPECTIVE VIEW GN GENERAL NOTES


A1
STRUCTURAL
NE
LI
Y
RT m
Franklin Baker
San Pablo E 12
OP
PR

PR
m
4. 4

OP
EX
TOTAL SAN PABLO TO CITY PROPER

E
IS

RT
TI N
G

Y
SANITARY

ST

L IN
RU
lo.

E
C
gu

TU
ia n

RE
Tr

St.
onor

15
el Le

PROPOSED

m
UPGRADE TO
Migu

N
SECOND FLOOR IS
IO ELECTRICAL
V
STRUCTURE B DI
SU
O
N IT
TO
Sampaguita AN
A
LL
VI
.,
ST
LA
el a

E
AM
am

M
GU
m
Gu

MECHANICAL

3 VICINITY MAP
A1

NTS 2 SITE DEVELOPMENT PLAN


A1

NTS

Project Title Owner Sheet Content Project number 001


1 PERSPECTIVE VIEW
Date 06/12/2020
Emelita De La Cruz 2 SITE DEVELOPMENT PLAN
ARCHITECT/ENGINEER
De La Cruz Residential Building(Upgrade) 3 VICINITY MAP PRC. REG no . A1

25/06/2020 12:12:32 PM
Drawn by
4 TABLE OF CONTENTS Date
ENGR. JULIUS MAE TOLENTINO

Gumamela St. Villa Antonio Subd. Phase II, Gumamela St. Villa Antonio Subd. Phase II, 5 Place
Location San Pablo CIty
Location San Pablo CIty Scale As indicated
6

You might also like