Client: XXXXXXXXXX Conclusion

Report Date: 18 December 2012


PENDING
INSPECTION Inspection
No.:
XXXXXX

REPORT
Form No.: XXXXSAMPLEXXXX Page 1 of
42

I. GENERAL INFORMATION
Service Performed: imagen
Cliente:
Supplier:
Maquina:
PV:
OF:
Item No.:

Fecha de
inspeccion:
Lugar de Inspeccion:

II. INSPECTION SUMMARY


Pass Failed Pendi N/A
ed ng
A. Cantidad
B. Inspeccion Visual
C. E.N.D.

AQL Details
Inspection Standard: - Critical Major Minor
Sampling Plan: - AQL: Not 2.5 4.0
Allowed
Inspection Level: Fixed Sample Size Accepted: 0 1 2
Order Quantity: 700 Found: 0 0 2
Available Quantity: 700 (100%)
Sample Size: 20 PCS
Result: Within AQL

III. REMARKS
@
Problem Remarks:
For item W-81C: actual 4pcs M8*18MM screws, 9pcs M6*30MM screws and 3pcs M6*25MM screws in packing,
1. while 3pcs M8*18MM screws, 8pcs M6*30MM screws and 2pcs M6*25MM screws printed in instruction sheet.
Please refer to below photos for detail.
2. The factory did not agree inspector to conduct the carton drop test and the Back strength test.
3. The factory only agreed to provide 1pc plastic base and 1pc metal base to conduct the Base testing-static test.
4. The factory could not provide required equipment to do the weight test.
General Remarks:
5. The factory was requested to mend the defective products our inspector found during the inspection.
Address: Office 620, Building 3, Lane 900, Qu Yang Road, Hong Kou District, Shanghai, China:
200023 Tel: +86-21-55223991 Mob: +86-15502111051 E-mail: asiainvestgroup@gmail.com - Website:
mmunoz@asiagrupo.com
www.asiagrupo.com
Client: XXXXXXXXXX Conclusion
Report Date: 18 December 2012
PENDING
INSPECTION Inspection
No.:
XXXXXX

REPORT
Form No.: XXXXSAMPLEXXXX Page 2 of
42
Factory Information:

Address: Office 620, Building 3, Lane 900, Qu Yang Road, Hong Kou District, Shanghai, China:
200023 Tel: +86-21-55223991 Mob: +86-15502111051 E-mail: asiainvestgroup@gmail.com - Website:
mmunoz@asiagrupo.com
www.asiagrupo.com
Factory cooperation:
☐ Good - Enough manpower to assist, and good cooperation.
6.
" AVERAGE - Enough manpower to assist.
☐ Poor - Manpower, equipment or document not provided timely.
Number of workers in factory:
7. ☐ Less than 50 people, ☐ 50-100 people, ☐ 100-500 people, " 500-1000 people, ☐ More than
1000 people.
Inspector's opinion on the factory:
☐ Good - The factory was neat and tidy. The testing equipment was well maintained and calibrated.
8.
" AVERAGE - The factory was tidy, and the testing equipment ran normally.
☐ Poor - The factory was messed, the basic testing equipment was not available / not workable.
Sample Collection Record:
9. No sample was collected on site.
Photos:

Remark 1: actual 4pcs M8*18MM screws, 9pcs Remark 1: 3pcs M8*18MM screws, 8pcs M6*30MM
M6*30MM screws
screws and 3pcs M6*25MM screws in packing and 2pcs M6*25MM screws printed in instruction sheet
IV.CONCLUSION

PENDING
Approved by: Quality Director
Note

Note: 1. This report reflects our findings at the time and the place of inspection based on random samples selected. 2. This inspection was
carried out to the best of our knowledge and abilities, and our responsibility is limited to the exercise of reasonable one. 3. This report does
not relieve the sellers from their contractual obligations nor does it prejudice buyer’s right for compensation for any apparent and/or hidden
defects not detected during our inspection or occurring thereafter. 4. This report does not evidence shipment. 5. Our services are subject
to the General Conditions of Service of Asia Investment & Services Group, which is shown at our website and can be sent to you upon
written request.

Please find our inspection details from next page (Section A – F).
A.QUANTITY
Quantity Unit: PCS
Or Qt Quantity Breakdown Sample Size
P.O. Item Carton
d y/ Packe Unpacke Unfinish Packe Unpacke
s
er Cart d d ed d d
Q on
ty
W- 70 1 7 7 0 0 3 0
81C 0 0
W- 150 1 150 150 0 0 4 0
FHF57 118A
02 W- 100 1 100 100 0 0 3 0
-05 83B
W-91 150 1 150 150 0 0 4 0
W- 80 1 8 8 0 0 2 0
3001 0 0
W- 150 1 150 150 0 0 4 0
1007
Total 700 - 700 700 0 0 2 0
: 0
Selected Cartons :
20 Cartons were selected randomly on site. No carton number in shipping mark.
Carton No.: / / / / / / / / / / /
Result: Passed
Remark
:

B. @
WORKMANSHIP
Inspection Standard: - A Accept Total Result
Q ed Found
L
Sampling Plan: - Critical: Not 0 0 Passed
Allowed
Inspection Level: Fixed Sample Size Major: 2.5 1 0 Passed
Sample Size: 20 PCS Minor: 4.0 2 2 Passed
Workmanship Defectives / Function Inspection Findings
Descripti Critic Majo Mino
on al r r
For Item W-81C Sample size: 3
PCS
1 No defective was found
.
For Item W-118A Sample size: 4
PCS
2 Dirty mark on base 1
.
For Item W-83B Sample size: 3
PCS
3 Dirty mark on base 1
.
For Item W-91 Sample size: 4
PCS
4 No defective was found
.
For Item W-3001 Sample size: 2
PCS
5 No defective was found
.
For Item W-1007 Sample size: 4
PCS
6 No defective was found
.
Total found: 0 0 2
Accepted: 0 1 2
Sample size: 20 20 20
Result: Passed
Remark
:
Note: A Defective is defined as a unit of product that contains one or more defects. A Defect is defined as any non-conformance of the
inspected unit of product with specified requirements. A single defect is taken into account per each defective unit; only one most
serious
defect is taken into account per each defective unit.
1 Defect photos of W-118A

Nil

Dirty mark on base Nil


2 Defect photos of W-83B

Nil

Dirty mark on base Nil

C. ON-SITE TESTS
Description Meth Sample Result /
od Size Reading
1 Assembly check Follow product instruction and ease for assembly 1pc per Passed
item
Static loading 300lbs per seating for 1 hour. No obvious
2 1pc per Passed
test for chair deformation
item
Put unit onto a 10 degree incline, and rotate 360° 2pcs per
3 Stability test Passed
slowly, cannot tip over item
4 Wobble test Place samples onto a flat glass surface, no wobble. 20pcs Passed
5 Proof loading test Impact force: 300lbs / height: 15.2cm / 2times: 1pc per Passed
item
highest & lowest
6 Back strength 300lbs, for 1 minute. 0 Pending
test
200 lbs. for 1 min. the vertical load is uniformly
Arm Strength
7 applied through a 5 In. area at the apparent 1pc per Passed
test (Vertical)
weakest point. item
100 lbs. for 1 min. the load is applied to the arm
Arm Strength
8 rest 1pc per Passed
test
horizontally at the most forward point of the arm item
(Horizontal)
rest area.
1pc
plastic
9 Base testing- 2500lbs, for 1minute, 2 cycles. Pending
base
static
and 1pc
metal
base
1 Function check Must conform to indicated function 20pcs Passed
0
All
1 Based on parts list on instruction sheet, no missing. 20pcs Pending
accessories
1
check
One corner, three edges, six sides, at height of / on
1 Carton drop test 0 Pending
the cement floor
2
2pcs
1 Rub check Rub for 15s by cloth with water Passed
per
3
ite
m
Use 3M tape for coating, electroplate and printing 2pcs
1 Tape check Passed
(logo, rating label and so on) per
4
ite
m
Result: Pending
Remark:

D. PRODUCT SPECIFICATION
Client’s Spec. Ref. Sample 1# Sample 2# Sample 3# Sample
Item No.: W-
81C
D×W×H / / 67x63x110-118 67x63x109-119 67x63x110-118
(cm)
Item No.: W-
118A
D×W×H / / 53x59x87.5-99 53x59x87.5-99 53x59x87.5-99
(cm)
Item No.: W-
83B
63.5x63.5x112- 63.5x63.5x110- 63.5x63.5x113-
D×W×H / /
12 12 12
(cm)
0 1 0
Item No.: W-91
D×W×H / / 55.5x58x91- 55.5x58x91- 55.5x58x91-103
(cm) 103 103
Item No.: W-
3001
D×W×H / / 60x60x105-113 60x60x105-113 /
(cm)
Item No.: W-
1007
64x61x112.5-
D×W×H / / 64x61x112- 64x61x111.5-
122.
(cm) 5 122.5 123

Result: N/A No client spec., actual finding & record.


Remark:

E. PACKING @
Package Details
Item Qty / Carton Carton Size L×W×H (cm) Gross Weight Qty / Inner box
No.
(K
G)
Marki Actu Marking Actual Marki Actu Marki Act
ng al ng al ng ual
W-81C 1 1 58.5x32x6 59x33x64 19.6 / / /
4
W-118A 1 1 56.5x27.5x 56.5x28x53 10.1 / / /
52
W-83B 1 1 65x22.5x5 66x22.5x59 15.3 / / /
9
W-91 1 1 61x21.5x5 61x22x52 10.75 / / /
2
W-3001 1 1 78x24.5x5 78x25x59.5 15.4 / / /
9
W-1007 1 1 78x22x59 79x22x59.5 14 / / /
Export Carton Details
Fastening Metal No Nylon Yes
Staples Band
Material Cardboard Corrugated Paper 5-ply
Plies
Packing Method

Each set with instruction sheet packed into poly bag, and then packed into master carton.

Assortment Method
No assortment
Result: Pending
Remark
:

F. MARKING & LABELING


Barcode/Labeling/Printing
Name Location Result
Washing Poly-bag Actual
label finding
Instruction manual and documentation check Provided
By
- The functionality description in English on the instruction manual is
Factory Pending
adopted on the actual unit.
Shipping Marks
Shipping Marks (on 2 sides) Actual
finding
Side Marks (on 2 sides) Actual
finding
Inner Box Marks (on / side) N/A
Result: Pending
Remark
:

G. CLIENT SPECIAL REQUIREMENT


Client Result
Requirements
1 Nil N/A
.
Result: N/A No client special requirement.
Remark
:

H. PHOTOS
1 Photos of W-81C
Master carton Shipping mark

Side mark Open carton

5-ply Packing
All parts packing Seat cushion packing

Arm rest packing Back cushion packing

Screws and tools Casters packing


packing
Base packing Gas lift packing

Warning words on poly All parts view


bag

Instructions sheet Gas lift


Marking Marking

Armrest Head

Head Back cushion


Back cushion Base

Base Casters

Seat cushion Seat cushion


Marking Marking

Marking Screws and tools

Unit view Front view


Side view Side view

Back view Top view

Nil

Bottom view Nil


2 Photos of W-118A
Shipping mark Side mark

Open carton All parts packing

All parts view Instructions sheet


Gas lift Base

Base Armrest

Back cushion Back cushion


Detail of back cushion Seat cushion

Seat cushion Front label

Seat plate Seat plate


Marking Casters

Screws and tools Unit view

Front view Side view


Back view Side view

Top view Bottom view


3 Photos of W-83B

Shipping mark Side mark


Open carton All parts packing

All parts view Instructions sheet

Gas lift Marking


Back cushion Back cushion

Head Head

Base Base
Armrest Seat plate

Marking Seat plate

Marking Screws and tools


Casters Unit view

Front view Side view

Back view Side view


Top view Bottom view
4 Photos of W-91

Shipping mark Side mark

Open carton All parts packing


All parts view Instructions sheet

Base Base

Seat cushion Seat cushion


Back cushion Back cushion

Armrest Casters

Gas lift Marking


Screws and tools Unit view

Front view Side view

Side view Back view


Top view Bottom view

Nil

Bottom view Nil


5 Photos of W-3001

Shipping mark Side mark


Open carton All parts packing

All parts view Instructions sheet

Armrest Seat plate


Seat plate Marking

Back cushion Back cushion

Seat cushion Seat cushion


Front label Gas lift

Marking Base

Base Casters
Screws and tools Unit view

Front view Side view

Back view Side view


Top view Bottom view
6 Photos of W-1007

Shipping mark Side mark

Open carton All parts packing


All parts view Instructions sheet

Armrest Seat plate

Seat plate Marking


Marking Base

Base Seat cushion

Seat cushion Front label


Back cushion Back cushion

Screws and tools Casters

Gas lift Marking


Unit view Front view

Side view Back view

Side view Top view


Nil

Bottom view Nil


7 Photos of on-site test

Assembly check Assembly check

Assembly check Assembly check


After assembly check Static loading test

Stability test Wobble test

Proof loading test Proof loading test


Arm Strength test Arm Strength test

Base testing-static Base testing-static report

Base testing-static report Function check


Function check Function check
8 Photos of other information

Inspection samples QC label

Goods in warehouse Goods in warehouse


PE
*********************************************** This is The End of the Report *******************************************
Note: 1. This report reflects our findings at the time and the place of inspection based on random samples selected. 2. This inspection was
carried out to the best of our knowledge and abilities, and our responsibility is limited to the exercise of reasonable one. 3. This report does
not relieve the sellers from their contractual obligations nor does it prejudice buyer’s right for compensation for any apparent and/or hidden
defects not detected during our inspection or occurring thereafter. 4. This report does not evidence shipment. 5. Our services are subject
to the General Conditions of Service of Asia Investment & Services Group, which is shown at our website and can be sent to you upon
written request.