Justification of Funds
Budget Estimate
The Music section is in need of keyboards, amplifier, and guitars – acoustic and electric,
recorders, leads and extensions. The instruments needed for music is based on the inventory form
that was completed by the teacher, as this form shows the instruments that are in need of repair
and what needs to be replaced. The figure of JMD 918,000 is reflected on a Performa invoice
The Drama area will need a stage with wings, props, costumes, fan, shoes, wigs, make, and
jewelry. The subject is not new to the school, it is just that the area is been developed or been
expanded to include practical’s. The teacher for the area had nothing working with; therefore, the
estimated figure to elevate the area is JMD 450,000. A quotation showing the various break
The Visual Arts area will need flat screen TV, fabric, paint, and painting brush, among other
items. We await a proper invoice from the teacher as his projections appear to be off key;
The Plumbing Tech subject area has some amount of material however lack in tools such as
angle grinder, torque wrench, pipe wrench, drill etc. some additional materials that are required
includes : Pvc/Cpvc cleaner clear, tangit wet/dry cement blue, etc. Based on the inventory, the
material and tools will need to be increase in an effort to effectively cover the NCTEVT
curriculum. The Performa invoice from National Supply co. stated a figure of JMD 747,257.35
after tax. However, based on discussion with the teacher, she stated that 500,000.00 could help to
welder apron, welders tong, regulator oxygen, etc. Plus, safety gears for students to work
effectively and safely. Based on the inventory, the material and tools will need to be increase in
an effort to effectively cover the NCTEVT curriculum. The Performa invoice from National
Supply co. stated a figure of JMD 1,844,821.33 after tax. However, based on discussion with the
teacher, he stated that the funds may increases to 1.9 million as additional materials may be
needed. Note: we may need to revise this list to select the most important items to reduce this
expense.
The Construction Technology area lacks various materials, tools, and equipments as shown on
the inventory form. The materials needed includes: lumbers, boards, blocks, steel, etc. Based on
information from the teacher, the total cost may increase from JMD 126,664.54 to about JMD
460,000. The increase in funding is because the furniture or wood working subject is usually
taught with construction; this may require different types of materials and tools. Please to see
quotation from rapid true value with a total of JMD 126,664.54 after tax for construction.
various skill area, and working with resources. The figure of 200,000.00 is assigned to purchase
additional materials that the various practical areas may not have.
The Electrical Technology area needs tools, material, and equipments. Some material includes:
etc. tools include: screw drivers, drills, lineman knifes etc. The area has no material and tools
based on inventory, and a figure of 500,000.00 after tax is shown on ABC electrical quotation.
Additional material may be needed as a lot of electronic items were not included on the
quotation.