Summary Pipelog : 1100 mm Diameter.

PIPE LAYING EXCAVATION BACKFILLING MILD STEEL PIPES AND SPECIALS MILD STEEL PIPES AND SPECIALS
MS 1400MM MS 1200MM MS 1100MM MS 900MM MS 700MM MS 1400MM MS 1200MM MS 1100MM MS 900MM MS 700MM 1400MM 1200MM 1100MM 900MM 700MM MILD STEEL BEND 1400 MM MILD STEEL BEND 1100 MM
CROSSING CROSSING
CROSSING
ROCK USM HEDGES, UNDER ROCK SAND & EARTH SAND & EARTH SAND & EARTH SAND & EARTH SAND & EARTH
< 3.0m ≥ 3.0m < 3.0m ≥ 3.0m < 3.0m ≥ 3.0m < 3.0m ≥ 3.0m < 3.0m ≥ 3.0m < 3.0m ≥ 3.0m < 3.0m ≥ 3.0m < 3.0m ≥ 3.0m < 3.0m ≥ 3.0m < 3.0m ≥ 3.0m UNDER WATER UP 30° 31° - 45° 46° - 60° 61° - 90° UP 30° 31° - 45° 46° - 60° 61° - 90°
DATE CHAINAGE FENCES CONCRETE BACKFILL BACKFILL BACKFILL BACKFILL BACKFILL

5990.00 35.00 718.00 10.00 3600.00 2.00 13.00 2.00 148.00 2.00 5990.00 35.00 718.00 10.00 3600.00 2.00 13.00 2.00 148.00 2.00 10317.00 10317.00 50.00 5.00 5.00 1.00 61100.00 6900 32500.00 110 1280 39 22 2 6 25 2.00 2 3
M M M M M M M M M M M M M M M M M M M M M3 M3 M² M M M³ M3 M3 M3 M3 M3 NO NO NO NO NO NO NO NO
2.3.1.1 (A) B 2.3.1.1 (B) D 2.3.1.1 (C) F 2.3.1.1 (D) H 2.3.1.1 (E) K 2.1.2. (A) B 2.1.2. (B) D 2.1.2. © F 2.1.2. (D) H 2.1.2. '€ K 2.1.3 2.1.4 N O P Q 2.1.5 (A) 2.1.5 (B) 2.1.5 (C) 2.1.5 (D) 2.1.5 (E) 2.3.1.2.(j) 2.3.1.2.(m) 2.3.1.2.(d) 2.3.1.2.(a) 2.3.1.2.(l) 2.3.1.2.(i) 2.3.1.2.(f) 2.3.1.2.(c)
MILD STEEL PIPE 1100MM

03-Jan-20 8310 - 8370 56.00 60.00 391.80 2.00

04-Jan-20 8370 - 8420 50.00 50.00 342.50

06-Jan-20 9181 - 9121 60.00 60.00 393.00

07-Jan-20 9121 - 9011 110.00 110.00 753.50

07-Jan-20 9011 - 8991 20.00 20.00 137.00

10-Jan-20 8991 - 8911 80.00 80.00 571.96

11-Jan-20 8420 - 8456 30.00 36.00 235.78 1.00

13-Jan-20 8456 - 8542 90.00 90.00 616.46

14-Jan-20 8542 - 8612 70.00 70.00 479.47

19-Jan-20 8612 - 8640 28.00 28.00 200.19

06-Feb-20 8884 - 8887 3.00 3.00 21.45

07-Feb-20 8640 - 8690 50.00 50.00 342.48

08-Feb-20 8690 - 8710 20.00 20.00 131.00

11-Feb-20 8710 - 8760 50.00 50.00 342.48

12-Feb-20 8760 - 8790 30.00 30.00 214.49

13-Feb-20 8790 - 8801 12.00 12.00 74.99

14-Feb-20 8887 - 8861 26.00 26.00 178.09 1.00

15-Feb-20 8861 - 8801 60.00 60.00 392.97

18-Feb-20 9181 - 9241 60.00 60.00 410.97

19-Feb-20 9241 - 9321 80.00 80.00 571.96

20-Feb-20 9321 - 9421 100.00 100.00 654.95

21-Feb-20 9421 - 9521 100.00 100.00 864.95

22-Feb-20 9521 - 9591 70.00 70.00 458.47

23-Feb-20 9591 - 9671 70.00 70.00 523.96

24-Feb-20 9671 - 9761 90.00 90.00 643.46

25-Feb-20 9761 - 9801 40.00 40.00 261.98

26-Feb-20 9801 - 9881 80.00 80.00 523.96

27-Feb-20 9881 - 9911 30.00 30.00 214.49

02-Mar-20 9911 - 9991 80.00 80.00 547.96

02-Mar-20 9991 - 10071 80.00 80.00 547.96

04-Mar-20 10071 - 10101 30.00 30.00 214.49

TOTAL 0.00 - - - 1755.00 - - - - - 0.00 - - - 1765.00 - - - - - - - - - - - 0.00 - 12259.17 - 0.00 - - - - 4.00 - -

BQ.2/5 OF 10 BQ.2/5 OF 10 BQ.2/5 OF 10 BQ.2/5 OF 10 BQ.2/5 OF 10 BQ.2/5 OF 10 BQ.2/5 OF 10 BQ.2/5 OF 10 BQ.2/5 OF 10 BQ.2/5 OF 10 BQ.2/5 OF 10 BQ.2/5 OF 10 BQ.2/5 OF 10 BQ.2/5 OF 10 BQ.2/5 OF 10 BQ.2/5 OF 10 BQ.2/5 OF 10 BQ.2/5 OF 10 BQ.2/5 OF 10 BQ.2/5 OF 10 BQ.2/5 OF 10 BQ.2/6 OF 10 BQ. 2/4 BQ.2/6 OF 10 BQ.4/4 OF 12 BQ.4/4 OF 12 BQ.4/4 OF 12 BQ.4/4 OF 12 BQ.4/4 OF 12 BQ.4/4 OF 12 BQ.4/4 OF 12 BQ.4/4 OF 12
PAGE BQ 2/7 BQ 2/7 BQ 2/7 BQ 2/7 BQ 2/7 BQ.2/5 OF 10

2.3.1.1 (A) B 2.3.1.1 (B) D 2.3.1.1 (C) F 2.3.1.1 (D) H 2.3.1.1 (E) K 2.1.2. (A) B 2.1.2. (B) D 2.1.2. © F 2.1.2. (D) H 2.1.2. '€ K 2.1.3 2.1.4 N O P Q 2.1.5 (A) 2.1.5 (B) 2.1.5 '(C) 2.1.5 (E) 2.3.1.2.(j) 2.3.1.2.(m) 2.3.1.2.(d) 2.3.1.2.(a) 2.3.1.2.(l) 2.3.1.2.(i) 2.3.1.2.(f) 2.3.1.2.(c)

Prepared By Verified by,

___________________________ ___________________________
Contractor Resident Engineer
CONTRACT NO. IWSS/PKG A: SOUTHERN LINE/19/10606

CONSTRUCTION AND COMPLETION OF WATER MAIN PIPELINE, PIPING WORKS AND OTHER RELATED WORKS INCLUDING TESTING,
COMMISSIONING, COMPLETION AND HANDING OVER TO THE AUTHORITY FOR
CADANGAN ‘INTEGRATED WATER SUPPLY SCHEME (IWSS) NORTHERN CORRIDOR’ UNTUK
i. TETUAN SIME DARBY PROPERTY BERHAD
ii. TETUAN SIME DARBY ELMINA DEVELOPMENT SDN BHD
iii. TETUAN KL-KEPONG PROPERTY DEVELOPMENT SDN BHD
iv. TETUAN KL-KEPONG COUNTRY HOMES SDN BHD
DARI KOLAM AIR BUKIT TADUN KE CADANGAN PEMBANGUNAN UNTUK TETUAN DI ATAS DAN BERAKHIR DI CADANGAN PEMBANGUNAN
ELMINA WEST DI MUKIM BUKIT RAJA, DAERAH PETALING, SELANGOR DARUL EHSAN. – PACKAGE A (SOUTHERN LINE)

PROGRESS CLAIM NO: 3


DATE: 27/10/2019

SITE MEASUREMENT SHEET

MS PIPE 1100MM

DATE: LENGTH OF PIPE (M) FITTINGS REMARKS

3-Jan-20 56.00 2 NOS - BENDS 45 DEGREE


4-Jan-20 50.00
6-Jan-20 60.00
7-Jan-20 110.00
7-Jan-20 20.00
10-Jan-20 80.00
11-Jan-20 30.00 1 NOS - BENDS 45 DEGREE
13-Jan-20 90.00
14-Jan-20 70.00
19-Jan-20 28.00
6-Feb-20 3.00
7-Feb-20 50.00
8-Feb-20 20.00
11-Feb-20 50.00
12-Feb-20 30.00
13-Feb-20 12.00
14-Feb-20 26.00 1 NOS - BENDS 45 DEGREE
15-Feb-20 60.00
18-Feb-20 60.00
19-Feb-20 80.00
20-Feb-20 100.00
21-Feb-20 100.00
22-Feb-20 70.00
23-Feb-20 70.00
24-Feb-20 90.00
25-Feb-20 40.00
26-Feb-20 80.00
27-Feb-20 30.00
2-Mar-20 80.00
2-Mar-20 80.00
4-Mar-20 30.00
1755.00

i) TOTAL LENGTH OF 1100MM DIA MS PIPE (M) = 1755.00


ii) TOTAL FITTINGS = 4 Nos (BEND 45 DEG)

VERIFICATION OF WORK DONE


DATE ON SITE :
COMPANY DESIGNATION NAME SIGN
SDEDSB Senior Manager Mr. Velayutham V Ramasamy
SDEDSB Assistant manager Ms. Nor Aziana Bt. Mohd Nor

SDEDSB Assistant manager Ms. Noorliyana Romle

KLK Assistant manager Mr. Chong Lim Jiunn


JPP Superitendent Officer Ir. Mohd Azrain

JPP Resident Engineer Mr. Zuhaidi Zainol


VSB Project Manager Mr. Yasaf Hamsharee Suratmin
VSB Site Representative Mr Alam Buana Zanidi
CONTRACT NO. IWSS/PKG A: SOUTHERN LINE/19/10606

CONSTRUCTION AND COMPLETION OF WATER MAIN PIPELINE, PIPING WORKS AND OTHER RELATED WORKS INCLUDING TESTING,
COMMISSIONING, COMPLETION AND HANDING OVER TO THE AUTHORITY FOR
CADANGAN ‘INTEGRATED WATER SUPPLY SCHEME (IWSS) NORTHERN CORRIDOR’ UNTUK
i. TETUAN SIME DARBY PROPERTY BERHAD
ii. TETUAN SIME DARBY ELMINA DEVELOPMENT SDN BHD
iii. TETUAN KL-KEPONG PROPERTY DEVELOPMENT SDN BHD
iv. TETUAN KL-KEPONG COUNTRY HOMES SDN BHD
DARI KOLAM AIR BUKIT TADUN KE CADANGAN PEMBANGUNAN UNTUK TETUAN DI ATAS DAN BERAKHIR DI CADANGAN PEMBANGUNAN
ELMINA WEST DI MUKIM BUKIT RAJA, DAERAH PETALING, SELANGOR DARUL EHSAN. – PACKAGE A (SOUTHERN LINE)

PROGRESS CLAIM NO: 3


DATE: 27/10/2019

SITE MEASUREMENT SHEET

MS PIPE 1400MM

DATE: LENGTH OF PIPE (M) FITTINGS REMARKS

21-Jan-20 3.00
3-Feb-20 23.00
4-Feb-20 30.00
5-Feb-20 30.00
6-Feb-20 20.00
7-Feb-20 50.00
8-Feb-20 50.00
9-Feb-20 20.00
10-Feb-20 60.00
11-Feb-20 90.00
12-Feb-20 80.00
24-Feb-20 70.00
25-Feb-20 100.00
27-Feb-20 60.00
29-Feb-20 80.00
4-Mar-20 60.00
3-May-20 20.00
6-Mar-20 40.00
7-Mar-20 40.00
8-Mar-20 70.00
9-Mar-20 70.00
10-Mar-20 60.00
11-Mar-20 70.00
12-Mar-20 60.00
13-Mar-20 60.00
14-Mar-20 60.00
15-Mar-20 60.00
16-Mar-20 50.00
1486.00

i) TOTAL LENGTH OF 1400MM DIA MS PIPE (M) = 1486.00


ii) TOTAL FITTINGS =

VERIFICATION OF WORK DONE


DATE ON SITE :
COMPANY DESIGNATION NAME SIGN
SDEDSB Senior Manager Mr. Velayutham V Ramasamy

SDEDSB Assistant manager Ms. Nor Aziana Bt. Mohd Nor


SDEDSB Assistant manager Ms. Noorliyana Romle

KLK Assistant manager Mr. Chong Lim Jiunn


JPP Superitendent Officer Ir. Mohd Azrain

JPP Resident Engineer Mr. Zuhaidi Zainol

VSB Project Manager Mr. Yasaf Hamsharee Suratmin


VSB Site Representative Mr Alam Buana Zanidi
CONTRACT NO. IWSS/PKG A: SOUTHERN LINE/19/10606

CONSTRUCTION AND COMPLETION OF WATER MAIN PIPELINE, PIPING WORKS AND OTHER RELATED WORKS INCLUDING TESTING,
COMMISSIONING, COMPLETION AND HANDING OVER TO THE AUTHORITY FOR
CADANGAN ‘INTEGRATED WATER SUPPLY SCHEME (IWSS) NORTHERN CORRIDOR’ UNTUK
i. TETUAN SIME DARBY PROPERTY BERHAD
ii. TETUAN SIME DARBY ELMINA DEVELOPMENT SDN BHD
iii. TETUAN KL-KEPONG PROPERTY DEVELOPMENT SDN BHD
iv. TETUAN KL-KEPONG COUNTRY HOMES SDN BHD
DARI KOLAM AIR BUKIT TADUN KE CADANGAN PEMBANGUNAN UNTUK TETUAN DI ATAS DAN BERAKHIR DI CADANGAN PEMBANGUNAN
ELMINA WEST DI MUKIM BUKIT RAJA, DAERAH PETALING, SELANGOR DARUL EHSAN. – PACKAGE A (SOUTHERN LINE)

PROGRESS CLAIM NO: 3


DATE: 27/10/2019

SITE MEASUREMENT SHEET

PIPE JACKING

AREA % OF WORKDONE TOTAL % REMARKS

JACKING POINT 1 i) JACKING PIT = 70% / (50%)


ii) RECEIVING PIT = 0% / (50%)
TOTAL = 35% 35.00%

JACKING POINT 2 i) JACKING PIT = 0% / (50%)


ii) RECEIVING PIT = 0% / (50%)
TOTAL = 0% 0.00%

JACKING POINT 3 i) JACKING PIT = 100% / (50%)


ii) RECEIVING PIT = 0% / (50%)
TOTAL = 50% 50.00%

JACKING PONT 4 i) JACKING PIT = 100% / (50%)


ii) RECEIVING PIT = 100% / (50%)
TOTAL = 50% 100.00%

TOTAL % OF WORKDONE / 400% = CURRENT PROGRESS 185.00%


OF JACKING PIT & RECEIVING PIT
/ 400%
46.25%

VERIFICATION OF WORK DONE


DATE ON SITE :
COMPANY DESIGNATION NAME SIGN
SDEDSB Senior Manager Mr. Velayutham V Ramasamy

SDEDSB Assistant manager Ms. Nor Aziana Bt. Mohd Nor


SDEDSB Assistant manager Ms. Noorliyana Romle

KLK Assistant manager Mr. Chong Lim Jiunn


JPP Superitendent Officer Ir. Mohd Azrain

JPP Resident Engineer Mr. Zuhaidi Zainol

VSB Project Manager Mr. Yasaf Hamsharee Suratmin


VSB Site Representative Mr Alam Buana Zanidi

You might also like