JL. Compaka Raya.RT 18 No 22.Komp. Mekarsari,Kel. Telaga Biru
Banjarmasin,Kalimantan seiatan 70119. Indonesia
Tipn, +62 511-672 417
Pare remaponereny Email : rama.rezzekiperkasa@gmail.com
ECO
FULL CORPORATE OFFER
No Ref: 0016 /FCO/ RRP-NIE/GCV ADB 5.500-5.300/V/2019
Date, 21 May 2019
To |: NARADA INTERNATIONAL ENERGY
uP ‘Mr .JUSRAN.
With Respect
Wie, PT.RAMA REZZEKI PERKASA, the sell
corporate responsibilitie:
the following commodity
and miner with full 1 and
confirm that we are ready, willing and able to
ce with the terms
follows:
fan, Indonesia
lount (£108)
Specification As Per Attached Below
GCV (ADB) 5.500-5.300 Keal/Kg | <5.300Kcal/Kg
Total Moisture (ARB) 33% 3368
Inherent Noistures (ADB) 108-15%
sh (ADB) oS max >Ise
Volatile Matter (ADB) 388-408
Total Sulphur (ADB) 0,58 Max >98
Fixed Carbon (ADB) By Diff
HGI 60 APPROX
Size (0-50) mm 95% Up
: Rp $55.00 (Fifty-five United states Dollars)
: Mother Vessel (MV) + Cost Mother Vessel CHOTTOGRAM Port is the
destination of Bangladesh (CFR)
You are satisfied, we are very happyJI. Gempaka Raya.RT 18 No 22.Komp. Mekarsari.K
Banjarmasin,Kalimantan seistan 70119. Indonesia
Tipn. +62 511-672 4177
Fr nama neces pemaaan Email : rama.rezzokiperkasa@gmail.com
Pe it Texm cai
Contract Period : 12 months, subject to successful performance in
first shipment 50.000-100.000 MT (+108)
> . Loading Port
Jetty PT.Talenta Bumi, Marabahan
Position 2°59'14" South 114°47'6"East
Capasity of Barge 300ft - 320ft
Facility of Jetty Comveyour
Loading rate 100 to 1500MT /Hours
> . Jetty KPP/Hasnur HJU ,Sei Putting
Position 02-56-10 South 114-53-14 East
Capasity of Barge : 300ft - 320ft
Facility of Jetty Comveyour
Loading rate 1000 MT to 1500 MT /Hours
Capasity of Barge : 300ft - 320ft
v
Jetty Tapin Coal Terminal, Margasari Tapin
Position 2°55'6"South 114°55'2"East
Capasity of Barge : 300ft - 320ft
Facility of Jetty Comveyour
Loading rate 1500 to 2000 Mr /Hours
> . Jetty DTBS, Asam asam Tanah Laut
Position 3°57'35"S 115°8'17"
Capasity of Barge : 300ft - 320ft
Facility of Jetty Comveyour
Loading rate 1000 to 1500 Mr /Hours
> . The position of anchoring mother vessel
Taboneo Anchorage (03 - 40 - 00 “S / 114 - 24 - 00 “E)
> . The distance fron the jetty to the position of mother vessel
Between + 22 mil. To + 25 mil
Loading rate 7.500 - 8000 MT PWWD SHINC
Es ted shipment : June 2019
You are satisfied, we are very happyJl. Cempaka Raya.RT 18 No 22.Komp. Mekarsari,Kel. Telaga Biru
Banjarmasin,Kalimantan seiatan 70119, Indonesia
‘Tipn. #62 511-872 4177
catenin Email : rama.rezzekiperkasa@gmail.com
Surveyor:
PT.GEOSERVICE/SUCOFINDO/PT.ANINDYA WIRAPUTRA ,PT.CARSURIN, SGS, CCIC,
SCCI.INSPEKTORATE (IOL,PT.TRIYASA PIRSA UTAMA
Validity of offe:
Within 7 (Seven) working days from issuing date
we are waiting for your positive response reply, for your attention
and cooperation, we thank you
Please sign and stamp if you agree on the
For and on Behalf of available fields
Date: / /2019
Et OD RESIDE PEREBSS NARADA INTERNATIONAL ENERGY
Ne RRAGHRUDDIN Name : MrJUSRAN
Title : President Director
TITLE :OQperational Director
To proceed the above subject matter as plan and schedule :
a shall approve the FCO, signing and endorse.
2 shall submit Draft Contract to our company within 3 (days) days
signing and approve the FCO.
3. r review draft of contract.
4. Seller & Buyer signing Electronic draft contract
5. Buyer make site visit (Mine/stockpile/Jetty) if require.
6. ied with the visit and coal quality, Suyer and seller sign Hard copy
of Contract based on electronic contract agreed.
You are satisfied, we are very happy