Hiley Formula For Driven Pile Temp Comp XLSX Setting Translate
Hiley Formula For Driven Pile Temp Comp XLSX Setting Translate
Project: Matang New Township Tumpukan didorong oleh dorongan dari ram yang menghasilkan penetrasi ke tanah.
Daya dukung diperoleh melalui tahanan tanah pada tumpukan
Set Criteria:
where:
Pult = ultimate load capacity
= Psafe * FOS = 900,000 N
Psafe = safe/permissible working load = 450,000 N
FOS = factor of safety = 2
ef = hammer efficiency = 0.8 *refer to database sheet
W = weight of ram/hammer = 30,000 N
Wp = weight of pile = 58,320 N
Wa = weight of driving assembly = 5,000 N
n = coefficient of restitution = 0.4 *refer to database sheet
H = drop of hammer = 1.2 m
H = 2*H' for diesel hammer
(H' = drop of ram)
s = pile penetration for last blow or "set" (m)
C1 = temporary compression allowance for pile head or cap (m) 0.006 m 0.22 in
C2 = temporary compression allowance for elastic deformation of pile shaft (m) 0.016 m 0.62 in
C3 = temporary compression allowance for quake of ground (m) 0.005 m 0.20 in
CT = C1+C2+C3 = assume total temporary compression (m)
= 0.026 m
ef* W * H = 0.032 m
Pult
(C1+C2+C3)/2 = 0.013 m
Therefore:
s = 0.55 mm
Temporary Compression, C = Cc + Cp + Cq
3 in/76.2mm packing
Pile Head & Cap Cc under helmet or driving 0.07 0.15 0.22 0.30
cap*
Ground surrounding
Quake Cq pile and under pile 0.10 to 0.15 to 0.05 to
0.05
point 0.20 0.25 0.15
Ground surrounding 0.10 to 0.15 to 0.05 to
Quake Cq pile and under pile 0.05 0.20 0.25 0.15
point
Note: * If these devices are used in combination, the compression should be added together.
Length, L measure in feet
1 feet = 0.3048m & 1 inch = 25.4mm
(Source: A Guide on The Control of The Installation of Driven Pile, 1st Edition, Ir. Dr. Ting W.H., Ir. Chiam T.T., 1976)
Coefficient of restitution
Wood 0.25
Concrete 0.4
Steel 0.5
Set Criteria:
where:
Pult = ultimate load capacity
= Psafe * FOS = 660,000 N
Psafe = safe/permissible working load = 330,000 N
FOS = factor of safety = 2
ef = hammer efficiency = 0.85 *refer to database sheet
W = weight of ram/hammer = 30,000 N
Wp = weight of pile = 28,800 N
Wa = weight of driving assembly = 10,000 N
n = coefficient of restitution = 0.4 *refer to database sheet
H = drop of hammer = 0.6 m
H = 2*H' for diesel hammer
(H' = drop of ram)
s = pile penetration for last blow or "set" (m)
C1 = temporary compression allowance for pile head or cap (m) 0.004 m 0.15 in
C2 = temporary compression allowance for elastic deformation of pile shaft (m) 0.015 m 0.59 in
C3 = temporary compression allowance for quake of ground (m) 0.004 m 0.15 in
CT = C1+C2+C3 = assume total temporary compression (m)
= 0.023 m
ef* W * H = 0.023182 m
Pult
(C1+C2+C3)/2 = 0.011 m
Therefore:
s = 0.89 mm
Set Criteria:
where:
Pult = ultimate load capacity
= Psafe * FOS = 660,000 N
Psafe = safe/permissible working load = 330,000 N
FOS = factor of safety = 2
ef = hammer efficiency = 0.6 *refer to database sheet
W = weight of ram/hammer = 20,000 N
Wp = weight of pile = 28,800 N
Wa = weight of driving assembly = 10,000 N
n = coefficient of restitution = 0.4 *refer to database sheet
H = drop of hammer = 1.0 m
H = 2*H' for diesel hammer
(H' = drop of ram)
s = pile penetration for last blow or "set" (m)
C1 = temporary compression allowance for pile head or cap (m) 0.004 m 0.15 in
C2 = temporary compression allowance for elastic deformation of pile shaft (m) 0.015 m 0.59 in
C3 = temporary compression allowance for quake of ground (m) 0.004 m 0.15 in
CT = C1+C2+C3 = assume total temporary compression (m)
= 0.023 m
ef* W * H = 0.018182 m
Pult
(C1+C2+C3)/2 = 0.011 m
Therefore:
s = -3.21 mm
Set Criteria:
ef * W * H W + (n2 * Wp)
Pult = x
S+ (C1 + C2 + C3)/2 W + Wp
ef * W * H W + (n2 * Wp)
S = x - (C1+C2+C3)/2
Pult W + Wp
where:
Pult = ultimate load capacity
= Psafe * FOS = 660,000 N
Psafe = safe/permissible working load = 330,000 N
FOS = factor of safety = 2
ef = hammer efficiency = 0.6 *refer to database sheet
W = weight of ram/hammer = 30,000 N
Wp = weight of pile = 46,080 N
Wa = weight of driving assembly = 10,000 N
n = coefficient of restitution = 0.4 *refer to database sheet
H = drop of hammer = 1.8 m
H = 2*H' for diesel hammer
(H' = drop of ram)
s = pile penetration for last blow or "set" (m)
C1 = temporary compression allowance for pile head or cap (m) 0.004 m 0.15 in
C2 = temporary compression allowance for elastic deformation of pile shaft (m) 0.015 m 0.59 in
C3 = temporary compression allowance for quake of ground (m) 0.004 m 0.15 in
CT = C1+C2+C3 = assume total temporary compression (m)
= 0.023 m
ef* W * H
= 0.049091 m suku a
Pult
W + (n2 * Wp)
= 0.453 m suku b
W + Wp
Therefore:
s=a*b-c = 10.92 mm