Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

The time for solution exceeded 1 hour.

A High Performance Computing (HPC) license will reduce your


solution time. Consider using an HPC license or purchasing an HPC license from your ANSYS
Representative.

The solver engine was unable to converge on a solution for the nonlinear problem as constrained.
Please see the Troubleshooting section of the Help System for more information.

The unconverged solution (identified as Substep 999999) is output for analysis debug purposes. Results
at this time should not be used for any other purpose.

Although the solution failed to solve completely at all time points, partial results at some points have
been able to be solved. Refer to Troubleshooting in the Help System for more details.

During this solution, the elapsed time exceeded the CPU time by an excessive margin. Often this
indicates either a lack of physical memory (RAM) required to efficiently handle this simulation or it
indicates a particularly slow hard drive configuration. This simulation can be expected to run faster on
identical hardware if additional RAM or a faster hard drive configuration is made available. For more
details, please see the ANSYS Performance Guide which is part of the ANSYS Help system.

You might also like