Professional Documents
Culture Documents
SPINNING
SPINNING
L- lakshmi
R- ring frame
6- Model
S- variator
Up to 60
40s – 36.64
62s – 40.914
3.55 to 64.77
40s – 25.11
62s – 33.13
6. What are the types of spindles and their mechanical speed possible?
M 21 HD – 18000 rpm
M 18.5 HD – 22000 rpm
M 19 VN/HN – 25000 rpm
1:40
18.5 mm
70 mm
Emperor +
38 mm
1mm
1.25 Nm3 / hr
2.00 Nm3 / hr
45 degree
7 to 8 bar
0.5 bar
2.4 bar
Enabling for doing ring centering without running drafting rollers and air
connection
Ring center- Disable for running machine normally
If waste is completely pulled out it leads to return air into the filter and causing
waste drum chocking
So always leave something behind, never pull it out completely from the machine.
While removing ring rail, place hardwood block under cam segment
Ring rail has to removed from offend side or use tool for releasing the spring load
10 mm
Lift + 20 mm
Weight = 32 gms
Polypropylene
44. What is doffing position?
4 to 6 mm (4 mm)
5 mm
48. What is the load range required to compensate ring rail load?
20 to 25 N
Y4 valve is ON
Dismantle wheel B
Adjust operating pressure to 4 bar
Wheel A must rotate with torque of 40Nm
Adjust operating pressure to 3.8
Wheel A must not rotate at 40Nm
If it rotates
Remove gear box cover
KM6 Lock nut in the A wheel shaft inside gear box is tightened till wheel
A does not rotate with 40Nm with 3.8 bar
52. How much play to be set for ring rail?
½ of empty tube + 40 mm
0.5 to 1.5 mm
.
57. C1 and C2 setting procedure.
Once in 3 months
When belt is changed
When operating speed is changed
59. What is the Variator belt size?
1745 X 62 X 22 mm
60. What are the reasons for changing the variator belt?
Once in 45 days
0.2 mm
28 mm
Leads to undraft
Higher breakage
Bottom apron damages
68. What is Impact of increasing the break draft?
Browen -2.5mm
Dark Grey -2.75mm
White -3.0mm
Yellow -3.25mm
Black -3.5mm
Cream -3.75mm
Red -4.0mm
Green -4.5mm
Blue -5.0mm
Grey -5.5mm
70.What is RH % recommended?
50 to 55 %
71.What is impact of RH %?
Braekage rate
Roller lapping tendency
Higher imperfection
28.5mm
ID - 19mm
OD - 30mm
Width -28mm
Servo spin 22
Servo system 68
8500 rpm
250 mm
2371*11 HS 5
H- Habasit
S- special
5- recommended above 20000 rpm
Lift
160 mm -2386 mm
170 mm -2371 mm
180 mm -2356 mm
30,000 hrs
85.What is top arm load?
Material – PC
Plug gauge
110 to 130 mm
5 to 10 mm WC suction
96.What is the purpose of venting in damping cylinder?
To remove airlock
3.5 kgm
6 rows
1.long
2.short
Long -948
Short -252
12 NM
Knurling roll
Flutted roll
1. Knurling roll
Middle -150 nos
2. Flutted roll
Front-150 nos
Back -150 nos
36 mm
51 nos
6.5 kgs
45 NPPB
1 mm
0.5 mm
ABCD Wheels
A+B=165 teeth
C+D=137 teeth
E&F
117.How many teeths winding length combination?
E+F=113 teeth
10.519
67.05
Break draft =67.05/break draft wheel
25.34
Note:-
1.Ring cleaning should not be done till the completion of running in
2.Increase the speed by 500 rpm every day till the recommended traveller
Speed is achieved
3.After completion running in of rings for achieving optimum traveller life
4.Ring cleaning and applying the kluber tex 146 N oil
123.what is setting between tin roll shaft ?
4 mm
2 nos
128.If there is any safty & over load tripping for main motors and others ?
1. B1-Delivery
2. B2 –spindle speed.
3.B25- Motor reset.
4. B26- Motor reset.
5.B33- Motor reset
6.B34-Thread guide Tilting.
7.B37- Thread guide Tilting RHS
8.B38- Thread guide Tilting LHS
9. B40-Under Winding.
H1,H1A – 2 nos
15 nos.
135. What are the Electro valves used for Auto Doffing ?
10.Y9- Lubrication HS
11. Y9a- Lubrication TS
12.Y21- Brake
13.Y25-Variator Forward.
14.Y26- Variator Reverse.
15.Y27-Waste Evacution.