This document provides details of the back filling quantity calculation for the main building of the S.S.H.P Site in Jagdalpur. It lists the excavation quantities accounting for deductions from offsets, lift pits, ramps and concrete elements. The total excavation quantity is 19,361.87 cubic meters. After accounting for deductions, the back filling quantity from the plinth beam bottom to natural ground level is 11,214.30 cubic meters. Adding further back filling up to 1.4 meters height, the total back filling quantity is 20,086.06 cubic meters or 7,09,319.18 cubic feet after including a 15% compaction allowance.
This document provides details of the back filling quantity calculation for the main building of the S.S.H.P Site in Jagdalpur. It lists the excavation quantities accounting for deductions from offsets, lift pits, ramps and concrete elements. The total excavation quantity is 19,361.87 cubic meters. After accounting for deductions, the back filling quantity from the plinth beam bottom to natural ground level is 11,214.30 cubic meters. Adding further back filling up to 1.4 meters height, the total back filling quantity is 20,086.06 cubic meters or 7,09,319.18 cubic feet after including a 15% compaction allowance.
This document provides details of the back filling quantity calculation for the main building of the S.S.H.P Site in Jagdalpur. It lists the excavation quantities accounting for deductions from offsets, lift pits, ramps and concrete elements. The total excavation quantity is 19,361.87 cubic meters. After accounting for deductions, the back filling quantity from the plinth beam bottom to natural ground level is 11,214.30 cubic meters. Adding further back filling up to 1.4 meters height, the total back filling quantity is 20,086.06 cubic meters or 7,09,319.18 cubic feet after including a 15% compaction allowance.
This document provides details of the back filling quantity calculation for the main building of the S.S.H.P Site in Jagdalpur. It lists the excavation quantities accounting for deductions from offsets, lift pits, ramps and concrete elements. The total excavation quantity is 19,361.87 cubic meters. After accounting for deductions, the back filling quantity from the plinth beam bottom to natural ground level is 11,214.30 cubic meters. Adding further back filling up to 1.4 meters height, the total back filling quantity is 20,086.06 cubic meters or 7,09,319.18 cubic feet after including a 15% compaction allowance.
P Site , Jagdalpur (Main Building Back Filling Qty)
BOQ DETAILS Item PARTICULARS NO. Quantity Nos L B D Main Building Back filling Qty Drawing No : 2019-SSH-AU-STR-2016 Total Excavation Qty 1 x 1 71.60 64.70 4.17 19317.6084 Main Building Avg.NGL=99.60m Lvl Excavation Required Level = 95.425
Total Excavation Depth = (99.60-95.425)=4.175m
L=66.600+5.00=71.60 B = 64.70 Deductions: Off sets -1 x 1 9.45 2.70 4.17 -106.39755 -1 x 1 7.99 5.40 4.17 -179.91882 -1 x 1 19.65 5.00 4.17 -409.7025
Deduction Gravel filling Qty in Cum = -246.40 Deduction P.C.C Qty in Cum = -246.40 Deduction Raft R.C.C. Qty in Cum = -3698.00 Deduction Beams R.C.C. Qty in Cum = -427.00 Deduction Columns R.C.C. Qty in Cum = -209.77 Deduction Basement area = -3320.00
Back Filling (up to NGL 99.60m Height) Qty in Cum = 11214.3005
From Plinth Beam Bottom to NGL Back Filling Including 2mtr offset from column face(101.60-0.60-99.60 = 1.40mtr Height) 6251.84