Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 10

# HASH INTERNATIONAL

For a brighter tomorrow

VIP CLUB
PROPOSAL

PREPARED FOR: CREATED


05/07/2016
VIP Group
Dar-es-salaam, Tanzania VALID UNTIL
04/08/2016
2 VIP CLUB WEB PROJECT

ABOUT US

Hash is pleased to submit a proposal for the development of the VIP Web
applications. The terms of this proposal are valid for up to thirty days after being
presented.

OUR PROFILE PROJECT OBJECTIVES


WE are a full-service mobile and web
application development company that To Design and develop a portal, which will provide information &
provides you with apps for any project. ability for the users to use the platform to have all their
Hash international makes applications information on it and use it to access their information including
solutions easy by offering full white label
payment info and personal information etc.
solutions, mobile applications, mobile
websites, complete brand customization,
This information will be organized based on colleges and or
applications for small businesses and more.
Above all (YOUR COMPANY) is the complete occupation so as to group the users in their respective fields.

Scope of Work Apart from this it will provide opportunities for all users to
interact with each other via the portal as we will intergrate a
 Logo design. forum in the project.
 Website design, development
and functionality coding along The VIP portal will be the center of all information, admins will be
with admin control panel to able to provide points to when a user accomplishes an activity,
manage the portal contents and all users will be able to monitor new activities and apply to
 Database Design. the acativity.
 Payment module development
 Card intergration into payment
The VIP portal will be able to accept the VIP cards and process
module
payments on the third phase of the project.
 Apllication development for
android and ios
 Information Security layers and Mobile apps will be developed, to make using the VIP portal
encryption. easier and more convenient to users.
3 VIP CLUB WEB PROJECT

VIP Project timeline


Here are the specification we are going to be dealing with in this proposal

PROJECT SPESIFICATION

PART I VIP price breakdown

PART II VIP project diagram representation.

PART III VIP project description

PART IV VIP project timeline

PART V Terms and conditions

PART VI Payment terms


4 VIP CLUB WEB PROJECT

VIP PRICE BREAKDOWN


Phase 1

Database design $800


Interface design phase 1 $700
VIP Card accounts intergration to database $1900
Content Management system (CMS) intergration $900
Security Layer intergration Phase 1 $1200
Entering data and training data entry managers $300
$5,800

Phase 2

Android Application development $4200


IOS application development $4300
Database expanding for phase 2 $500
Forum intergrations $2500
Data entering and training data entry managers $500
$12,000

Phase 3

Database expanding for phase 3 $1200


Development of payment module $9800
Card processing for payment module intergration $8500
Security and encryption for Payment module $4000
Data entering and training data entry managers $500
$24,000

Total $ 41,800
5 VIP CLUB WEB PROJECT
6 VIP CLUB WEB PROJECT

PROJECT DESCRIPTION
Phase 2 Phase 3
Phase 1
Web and database Mobile apps and forum Payment module and card
development intergration intergration

The whole development phases will be devided into 3 major phases that will all
compromise of major parts that together complete the VIP portal

Phase 1 Phase 2
 Phase 1 is where we implement
all the web features, this is the  Phase 2 is expanding to a forum
most important phase, because for users to talk and discuss
the rest of the system will be different subjects, and making
based on the database that we applications for mobile and other
create from this phase, after the uses.
database is when we develop the
front end with all the user
interface.

Phase 3
 Phase 2 is the last phase and the
critical phase, this is where we
finalize the payment modules
and create a final security layer
for the whole system.
7 VIP CLUB WEB PROJECT

PROJECT TIMELINE
Phase 1
Weeks Preparation Designing Develop 1 Develop 2 Develop 3 Completion
Mauris quam dolor, cursus at porta et, luctus eget purus. Nunc tempor
1 luctus interdum. Duis libero leo, consequat ut accumsan eu, viverra et
eratDonec nec lorem et tellus mollis lobortis. Integer sed dolor ut leo
2 porta mollis. Proin eu augue augue. Duis id velit in arcu accumsan
congue. Donec at massa id risus varius eleifend vitae at quam. Vivamus
3 tristique est vitae felis vehicula mollis. Vivamus quam dolor, tempor ac
gravida sit amet, porta fermentum magna. Aliquam euismod commodo
4 nisl, vel luctus lorem fermentum quis.

6 Mauris quam dolor, cursus at porta et, luctus eget


purus. Nunc tempor luctus interdum.
7

Phase 2
Weeks Preparation Designing Develop 1 Develop 2 Develop 3 Completion
Mauris quam dolor, cursus at porta et, luctus eget
1

2
STEP IV purus. Nunc tempor luctus interdum.

Mauris quam dolor, cursus at porta et, luctus eget purus. Nunc tempor
4 luctus interdum. Duis libero leo, consequat ut accumsan eu, viverra et
 Mauris quam dolor, cursus at
eratDonec nec lorem et tellus mollis lobortis. Integer sed dolor ut leo
5porta et, luctus eget purus. porta mollis. Proin eu augue augue. Duis id velit in arcu accumsan
 Nunc tempor luctus interdum.
congue. Donec at massa id risus varius eleifend vitae at quam. Vivamus
6Duis libero leo, consequat ut tristique est vitae felis vehicula mollis. Vivamus quam dolor, tempor ac
accumsan eu, viverra et erat gravida sit amet, porta fermentum magna. Aliquam euismod commodo
8
nisl, vel luctus lorem fermentum quis.
Duis id velit in arcu accumsan congue. Donec at massa id risus varius
10
eleifend vitae at quam. Vivamus tristique est vitae felis vehicula mollis.
12 Vivamus quam dolor, tempor ac gravida sit amet.
8 VIP CLUB WEB PROJECT

Phase 3
Weeks Preparation Designing Develop 1 Develop 2 Develop 3 Completion

11

13

14

The whole project is projected to be complete within 7 months from when the Document are signed
to when the project is completed.

Phase one will take 2 months to complete, phase 2 and three both require 3 months each to fully
complete.
A team of 5 people will be working on it full time to get the project finalized and fully running, other
members will pitch in when needed.
Phase one is set to start as soon as initial down payment is made.
The platform can be start to be used within 1 – 2 weeks as more updates are added on the cloud as
we go.
9 VIP CLUB WEB PROJECT

TERMS & CONDITION


5. After the end of the project, Every new change that was not originally foretold is chargeable. The
price quotation will be provided accordingly

6. Mistakes from our side are not chargeable and will be taken in account as a top priority.

7. 12 Months free support after the successful implementation of the site.

8. Training will be provided by us to the staff on how to use the system.

9. Our company will not be responsible for the unavailability or the damage of the website due to
the misconduct from the client.

10. Damage of the site due to the natural disaster, virus attack, hacking, manhandling of the system
and hardware and software failures which are beyond our reach is not covered by us.

PAYMENT TERMS
1. 50 Percent of the cost of the phase must be paid before the start of each phase.

2. Once the advance payment is paid for, we start working on the phase and only when the client is

fully satisfied with the completion of the phase is when the final payment of the phase is made

and we await instructions on starting the phase that follows.

3. Once the proposal is approved by both parties, a contract will be drafted for signing.

4. All phases will be completed inallocated time period, if any additional charges occur after the

allocated time period we will use our own resources to complete said charges
Vestibulum ante ipsum primis in faucibus orci 10
luctus

#HASHFor a brighter Tomorrow

You might also like