Professional Documents
Culture Documents
Piping Inspection Summary 30-07-18-1
Piping Inspection Summary 30-07-18-1
Piping Inspection Summary 30-07-18-1
1 7/30/2018 10 :00 HRS Pump Room 2P To Column 3P. 813-FW-021 RE INSTATEMENT INSPECTION RE INSTATEMENT MAGESH/NARASIMHA AZAD AA CLASS II
2 7/30/2018 09:00 HRS Pump Room 1S. 813-FW-005 RE INSTATEMENT INSPECTION RE INSTATEMENT NUR POL AA CLASS II
3 7/30/2018 09:00 HRS Column 3S. 813-FW-013 RE INSTATEMENT INSPECTION RE INSTATEMENT NUR POL AA CLASS II
4 7/30/2018 09:00 HRS BWT 1S & 5S -- TANK CLOSE OUT INSPECTION TANK CLOSE NUR POL AA CLASS III
UPPER PART SS ONLY
5 7/30/2018 09:00 HRS Stbd Column 3 791-BI-047 RE INSTATEMENT INSPECTION RE INSTATEMENT NUR POL AA CLASS III
6 7/30/2018 09:00 HRS Column 3S To Pump Rm 1S & 2S. 791-BI-042 RE INSTATEMENT INSPECTION RE INSTATEMENT NUR POL AA CLASS III
8 7/30/2018 10:00 HRS Stb'd Column Fwd 1S EL 781-AV-072 RE INSTATEMENT INSPECTION RE INSTATEMENT NUR POL AA CLASS III
13.75m~37.5m(BWT7S).
10 7/30/2018 10 :00 HRS Column 3P. 792-BI-009 RE INSTATEMENT INSPECTION RE INSTATEMENT MAGESH/NARASIMHA AZAD AA CLASS III
11 7/30/2018 10 :00 HRS Thruster Room P2. 711-LO-003 LINE CHECK INSPECTION LINE CHECK MAGESH/NARASIMHA AZAD AA CLASS II
14 7/30/2018 14:00 HRS Thruster Rm 3S & 4S. 814-FW-015 HYDROTEST INSPECTION HYDROTEST NUR POL JVZ AA CLASS I
15 7/30/2018 11:00 HRS Thruster Rm 2P. 772-IA-024 N2 TEST INSPECTION N2 TEST MAGESH/NARASIMHA AZAD GS AA CLASS III
Column 1 P (EL13.75M~37.50M
17 7/30/2018 11:00 HRS ABL)(CCD1CP). 753-AV-014E FLUSHING INSPECTION FLUSHING MAGESH/NARASIMHA AZAD AA CLASS III
18 7/30/2018 11:00 HRS Column 1P To Thruster 1P. 813-FW-023 HYDROTEST INSPECTION HYDROTEST MAGESH/NARASIMHA AZAD GS AA CLASS II
19 7/30/2018 11:00 HRS Column 1P To Thruster 1P. 813-FW-023 FLUSHING INSPECTION FLUSHING MAGESH/NARASIMHA AZAD AA CLASS II
20 7/30/2018 14:00 HRS Column 3S To Pump Room 2S. 814-FW-014 FLUSHING INSPECTION FLUSHING NUR POL AA CLASS I
21 7/30/2018 09:30 HRS Thruster Room 1S. 722-SW-017 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE NUR POL AA CLASS III
22 7/30/2018 09:30 HRS Pump Room 1S. 726-SW-002 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE NUR POL AA CLASS III
23 7/30/2018 09:30 HRS Pump Room 2S. 782-SW-014 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE NUR POL AA CLASS III
24 7/30/2018 09:30 HRS Thruster Room 4S. 732-CW-015 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE NUR POL AA CLASS III
25 7/30/2018 09:30 HRS Thruster Room 4S. 732-CW-016 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE NUR POL AA CLASS III
27 7/30/2018 09:30 HRS Thruster Rm 1S. 793-SO-010 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE NUR POL AA CLASS III
29 7/30/2018 09:30 HRS Pump Room 2S To Column 3S 736-CW-027 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE NUR POL AA CLASS III
30 7/30/2018 09:30 HRS Pump Room 2S To Column 3S 736-CW-028 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE NUR POL AA CLASS III
31 7/30/2018 09:30 HRS Stb'd Column Aft 3S EL 773-UA-020 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE NUR POL AA CLASS III
13.75m~37.5m
33 7/30/2018 09:30 HRS Stb'd Column Fwd 1S EL 781-AV-075 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE NUR POL AA CLASS III
13.75m~37.5m(CBWT1ES).
40 7/30/2018 13:00 HRS Lower Dk. EL39m ABL To E/Rm. 1 734-CW-010 LINE CHECK INSPECTION LINE CHECK BALA SHAHIDUL CONTINUE CLASS III
& Aux Machinery Rm. 1A.
41 7/30/2018 13:00 HRS Engine Room 1 734-CW-012 LINE CHECK INSPECTION LINE CHECK BALA SHAHIDUL CONTINUE CLASS III
Lower Deck EL39m ABL To
42 7/30/2018 10:00 HRS Engine Room 1. 734-CW-011 LINE CHECK INSPECTION LINE CHECK BALA SHAHIDUL CONTINUE CLASS III
AA
43 7/30/2018 10:00 HRS Engine Room 1. 735-CW-010 RE INSTATEMENT INSPECTION RE INSTATEMENT BALA SHAHIDUL
ITR NOT SIGN
CLASS III
AA
44 7/30/2018 10:00 HRS Engine Room 1. 735-CW-012 RE INSTATEMENT INSPECTION RE INSTATEMENT BALA SHAHIDUL
ITR NOT SIGN
CLASS III
AA
45 7/30/2018 10:00 HRS Engine Room 1 734-CW-008D RE INSTATEMENT INSPECTION RE INSTATEMENT BALA SHAHIDUL
ITR NOT SIGN
CLASS III
46 7/30/2018 14:00 HRS Aux. Mach. Room 3B. 515-WC-027 FLUSHING INSPECTION FLUSHING VASAN PARVEZ AA CLASS III
CANCELED
47 7/30/2018 14:00 HRS Aux. Mach. Room 4B. 515-WC-036 HYDROTEST INSPECTION HYDROTEST VASAN PARVEZ PUNCH O/S CLASS III
48 7/30/2018 14:00 HRS Aux. Mach. Room 3B. 515-WC-026 LINE CHECK INSPECTION LINE CHECK VASAN PARVEZ AA CLASS III
ITR NOT SIGN
49 7/30/2018 10:00 HRS Engine Room 4. 711-SD-004 LINE CHECK INSPECTION LINE CHECK RAJA CANCELED CLASS II
NOT READY
50 7/30/2018 09:00 HRS Engine Room 3. 702-AV-016 LINE CHECK INSPECTION LINE CHECK REDDY SHAHIDUL AA CLASS II
52 7/30/2018 14:00 HRS Main Deck Near L223 At Centre. 711-SO-002 HYDROTEST INSPECTION HYDROTEST VASAN PARVEZ JVZ AA CLASS II
54 7/30/2018 14:00 HRS Main Deck Near L223 At Centre. 711-SO-002 FLUSHING INSPECTION FLUSHING VASAN PARVEZ AA CLASS II
55 7/30/2018 09:00 HRS Tween Dk. At SLING Store 814-FW-191 LINE CHECK INSPECTION LINE CHECK NARESH CANCELED CLASS I
(T205S). TEST PACK NOT RECEIVED FROM PF
56 7/30/2018 09:00 HRS Tween Dk. At LIR/LER Room 2 & 814-FW-193 LINE CHECK INSPECTION LINE CHECK NARESH REJECTED CLASS I
2A. NOT READY
57 7/30/2018 10:00 HRS Tween Dk. At Nitrogen Room 2 814-FW-194 LINE CHECK INSPECTION LINE CHECK NARESH REJECTED CLASS I
(T222S). NOT READY
58 7/30/2018 14:00 HRS Engine Room 1. 735-CW-008 LINE CHECK INSPECTION LINE CHECK BALA SHAHIDUL AA CLASS III
59 7/30/2018 10:00 HRS Engine Room 1 735-CW-002 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE BALA SHAHIDUL AA CLASS III
61 7/30/2018 09:30 HRS Upper Hull Fresh Water 735-AV-008 RE INSTATEMENT INSPECTION RE INSTATEMENT VASAN SHAHIDUL AA CLASS III
Expansion Tank 8 ITR NOT SIGN
62 7/30/2018 09:30 HRS Upper Hull Fresh Water 735-AV-009 RE INSTATEMENT INSPECTION RE INSTATEMENT VASAN SHAHIDUL AA CLASS III
Expansion Tank 9 ITR NOT SIGN
63 7/30/2018 09:30 HRS Stbd Column Aft 3. 791-BI-032 RE INSTATEMENT INSPECTION RE INSTATEMENT NUR POL REJECTED CLASS III
PUNCH NOT CLEAR
64 7/30/2018 09:30 HRS Column 3S To Gas Process Rm 4. 791-BI-053 RE INSTATEMENT INSPECTION RE INSTATEMENT NUR POL AA CLASS III
REJECTED
65 7/30/2018 09:30 HRS Mooring VFD Room 2. 791-BI-072 RE INSTATEMENT INSPECTION RE INSTATEMENT MORAN PARVEZ PUNCH NOT CLEAR,DUST & RUST CLASS III
CHOKED INSIDE THE PIPE
66 7/30/2018 09:30 HRS Gas Process Rm 2. 791-BI-093 RE INSTATEMENT INSPECTION RE INSTATEMENT MORAN PARVEZ AA CLASS III
67 7/30/2018 09:30 HRS Engine Room 2. 711-LO-071 RE INSTATEMENT INSPECTION RE INSTATEMENT RAJESH SHAHIDUL AA CLASS II
68 7/30/2018 14:00 HRS Engine Room 1 To Aux Mach 702-FO-016 LINE CHECK INSPECTION LINE CHECK BALA SHAHIDUL AA CLASS II
Room 1A.
70 7/30/2018 14:00 HRS Engine Room 1. 711-LO-053 LINE CHECK INSPECTION LINE CHECK BALA SHAHIDUL AA CLASS II
CANCELED
71 7/30/2018 14:00 HRS Engine Room 1 To Funnel. 711-AV-006 LINE CHECK INSPECTION LINE CHECK BALA NOT READY CLASS II
72 7/30/2018 11:00 HRS Lower Deck To Tween Deck. 588-UW-012 RE INSTATEMENT INSPECTION RE INSTATEMENT MORAN PARVEZ REJECTED CLASS II
NOT READY
73 7/30/2018 11:00 HRS Fresh Water Rm To Lower Deck. 588-UW-007 RE INSTATEMENT INSPECTION RE INSTATEMENT MORAN PARVEZ AA ALREADY CLASS II
74 7/30/2018 09:30 HRS Fresh Water Room 585-SW-007 RE INSTATEMENT INSPECTION RE INSTATEMENT MORAN PARVEZ REJECTED CLASS II
PUNCH NOT CLEAR
75 7/30/2018 09:30 HRS Main Deck Near L327 At Centre. 711-SO-004 HYDROTEST INSPECTION HYDROTEST VASAN AA CLASS II
76 7/30/2018 09:30 HRS Main Deck Near L327 At Centre. 711-SO-004 FLUSHING INSPECTION FLUSHING VASAN AA CLASS II
77 7/30/2018 14:00 HRS Aux Mach Room 1A To Upper 702-AV-007 HOT OIL FLUSHING INSPECTION HOT OIL FLUSHING DINESH CHONG AA CLASS II
Hull.
78 7/30/2018 14:00 HRS Engine Room 1 To Main Deck. 711-AV-001 HOT OIL FLUSHING INSPECTION HOT OIL FLUSHING DINESH CHONG AA CLASS II
79 7/30/2018 14:00 HRS Engine Room 4 To Main Deck. 711-AV-004 HOT OIL FLUSHING INSPECTION HOT OIL FLUSHING DINESH CHONG AA CLASS II
80 7/30/2018 10:00 HRS Engine Room 4 To Aux Mach 702-FO-072 CC VISUAL INSPECTION CC VISUAL DINESH CHONG AA CLASS II
Room 4A.
81 7/30/2018 10:00 HRS Engine Room 4 To Aux Mach 702-FO-073 CC VISUAL INSPECTION CC VISUAL DINESH CHONG AA CLASS II
Room 4A.
83 7/30/2018 10:00 HRS Separator Rm 4 To Aux Mach 702-FO-077 CC VISUAL INSPECTION CC VISUAL DINESH CHONG AA CLASS II
Room 4A.
85 7/30/2018 10:00 HRS Engine Room 3. 814-FW-061 FLUSHING INSPECTION FLUSHING NARESH PEPE AA CLASS I
87 7/30/2018 09:30 HRS Engine Room 2. 711-LO-066 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE RAJESH SHAHIDUL AA CLASS II
88 7/30/2018 09:30 HRS Engine Room 2. 711-LO-067 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE RAJESH SHAHIDUL AA CLASS II
89 7/30/2018 09:30 HRS Engine Room 2. 711-LO-067A PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE RAJESH SHAHIDUL AA CLASS II
90 7/30/2018 09:30 HRS Engine Room 2. 711-LO-068 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE RAJESH SHAHIDUL AA CLASS II
91 7/30/2018 09:30 HRS Engine Room 2. 711-LO-072 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE RAJESH SHAHIDUL AA CLASS II
701-02-100-NG-858-AS13-NI (BE01,02,03,04,05)
96 7/30/2018 18:30 HRS ER #2 1119-LT-DW-0056 701-02-100-NG-859-AS13-NI (BE01,02,03,3.1) N2 TEST SANAUL CANCELED CLASS I
NOT READY
TEST PRESSURE :- 27.6 BAR
97 7/30/2018 10:00 HRS Gas Process Room 1 At Port Fwd. 701-CW-009 LINE CHECK INSPECTION LINE CHECK HELAL ROY AA CLASS II
98 7/30/2018 11:00 HRS M/Dk. Stbd Aft(C4S) To 753-AV-023 LINE CHECK INSPECTION LINE CHECK MORAN AA CLASS III
EL37.30M ABL(SC THR4S).
99 7/30/2018 14:00 HRS Gas Process Room 1 At Port Fwd. 701-CW-028 HYDROTEST INSPECTION HYDROTEST HELAL ROY GS AA CLASS II
100 7/30/2018 14:00 HRS Gas Process Room 1 At Port Fwd. 701-CW-027 HYDROTEST INSPECTION HYDROTEST HELAL ROY GS AA CLASS II
HOT WORK
104 7/30/2018 9.00HRS CBWT-1HP 1119-TS-0078 HOT WORK CLEARANCE CARLING INSPECTION CLEARANCE MAGESH AA CLASS III
109 7/30/2018 9.00HRS ER01 PQA-S-011 EXHAUST PIPE SUPPORT INSPECTION EXHAUST PIPE SUPPORT HELAL PARVEZ AA CLASS III
INSPECTION
COLUMN 4S
134 7/30/2018 10.45HRS (CDT-4S) VACUUM-333 VACUUM TEST INSPECTION VACUUM TEST NAZMUL POL AA CLASS III
135 7/30/2018 10.45HRS COLUMN 4S VACUUM-334 VACUUM TEST INSPECTION VACUUM TEST NAZMUL POL AA CLASS III
(CDBTWT-4JS)
136 7/30/2018 11.00HRS _ RT RT FILM REVIEW RT REVIEW SHAKTI LR
QTY 50 JOINTS
PARTIAL REINSTATEMENT INSPECTION
JSPL-PCU-180726-1200 LQ01-515-00-080-WC-229-AF11-CC CANCELED
1 7/30/2018 16:00 HRS LQ 01 515-WC-045 LQ01-515-00-150-WC-310-AF11-CC PARTIAL RE INSTATEMENT SURESH MIZAN NOT READY CLASS III
PARTIAL REINSTATEMENT INSPECTION
LQ03-515-00-080-WC-178-AF11-CC
LQ01-515-00-015-AV-651-ES21-NI
JSPL-PCU-180726-1208 LQ01-515-00-015-AV-652-ES21-NI CANCELED
2 7/30/2018 16:00 HRS LQ 01.003 515-WC-046 LQ01-515-00-080-WC-227-AF11-CC PARTIAL RE INSTATEMENT SURESH MIZAN NOT READY CLASS III
LQ01-515-00-080-WC-228-AF11-CC
LQ03-515-00-080-WC-176-AF11-CC
JSPL-PCU-180727-1209 PARTIAL REINSTATEMENT INSPECTION
LQ03-515-00-080-WC-177-AF11-CC CANCELED
3 7/30/2018 16:00 HRS LQ 01
515-WC-053
LQ01-515-00-015-AV-446-ES21-NI PARTIAL RE INSTATEMENT SURESH MIZAN
NOT READY
CLASS III
LQ01-515-00-050-WC-226-AF11-CC
PARTIAL REINSTATEMENT INSPECTION
JSPL-PCU-180727-1210 LQ01-515-00-015-AV-649-ES21-NI CANCELED
4 7/30/2018 16:00 HRS LQ 01
515-WC-054 LQ01-515-00-050-WC-224-AF11-CC
PARTIAL RE INSTATEMENT SURESH MIZAN
NOT READY
CLASS III
LQ01-515-00-050-WC-225-AC11-CC
JSPL-PCU-180728-1216 PARTIAL REINSTATEMENT INSPECTION CANCELED
5 7/30/2018 16:00 HRS LQ 01 814-FW-044 LQ01-814-00-025-FW-454-IS13-NI PARTIAL RE INSTATEMENT SURESH MIZAN NOT READY CLASS I
6 7/30/2018 16:00 HRS LQ 01 JSPL-PCU-180726-1207 PARTIAL REINSTATEMENT INSPECTION PARTIAL RE INSTATEMENT SURESH MIZAN CANCELED CLASS I
814-FW-246 PARTIAL REINSTATEMENT INSPECTION
LQ01-814-00-025-FW-123-IS13-NI NOT READY
LQ01-740-00-025-HM-290-AC11-HC
LQ01-740-00-025-HM-340-AC11-HC
7 7/30/2018 16:00 HRS LQ 01.002 JSPL-PCU-180729-1221 LQ01-740-00-025-HM-388-AC11-HC PARTIAL RE INSTATEMENT SURESH MIZAN CANCELED CLASS III
740-HM-037 LQ01-740-00-065-HM-240-AC11-HC NOT READY
PARTIAL REINSTATEMENT INSPECTION
LQ02-740-00-025-HM-344-AC11-HC
LQ01-740-00-015-HM-341-AC11-HC
LQ02-740-00-025-HM-392-AC11-HC
JSPL-PCU-180729-1222 LQ01-740-00-025-HM-291-AC11-HC
LQ02-740-00-025-HM-422-AC11-HC CANCELED
8 7/30/2018 16:00 HRS LQ 01.002 PARTIAL RE INSTATEMENT SURESH MIZAN CLASS III
740-HM-038 LQ01-740-00-050-HM-389-AC11-HC NOT READY
LQ02-740-00-025-HM-345-AC11-HC
LQ02-740-00-025-HM-393-AC11-HC
LQ04-813-00-100-FW-367-AG13-NI
9 7/30/2018 10:00 HRS LQ 04 - PF CODE 8222-LQ04-SP14 SPL TEST ISLAM MIZAN CANCELED CLASS III
NOT READY
2 SPL
10 7/30/2018 10:00 HRS LQ 1ST Dk.(Pipe Trunk TA81 LQ- 772-IA-077 RE INSTATEMENT INSPECTION RE INSTATEMENT SURESH MIZAN CANCELED CLASS III
1ST Accom. Deck). NOT READY
12 7/30/2018 10:00 HRS LQ 1ST Dk.(Pipe Trunk LA82 At 772-IA-090 FLUSHING INSPECTION FLUSHING SURESH MIZAN CANCELED CLASS III
LQ-1ST Deck). NOT READY
CANCELED
13 7/30/2018 10:00 HRS 1ST Accom. Deck. 813-FW-051 RE INSTATEMENT INSPECTION RE INSTATEMENT SURESH MIZAN NOT READY CLASS II
14 7/30/2018 11:00 HRS 2ND Accom, Deck. 813-FW-053 HYDROTEST INSPECTION HYDROTEST SURESH MIZAN GS AA CLASS II
15 7/30/2018 11:00 HRS 2ND Accom, Deck. 813-FW-053 FLUSHING INSPECTION FLUSHING SURESH MIZAN GS AA CLASS II
16 7/30/2018 11:00 HRS 1ST To 2ND Accommodation At 814-FW-249 LINE CHECK INSPECTION LINE CHECK SURESH MIZAN CANCELED CLASS II=
S6 & S7. NOT READY