DAILY INSPECTION SUMMARY (11-1119)

RFI No: Pipe ITR/RFI Sign off


S/N Date Time Location Description Type of Inspection Name of Inspector / Engineer Owner LR Status
/ Package No: Class HOS/LR Status

1 7/30/2018 10 :00 HRS Pump Room 2P To Column 3P. 813-FW-021 RE INSTATEMENT INSPECTION RE INSTATEMENT MAGESH/NARASIMHA AZAD AA CLASS II

2 7/30/2018 09:00 HRS Pump Room 1S. 813-FW-005 RE INSTATEMENT INSPECTION RE INSTATEMENT NUR POL AA CLASS II

3 7/30/2018 09:00 HRS Column 3S. 813-FW-013 RE INSTATEMENT INSPECTION RE INSTATEMENT NUR POL AA CLASS II

4 7/30/2018 09:00 HRS BWT 1S & 5S -- TANK CLOSE OUT INSPECTION TANK CLOSE NUR POL AA CLASS III
UPPER PART SS ONLY

5 7/30/2018 09:00 HRS Stbd Column 3 791-BI-047 RE INSTATEMENT INSPECTION RE INSTATEMENT NUR POL AA CLASS III

6 7/30/2018 09:00 HRS Column 3S To Pump Rm 1S & 2S. 791-BI-042 RE INSTATEMENT INSPECTION RE INSTATEMENT NUR POL AA CLASS III

Stb'd Column Fwd 1S EL


7 7/30/2018 09:00 HRS 13.75m~37.5m(BWT4S). 781-AV-069 RE INSTATEMENT INSPECTION RE INSTATEMENT NUR POL AA CLASS III

8 7/30/2018 10:00 HRS Stb'd Column Fwd 1S EL 781-AV-072 RE INSTATEMENT INSPECTION RE INSTATEMENT NUR POL AA CLASS III
13.75m~37.5m(BWT7S).

Stb'd Column Fwd 1S EL


9 7/30/2018 10:00 HRS 781-AV-073 RE INSTATEMENT INSPECTION RE INSTATEMENT NUR POL AA CLASS III
13.75m~37.5m(BWT8S).

10 7/30/2018 10 :00 HRS Column 3P. 792-BI-009 RE INSTATEMENT INSPECTION RE INSTATEMENT MAGESH/NARASIMHA AZAD AA CLASS III

11 7/30/2018 10 :00 HRS Thruster Room P2. 711-LO-003 LINE CHECK INSPECTION LINE CHECK MAGESH/NARASIMHA AZAD AA CLASS II

Column 3S To Holding Drain Tk.


12 7/30/2018 10:00 HRS 1S. 740-HM-020 HYDROTEST INSPECTION HYDROTEST NUR POL GS AA CLASS III

Column 3S To Holding Drain Tk. CANCELED


13 7/30/2018 10:00 HRS 740-HM-020 FLUSHING INSPECTION FLUSHING NUR POL CLASS III
1S. (PREPARATION NOT ACC BY HOS)

14 7/30/2018 14:00 HRS Thruster Rm 3S & 4S. 814-FW-015 HYDROTEST INSPECTION HYDROTEST NUR POL JVZ AA CLASS I

15 7/30/2018 11:00 HRS Thruster Rm 2P. 772-IA-024 N2 TEST INSPECTION N2 TEST MAGESH/NARASIMHA AZAD GS AA CLASS III

16 7/30/2018 11:00 HRS Pump Room 1/2P To Pipe Tunnel


Mid & Column 3P. 761-OD-009 RE INSTATEMENT INSPECTION RE INSTATEMENT MAGESH/NARASIMHA AZAD AA CLASS III

Column 1 P (EL13.75M~37.50M
17 7/30/2018 11:00 HRS ABL)(CCD1CP). 753-AV-014E FLUSHING INSPECTION FLUSHING MAGESH/NARASIMHA AZAD AA CLASS III

18 7/30/2018 11:00 HRS Column 1P To Thruster 1P. 813-FW-023 HYDROTEST INSPECTION HYDROTEST MAGESH/NARASIMHA AZAD GS AA CLASS II

19 7/30/2018 11:00 HRS Column 1P To Thruster 1P. 813-FW-023 FLUSHING INSPECTION FLUSHING MAGESH/NARASIMHA AZAD AA CLASS II
20 7/30/2018 14:00 HRS Column 3S To Pump Room 2S. 814-FW-014 FLUSHING INSPECTION FLUSHING NUR POL AA CLASS I

21 7/30/2018 09:30 HRS Thruster Room 1S. 722-SW-017 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE NUR POL AA CLASS III

22 7/30/2018 09:30 HRS Pump Room 1S. 726-SW-002 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE NUR POL AA CLASS III

23 7/30/2018 09:30 HRS Pump Room 2S. 782-SW-014 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE NUR POL AA CLASS III

24 7/30/2018 09:30 HRS Thruster Room 4S. 732-CW-015 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE NUR POL AA CLASS III

25 7/30/2018 09:30 HRS Thruster Room 4S. 732-CW-016 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE NUR POL AA CLASS III

Pump Room 1S To Thruster Rm


26 7/30/2018 09:30 HRS 813-FW-013A PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE NUR POL AA CLASS II
2S.

27 7/30/2018 09:30 HRS Thruster Rm 1S. 793-SO-010 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE NUR POL AA CLASS III

Column 2S To Urea Strorage


28 7/30/2018 09:30 HRS Tank 1S. 740-HM-017 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE NUR POL AA CLASS III

29 7/30/2018 09:30 HRS Pump Room 2S To Column 3S 736-CW-027 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE NUR POL AA CLASS III

30 7/30/2018 09:30 HRS Pump Room 2S To Column 3S 736-CW-028 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE NUR POL AA CLASS III

31 7/30/2018 09:30 HRS Stb'd Column Aft 3S EL 773-UA-020 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE NUR POL AA CLASS III
13.75m~37.5m

32 7/30/2018 09:30 HRS Lower Deck To Column 3S & Pipe


Tunnel Mid S. 772-IA-035 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE NUR POL AA CLASS III

33 7/30/2018 09:30 HRS Stb'd Column Fwd 1S EL 781-AV-075 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE NUR POL AA CLASS III
13.75m~37.5m(CBWT1ES).

Lower Deck EL39m ABL To


34 7/30/2018 09:00 HRS
E/Rm.1 & Aux Machinery Rm.
734-CW-002 LINE CHECK INSPECTION LINE CHECK BALA SHAHIDUL CONTINUE CLASS III

Lower Deck EL39m ABL To


35 7/30/2018 10:00 HRS
Engine Room 1.
734-CW-003 LINE CHECK INSPECTION LINE CHECK BALA SHAHIDUL CONTINUE CLASS III

Engine Room 1 To Aux


36 7/30/2018 10:00 HRS
Machinery Room.
734-CW-004 LINE CHECK INSPECTION LINE CHECK BALA SHAHIDUL CONTINUE CLASS III

Lower Dk. EL39m ABL To E/Rm.1


37 7/30/2018 10:00 HRS & Aux Machinery Rm. 1A. 734-CW-006 LINE CHECK INSPECTION LINE CHECK BALA SHAHIDUL CONTINUE CLASS III

Lower Deck EL39m ABL To


38 7/30/2018 10:00 HRS Engine Room 1. 734-CW-007 LINE CHECK INSPECTION LINE CHECK BALA SHAHIDUL CONTINUE CLASS III

Engine Room 1 To Aux


39 7/30/2018 10:00 HRS Machinery Room 1A. 734-CW-008 LINE CHECK INSPECTION LINE CHECK BALA SHAHIDUL CONTINUE CLASS III

40 7/30/2018 13:00 HRS Lower Dk. EL39m ABL To E/Rm. 1 734-CW-010 LINE CHECK INSPECTION LINE CHECK BALA SHAHIDUL CONTINUE CLASS III
& Aux Machinery Rm. 1A.

41 7/30/2018 13:00 HRS Engine Room 1 734-CW-012 LINE CHECK INSPECTION LINE CHECK BALA SHAHIDUL CONTINUE CLASS III
Lower Deck EL39m ABL To
42 7/30/2018 10:00 HRS Engine Room 1. 734-CW-011 LINE CHECK INSPECTION LINE CHECK BALA SHAHIDUL CONTINUE CLASS III

AA
43 7/30/2018 10:00 HRS Engine Room 1. 735-CW-010 RE INSTATEMENT INSPECTION RE INSTATEMENT BALA SHAHIDUL
ITR NOT SIGN
CLASS III

AA
44 7/30/2018 10:00 HRS Engine Room 1. 735-CW-012 RE INSTATEMENT INSPECTION RE INSTATEMENT BALA SHAHIDUL
ITR NOT SIGN
CLASS III

AA
45 7/30/2018 10:00 HRS Engine Room 1 734-CW-008D RE INSTATEMENT INSPECTION RE INSTATEMENT BALA SHAHIDUL
ITR NOT SIGN
CLASS III

46 7/30/2018 14:00 HRS Aux. Mach. Room 3B. 515-WC-027 FLUSHING INSPECTION FLUSHING VASAN PARVEZ AA CLASS III

CANCELED
47 7/30/2018 14:00 HRS Aux. Mach. Room 4B. 515-WC-036 HYDROTEST INSPECTION HYDROTEST VASAN PARVEZ PUNCH O/S CLASS III

48 7/30/2018 14:00 HRS Aux. Mach. Room 3B. 515-WC-026 LINE CHECK INSPECTION LINE CHECK VASAN PARVEZ AA CLASS III
ITR NOT SIGN

49 7/30/2018 10:00 HRS Engine Room 4. 711-SD-004 LINE CHECK INSPECTION LINE CHECK RAJA CANCELED CLASS II
NOT READY

50 7/30/2018 09:00 HRS Engine Room 3. 702-AV-016 LINE CHECK INSPECTION LINE CHECK REDDY SHAHIDUL AA CLASS II

Main Deck Near L217P At Port


51 7/30/2018 14:00 HRS 711-SO-001 HYDROTEST INSPECTION HYDROTEST VASAN PARVEZ JVZ AA CLASS II
Side.

52 7/30/2018 14:00 HRS Main Deck Near L223 At Centre. 711-SO-002 HYDROTEST INSPECTION HYDROTEST VASAN PARVEZ JVZ AA CLASS II

Main Deck Near L217P At Port


53 7/30/2018 14:00 HRS Side. 711-SO-001 FLUSHING INSPECTION FLUSHING VASAN PARVEZ AA CLASS II

54 7/30/2018 14:00 HRS Main Deck Near L223 At Centre. 711-SO-002 FLUSHING INSPECTION FLUSHING VASAN PARVEZ AA CLASS II

55 7/30/2018 09:00 HRS Tween Dk. At SLING Store 814-FW-191 LINE CHECK INSPECTION LINE CHECK NARESH CANCELED CLASS I
(T205S). TEST PACK NOT RECEIVED FROM PF

56 7/30/2018 09:00 HRS Tween Dk. At LIR/LER Room 2 & 814-FW-193 LINE CHECK INSPECTION LINE CHECK NARESH REJECTED CLASS I
2A. NOT READY

57 7/30/2018 10:00 HRS Tween Dk. At Nitrogen Room 2 814-FW-194 LINE CHECK INSPECTION LINE CHECK NARESH REJECTED CLASS I
(T222S). NOT READY

58 7/30/2018 14:00 HRS Engine Room 1. 735-CW-008 LINE CHECK INSPECTION LINE CHECK BALA SHAHIDUL AA CLASS III

59 7/30/2018 10:00 HRS Engine Room 1 735-CW-002 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE BALA SHAHIDUL AA CLASS III

Upper Hull Fresh Water AA


60 7/30/2018 09:30 HRS Expansion Tank 7 735-AV-007 RE INSTATEMENT INSPECTION RE INSTATEMENT VASAN SHAHIDUL ITR NOT SIGN CLASS III

61 7/30/2018 09:30 HRS Upper Hull Fresh Water 735-AV-008 RE INSTATEMENT INSPECTION RE INSTATEMENT VASAN SHAHIDUL AA CLASS III
Expansion Tank 8 ITR NOT SIGN

62 7/30/2018 09:30 HRS Upper Hull Fresh Water 735-AV-009 RE INSTATEMENT INSPECTION RE INSTATEMENT VASAN SHAHIDUL AA CLASS III
Expansion Tank 9 ITR NOT SIGN

63 7/30/2018 09:30 HRS Stbd Column Aft 3. 791-BI-032 RE INSTATEMENT INSPECTION RE INSTATEMENT NUR POL REJECTED CLASS III
PUNCH NOT CLEAR

64 7/30/2018 09:30 HRS Column 3S To Gas Process Rm 4. 791-BI-053 RE INSTATEMENT INSPECTION RE INSTATEMENT NUR POL AA CLASS III

REJECTED
65 7/30/2018 09:30 HRS Mooring VFD Room 2. 791-BI-072 RE INSTATEMENT INSPECTION RE INSTATEMENT MORAN PARVEZ PUNCH NOT CLEAR,DUST & RUST CLASS III
CHOKED INSIDE THE PIPE
66 7/30/2018 09:30 HRS Gas Process Rm 2. 791-BI-093 RE INSTATEMENT INSPECTION RE INSTATEMENT MORAN PARVEZ AA CLASS III

67 7/30/2018 09:30 HRS Engine Room 2. 711-LO-071 RE INSTATEMENT INSPECTION RE INSTATEMENT RAJESH SHAHIDUL AA CLASS II

68 7/30/2018 14:00 HRS Engine Room 1 To Aux Mach 702-FO-016 LINE CHECK INSPECTION LINE CHECK BALA SHAHIDUL AA CLASS II
Room 1A.

Engine Room 1 To Aux Mach


69 7/30/2018 14:00 HRS 702-FO-017 LINE CHECK INSPECTION LINE CHECK BALA SHAHIDUL AA CLASS II
Room 1A.

70 7/30/2018 14:00 HRS Engine Room 1. 711-LO-053 LINE CHECK INSPECTION LINE CHECK BALA SHAHIDUL AA CLASS II

CANCELED
71 7/30/2018 14:00 HRS Engine Room 1 To Funnel. 711-AV-006 LINE CHECK INSPECTION LINE CHECK BALA NOT READY CLASS II

72 7/30/2018 11:00 HRS Lower Deck To Tween Deck. 588-UW-012 RE INSTATEMENT INSPECTION RE INSTATEMENT MORAN PARVEZ REJECTED CLASS II
NOT READY

73 7/30/2018 11:00 HRS Fresh Water Rm To Lower Deck. 588-UW-007 RE INSTATEMENT INSPECTION RE INSTATEMENT MORAN PARVEZ AA ALREADY CLASS II

74 7/30/2018 09:30 HRS Fresh Water Room 585-SW-007 RE INSTATEMENT INSPECTION RE INSTATEMENT MORAN PARVEZ REJECTED CLASS II
PUNCH NOT CLEAR

75 7/30/2018 09:30 HRS Main Deck Near L327 At Centre. 711-SO-004 HYDROTEST INSPECTION HYDROTEST VASAN AA CLASS II

76 7/30/2018 09:30 HRS Main Deck Near L327 At Centre. 711-SO-004 FLUSHING INSPECTION FLUSHING VASAN AA CLASS II

77 7/30/2018 14:00 HRS Aux Mach Room 1A To Upper 702-AV-007 HOT OIL FLUSHING INSPECTION HOT OIL FLUSHING DINESH CHONG AA CLASS II
Hull.

78 7/30/2018 14:00 HRS Engine Room 1 To Main Deck. 711-AV-001 HOT OIL FLUSHING INSPECTION HOT OIL FLUSHING DINESH CHONG AA CLASS II

79 7/30/2018 14:00 HRS Engine Room 4 To Main Deck. 711-AV-004 HOT OIL FLUSHING INSPECTION HOT OIL FLUSHING DINESH CHONG AA CLASS II

80 7/30/2018 10:00 HRS Engine Room 4 To Aux Mach 702-FO-072 CC VISUAL INSPECTION CC VISUAL DINESH CHONG AA CLASS II
Room 4A.

81 7/30/2018 10:00 HRS Engine Room 4 To Aux Mach 702-FO-073 CC VISUAL INSPECTION CC VISUAL DINESH CHONG AA CLASS II
Room 4A.

Engine Room 4 To Aux Mach


82 7/30/2018 10:00 HRS 702-FO-074 CC VISUAL INSPECTION CC VISUAL DINESH CHONG AA CLASS II
Room 4A.

83 7/30/2018 10:00 HRS Separator Rm 4 To Aux Mach 702-FO-077 CC VISUAL INSPECTION CC VISUAL DINESH CHONG AA CLASS II
Room 4A.

Main Deck ER3 L322P CANCELED


84 7/30/2018 09:00 HRS @El.60.93M. 772-IA-053 LINE CHECK INSPECTION LINE CHECK REDDY NOT READY CLASS II

85 7/30/2018 10:00 HRS Engine Room 3. 814-FW-061 FLUSHING INSPECTION FLUSHING NARESH PEPE AA CLASS I

86 7/30/2018 10:00 HRS Engine RoomRoom.


3 To Casing Engine 814-FW-062 FLUSHING INSPECTION FLUSHING NARESH PEPE AA CLASS I

87 7/30/2018 09:30 HRS Engine Room 2. 711-LO-066 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE RAJESH SHAHIDUL AA CLASS II

88 7/30/2018 09:30 HRS Engine Room 2. 711-LO-067 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE RAJESH SHAHIDUL AA CLASS II

89 7/30/2018 09:30 HRS Engine Room 2. 711-LO-067A PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE RAJESH SHAHIDUL AA CLASS II
90 7/30/2018 09:30 HRS Engine Room 2. 711-LO-068 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE RAJESH SHAHIDUL AA CLASS II

91 7/30/2018 09:30 HRS Engine Room 2. 711-LO-072 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE RAJESH SHAHIDUL AA CLASS II

JSPL-PCU-180728-1217 PARTIAL HYDROTEST INSPECTION


92 7/30/2018 11:00 HRS ER 02 ER02-793-20-050-SO-373-AC11-NI-B PARTIAL HYDROTEST RAJESH SHAHIDUL AA CLASS III
793-SO-031
ER02-793-20-050-SO-374-AC11-NI

JSPL-PCU-180728-1218 PARTIAL FLUSHING INSPECTION CANCELED


93 7/30/2018 11:00 HRS ER 02 ER02-793-20-050-SO-373-AC11-NI-B PARTIAL FLUSHING RAJESH SHAHIDUL CLASS III
793-SO-031 ER02-793-20-050-SO-374-AC11-NI NOT READY

JSPL-PCU-180728-1219 PARTIAL HYDROTEST INSPECTION


94 7/30/2018 11:00 HRS ER 02 PARTIAL HYDROTEST RAJESH SHAHIDUL AA CLASS III
793-SO-030 ER02-793-20-025-SO-003-AC11-NI-A

JSPL-PCU-180728-1220 PARTIAL FLUSHING INSPECTION CANCELED


95 7/30/2018 11:00 HRS ER 02 793-SO-030 ER02-793-20-025-SO-003-AC11-NI-A PARTIAL FLUSHING RAJESH SHAHIDUL NOT READY CLASS III

701-02-100-NG-858-AS13-NI (BE01,02,03,04,05)
96 7/30/2018 18:30 HRS ER #2 1119-LT-DW-0056 701-02-100-NG-859-AS13-NI (BE01,02,03,3.1) N2 TEST SANAUL CANCELED CLASS I
NOT READY
TEST PRESSURE :- 27.6 BAR

97 7/30/2018 10:00 HRS Gas Process Room 1 At Port Fwd. 701-CW-009 LINE CHECK INSPECTION LINE CHECK HELAL ROY AA CLASS II

98 7/30/2018 11:00 HRS M/Dk. Stbd Aft(C4S) To 753-AV-023 LINE CHECK INSPECTION LINE CHECK MORAN AA CLASS III
EL37.30M ABL(SC THR4S).

99 7/30/2018 14:00 HRS Gas Process Room 1 At Port Fwd. 701-CW-028 HYDROTEST INSPECTION HYDROTEST HELAL ROY GS AA CLASS II

100 7/30/2018 14:00 HRS Gas Process Room 1 At Port Fwd. 701-CW-027 HYDROTEST INSPECTION HYDROTEST HELAL ROY GS AA CLASS II

M/Dk. Port Aft(C4P) To


101 7/30/2018 11:00 HRS 753-AV-019 PUNCH CLEARANCE INSPECTION PUNCH CLEARANCE MORAN PARVEZ AA CLASS III
EL37.50M ABL(SC THR4P).

Port Column Aft 4P EL


102 7/30/2018 11:00 HRS 37.5m~44.7m To 781-AV-141 FLUSHING INSPECTION FLUSHING MORAN PARVEZ AA CLASS III
M/Dk(CDBWT4BP).
Port Column Aft 4P EL
103 7/30/2018 11:00 HRS 37.5m~44.7m To 781-AV-140 FLUSHING INSPECTION FLUSHING MORAN PARVEZ AA CLASS III
M/Dk(CDBWT4AP).

HOT WORK
104 7/30/2018 9.00HRS CBWT-1HP 1119-TS-0078 HOT WORK CLEARANCE CARLING INSPECTION CLEARANCE MAGESH AA CLASS III

PIPING FITUP INSPECTION


105 7/30/2018 9.00HRS GPR1 PFU-18651 SYSTEM: 701 FITUP HELAL ROY AA CLASS I
QTY:3JOINTS
PIPING VISUAL INSPECTION
106 7/30/2018 9.00HRS PIPE-05 PVI-14750 SYSTEM: 701 VISUAL HELAL ROY AA CLASS III
QTY 6JOINTS
PIPING VISUAL INSPECTION
107 7/30/2018 9.00HRS GPR1 PVI-14716 SYSTEM: 701 VISUAL HELAL ROY GS AA CLASS I
QTY 17JOINTS
PIPING FITUP INSPECTION
108 7/30/2018 9.00HRS HYDRAULIC WORK SHOP PFU-18670 SYSTEM: 701(DW) FITUP HELAL ROY AA CLASS I
QTY:2JOINTS

109 7/30/2018 9.00HRS ER01 PQA-S-011 EXHAUST PIPE SUPPORT INSPECTION EXHAUST PIPE SUPPORT HELAL PARVEZ AA CLASS III
INSPECTION

PIPING VISUAL INSPECTION


110 7/30/2018 14.30HRS ER01 PVI-14753 SYSTEM: 771 VISUAL NATHAN CHONG JVZ AA CLASS II
QTY 4JOINTS
PIPING FITUP INSPECTION
111 7/30/2018 14.30HRS ER01 PFU-18659 SYSTEM: 771 FITUP NATHAN CHONG AA CLASS II
QTY:4JOINTS
PIPING FITUP INSPECTION
112 7/30/2018 14.30HRS ER01 PFU-18650 SYSTEM: 771 FITUP NATHAN CHONG AA CLASS II
QTY:8JOINTS
PIPING FITUP INSPECTION
113 7/30/2018 14.30HRS H14 BLOCK PFU-18649 SYSTEM: 814 FITUP NATHAN CHONG AA CLASS I
QTY:7JOINTS
PIPING VISUAL INSPECTION
114 7/30/2018 14.30HRS H14 BLOCK PVI-14342 SYSTEM: 461 VISUAL NATHAN CHONG JVZ AA CLASS I
QTY 24JOINTS
PIPING VISUAL INSPECTION
115 7/30/2018 14.30HRS H14/H15 BLOCK PVI-14602 SYSTEM: 593 VISUAL NATHAN CHONG AA CLASS III
QTY 10JOINTS
PIPING VISUAL INSPECTION
116 7/30/2018 14.30HRS H02T CORRIDOR YST6 PVI-14725 SYSTEM: 814 VISUAL NATHAN CHONG JVZ AA CLASS I
QTY 6JOINTS
PIPING VISUAL INSPECTION
117 7/30/2018 14.30HRS H02L CORRIDOR YST6 PVI-14777 SYSTEM: 814 VISUAL NATHAN CHONG JVZ AA CLASS I
QTY 1JOINTS
PIPING VISUAL INSPECTION
118 7/30/2018 14.30HRS H01T CORRIDOR YST6 PVI-14757 SYSTEM: 814 VISUAL NATHAN CHONG JVZ AA CLASS I
QTY 3JOINTS
PIPING FITUP INSPECTION
119 7/30/2018 14.30HRS AUX MACH RM 1B PFU-18635 SYSTEM: 515 FITUP NATHAN CHONG AA CLASS III
QTY:8JOINTS
PIPING VISUAL INSPECTION
120 7/30/2018 10.45HRS ER04 PVI-14596 SYSTEM: 711 VISUAL SIVAMANI PEPE GS AA CLASS II
QTY 3JOINTS
PIPING VISUAL INSPECTION
121 7/30/2018 10.45HRS AUX MACH RM 3A PVI-12838 SYSTEM: 773 VISUAL SIVAMANI PEPE AA CLASS III
QTY 15JOINTS
PIPING VISUAL INSPECTION
122 7/30/2018 10.45HRS SEPARETOR ROOM 3 PVI-14701 SYSTEM: 711 VISUAL SIVAMANI PEPE GS AA CLASS II
QTY 10JOINTS
PIPING FITUP INSPECTION
123 7/30/2018 10.45HRS CORRIDOR LOWER DECK PFU-18644 SYSTEM: 740 FITUP SIVAMANI PEPE AA CLASS II
QTY:8JOINTS
PIPING VISUAL INSPECTION
124 7/30/2018 10.45HRS H06T ON BOARD PVI-14702 SYSTEM: 740 VISUAL SIVAMANI PEPE GS AA CLASS II
QTY 37JOINTS
PIPING VISUAL INSPECTION
125 7/30/2018 10.45HRS H06T ON BOARD PVI-14703 SYSTEM: 740 VISUAL SIVAMANI PEPE GS AA CLASS II
QTY 11JOINTS
PIPING VISUAL INSPECTION
126 7/30/2018 10.45HRS SEPARATOR ROOM 3A PVI-14561 SYSTEM: 773 VISUAL SIVAMANI PEPE AA CLASS III
QTY 9JOINTS

H06L CORRIDOR LOWER PIPING VISUAL INSPECTION


127 7/30/2018 10.45HRS DECK PVI-14764 SYSTEM: 731 VISUAL SIVAMANI PEPE AA CLASS III
QTY 4JOINTS
PIPING FITUP INSPECTION
128 7/30/2018 10.45HRS ER04 PFU-18631 SYSTEM: 734 FITUP SIVAMANI PEPE AA CLASS III
QTY:3JOINTS
PIPING VISUAL INSPECTION
129 7/30/2018 10.45HRS ER04 PVI-14680 SYSTEM: 814 VISUAL SIVAMANI PARVEZ AA CLASS I
QTY 8JOINTS
PIPING VISUAL INSPECTION
130 7/30/2018 14.00HRS YST-6 H4 BLOCK PVI-14656 SYSTEM: 740 VISUAL L.NARASIMHA PEPE CANCELED CLASS III
QTY 8JOINTS
PIPING VISUAL INSPECTION
131 7/30/2018 14.00HRS YST-6 H4 BLOCK PVI-13537 SYSTEM: 740 VISUAL L.NARASIMHA PEPE CANCELED CLASS III
QTY 8JOINTS
PIPING VISUAL INSPECTION
132 7/30/2018 14.00HRS H01M STBD CRANE BOOM PVI-14726 SYSTEM: 740 VISUAL L.NARASIMHA PEPE CANCELED CLASS III
REST YST6 QTY 8JOINTS
PIPING FITUP INSPECTION
133 7/30/2018 14.00HRS ON BOARD H11T3 PFU-18619 SYSTEM: 701 FITUP L.NARASIMHA PEPE AA CLASS III
QTY:23JOINTS

COLUMN 4S
134 7/30/2018 10.45HRS (CDT-4S) VACUUM-333 VACUUM TEST INSPECTION VACUUM TEST NAZMUL POL AA CLASS III

135 7/30/2018 10.45HRS COLUMN 4S VACUUM-334 VACUUM TEST INSPECTION VACUUM TEST NAZMUL POL AA CLASS III
(CDBTWT-4JS)
136 7/30/2018 11.00HRS _ RT RT FILM REVIEW RT REVIEW SHAKTI LR
QTY 50 JOINTS
PARTIAL REINSTATEMENT INSPECTION
JSPL-PCU-180726-1200 LQ01-515-00-080-WC-229-AF11-CC CANCELED
1 7/30/2018 16:00 HRS LQ 01 515-WC-045 LQ01-515-00-150-WC-310-AF11-CC PARTIAL RE INSTATEMENT SURESH MIZAN NOT READY CLASS III
PARTIAL REINSTATEMENT INSPECTION
LQ03-515-00-080-WC-178-AF11-CC
LQ01-515-00-015-AV-651-ES21-NI
JSPL-PCU-180726-1208 LQ01-515-00-015-AV-652-ES21-NI CANCELED
2 7/30/2018 16:00 HRS LQ 01.003 515-WC-046 LQ01-515-00-080-WC-227-AF11-CC PARTIAL RE INSTATEMENT SURESH MIZAN NOT READY CLASS III
LQ01-515-00-080-WC-228-AF11-CC
LQ03-515-00-080-WC-176-AF11-CC
JSPL-PCU-180727-1209 PARTIAL REINSTATEMENT INSPECTION
LQ03-515-00-080-WC-177-AF11-CC CANCELED
3 7/30/2018 16:00 HRS LQ 01
515-WC-053
LQ01-515-00-015-AV-446-ES21-NI PARTIAL RE INSTATEMENT SURESH MIZAN
NOT READY
CLASS III
LQ01-515-00-050-WC-226-AF11-CC
PARTIAL REINSTATEMENT INSPECTION
JSPL-PCU-180727-1210 LQ01-515-00-015-AV-649-ES21-NI CANCELED
4 7/30/2018 16:00 HRS LQ 01
515-WC-054 LQ01-515-00-050-WC-224-AF11-CC
PARTIAL RE INSTATEMENT SURESH MIZAN
NOT READY
CLASS III
LQ01-515-00-050-WC-225-AC11-CC
JSPL-PCU-180728-1216 PARTIAL REINSTATEMENT INSPECTION CANCELED
5 7/30/2018 16:00 HRS LQ 01 814-FW-044 LQ01-814-00-025-FW-454-IS13-NI PARTIAL RE INSTATEMENT SURESH MIZAN NOT READY CLASS I

6 7/30/2018 16:00 HRS LQ 01 JSPL-PCU-180726-1207 PARTIAL REINSTATEMENT INSPECTION PARTIAL RE INSTATEMENT SURESH MIZAN CANCELED CLASS I
814-FW-246 PARTIAL REINSTATEMENT INSPECTION
LQ01-814-00-025-FW-123-IS13-NI NOT READY
LQ01-740-00-025-HM-290-AC11-HC
LQ01-740-00-025-HM-340-AC11-HC
7 7/30/2018 16:00 HRS LQ 01.002 JSPL-PCU-180729-1221 LQ01-740-00-025-HM-388-AC11-HC PARTIAL RE INSTATEMENT SURESH MIZAN CANCELED CLASS III
740-HM-037 LQ01-740-00-065-HM-240-AC11-HC NOT READY
PARTIAL REINSTATEMENT INSPECTION
LQ02-740-00-025-HM-344-AC11-HC
LQ01-740-00-015-HM-341-AC11-HC
LQ02-740-00-025-HM-392-AC11-HC
JSPL-PCU-180729-1222 LQ01-740-00-025-HM-291-AC11-HC
LQ02-740-00-025-HM-422-AC11-HC CANCELED
8 7/30/2018 16:00 HRS LQ 01.002 PARTIAL RE INSTATEMENT SURESH MIZAN CLASS III
740-HM-038 LQ01-740-00-050-HM-389-AC11-HC NOT READY
LQ02-740-00-025-HM-345-AC11-HC
LQ02-740-00-025-HM-393-AC11-HC
LQ04-813-00-100-FW-367-AG13-NI
9 7/30/2018 10:00 HRS LQ 04 - PF CODE 8222-LQ04-SP14 SPL TEST ISLAM MIZAN CANCELED CLASS III
NOT READY
2 SPL

10 7/30/2018 10:00 HRS LQ 1ST Dk.(Pipe Trunk TA81 LQ- 772-IA-077 RE INSTATEMENT INSPECTION RE INSTATEMENT SURESH MIZAN CANCELED CLASS III
1ST Accom. Deck). NOT READY

LQ 1ST Dk.(Pipe Trunk LA82 At CANCELED


11 7/30/2018 10:00 HRS 772-IA-090 HYDROTEST INSPECTION HYDROTEST SURESH MIZAN CLASS III
LQ-1ST Deck). NOT READY

12 7/30/2018 10:00 HRS LQ 1ST Dk.(Pipe Trunk LA82 At 772-IA-090 FLUSHING INSPECTION FLUSHING SURESH MIZAN CANCELED CLASS III
LQ-1ST Deck). NOT READY

CANCELED
13 7/30/2018 10:00 HRS 1ST Accom. Deck. 813-FW-051 RE INSTATEMENT INSPECTION RE INSTATEMENT SURESH MIZAN NOT READY CLASS II

14 7/30/2018 11:00 HRS 2ND Accom, Deck. 813-FW-053 HYDROTEST INSPECTION HYDROTEST SURESH MIZAN GS AA CLASS II

15 7/30/2018 11:00 HRS 2ND Accom, Deck. 813-FW-053 FLUSHING INSPECTION FLUSHING SURESH MIZAN GS AA CLASS II

16 7/30/2018 11:00 HRS 1ST To 2ND Accommodation At 814-FW-249 LINE CHECK INSPECTION LINE CHECK SURESH MIZAN CANCELED CLASS II=
S6 & S7. NOT READY

PIPING BONDING FITUP INSPECTION


17 7/30/2018 14.00HRS YST6 LQ05 BONDING PFU-18675 SYSTEM: 515 FITUP ISLAM MIZAN AA CLASS III
QTY:3JOINTS
PIPING BONDING VISUAL INSPECTION
18 7/30/2018 14.00HRS YST6 LQ05 BONDING PVI-14775 SYSTEM: 515 VISUAL ISLAM MIZAN AA CLASS III
QTY 3JOINTS
PIPING FITUP INSPECTION
19 7/30/2018 14.00HRS LQ04 PFU-18416 SYSTEM: 761 FITUP ISLAM MIZAN AA CLASS III
QTY:6JOINTS
PIPING FITUP INSPECTION
20 7/30/2018 14.00HRS LQ05 PFU-18607 SYSTEM: 761 FITUP ISLAM MIZAN AA CLASS II
QTY:10JOINTS
PIPING VISUAL INSPECTION
21 7/30/2018 14.00HRS LQ04 PVI-14392 SYSTEM: 740 VISUAL ISLAM MIZAN AA CLASS III
QTY 14JOINTS
PIPING FITUP INSPECTION
22 7/30/2018 14.00HRS LQ02 PFU-18633 SYSTEM: 814 FITUP ISLAM MIZAN AA CLASS I
QTY:12JOINTS
PIPING FITUP INSPECTION
23 7/30/2018 14.00HRS LQ01,B-DECK PFU-18648 SYSTEM: 773 FITUP SURESH MIZAN AA CLASS III
QTY:3JOINTS