1.0 INTRODUCTION:
The year 2012-13 was another eventful and memorable year for the department. The
highest ever natural gas production and sale of 2444 MMSCM and 1891 MMSCM
respectively were achieved from Assam and AP fields during the year. The above
achievement was not only due to continuous hard work of Production Gas Department,
but also continuous supports and guidance received from various Departments and the
Managements.
During the year the Department was also adjudged as the'Best Department' in overall
safety performance category in the internal safety inspection. This reflects the dedication
and commitment of the department towards upholding HSE standards. The Department
is proud to receive the above recognition.
i) BCPL supply did not resume though it was planned as1 15 MMSCM.
ii) BVFCL withdrew less gas during May 2012fot plant maintenance.
iii) NRL withdrawal was less during April-May 2012 for their plant problem.
iv) Frequent local problems/bundh etc.
v) Less than the desired production potential.
Gas production and sale for the previous 3 years were as under:
iii) Disposal:
Utilization Quantitv (SCM)
Sale . 1890744028
lnternal IJtilization :338134755
LPG Extraction : 32883774
Unavoidable losses:
Flare : 167135912
Other Loss : 2808675
Compression shnnkage . 12158992
BVFCL 524518665
NEEPCO 502582022
roc (AoD) 95200492
APL 34670179
ASEB (NTPS) 238090917
ASEB (LTPS) 124619806
NRL 172212728
TEA GRIDS & OTHERS 19884921 I
Total .1890744028
4.0 GAS PRODUCTION POTENTIAL:
5,0 OPERATION
Fields
i) BH P measurement job : 50 Nos
ii) Hole probing job :8'1 Nos
iii) OFPT job :01 No.
iv) Gravel Pack : 0'1 No
Compression Services
i) Compressor Running hours
a. Low Pressure Boosters (LPB) .2,44,917 Hts
b. Gas Lift Gas Compressors (GL) : 2,75,965 Hrs
ii) Compressor Availability
a. Average LPB Availability : 88.30 o/o
SCADA
i) Antenna & Battery Maintenance : 39 Nos.
ii) RTU, Power supply unit & Computer system :22 Nos.
iii) Subscriber Radio & Base Radio maintenance : 15 Nos
iv) Field lnstrument under preventrve maintenance : 530 nos.
Vehicle Kilometraqe
Overtime
Total Overtime during the year was 1 ,78,610 Hrs against I ,66,725 in 2O11-12.
iii) Construction of 6 nos. Pipelines betlveen CGGS & COP, Madhuban and LPG
Offtake Point
EDC is subject to smooth progress of works in the fields without obstruction from
' local and other interested parties.
r
5 out of '10 Natural Gas Engine driven Gas Compressor Packages were in final
siage of commissioning as on 31i03/2103 and is expected to be commissioned by
3OtO4t2O13. The expected commissioning of the remaining 5 packages is
30/06/20,13 which is again subject to gas engine exhaust silencers to be delivered
against original supply of sub-standard silencers.
1O-O TECHNOLOGYUPGRADATION
101
Adsorption Process:
Four Nos. of Magtronic systems of Gas Engines have been converted into more
reliable and safe mode of Altronic lgnition System.
10.3
95 dioital lqnition svstem:
04 Nos_ of Altronic ignition system of Gas Engine were converted into the state-of-
the-art cPU-95 digital ignition system. The microprocessor based digital ignition
system has the capability of diagnostic, troubleshooting, trending, enhanced
energy supply to spark plugs and variable timing control. The advantage of this
system is that it has minimum mechanical failure as it does not have any
mechanical moving component. So maintenance down time is comparatively less.
One No. 2.5T capacity air hoist was installed at Kathalguri GCS as a replacement
of the chain pulley system for lifting heavy equipment, facilitating easy and safer
movement of heavy equiPment.
sl Cost Saved
Activity (Rs % Cost Saving
No.
Repairing of2 Nos of l4" damaged 1,00,000 14.00
1.
silencers of Gas Engine
Revival of 2 Nos of ELGI make 1,04,200 4.40
2.
oortable air compressors
12.0 FINANCIALPERFORMANCE:
a) Revenue earned from gas sale : 1082.97 Crore
b) Budgets
i) Expendrture
Capital Budget . 122.62 Ctorc
ii) Revenue BudgetExpeSditure '. 42.26 Crore
c) Audits (lnternal/Technical)
i) Assets
Physical Verification of : 99.06%
ii) items
SLoc verification of Non stock : 1 00%
iii) Technical Audit oflnstallations : 03 Nos
iv) Writing off Assets ( Gas Compressors) : 30 Nos
i) AP)
Natural gas production (Assam & : 2443866136 SCM
ii) Condensate produced (Gas Wells) : 223891K|s
i) MG20W40
Lube Oil, : 420180 Ltrs.
ii) 121
Lube Oil, S : 9625 Ltrs
iii) Diesel
High Speed : 32225 Ltrs
iv) Petrol : 30 Ltrs
v) Natural Gas (lntemal Use) : 338134755 SCM
14.1 Accidents
i) During the internal safety inspections, the Production Gas Department was
awarded First Prize for best overall safety performance.
ii) Other awards received during the internal safety inspection are as under:
14.5 98o/o of the employees of the department have undergone periodic medical
examination during the year.
15.1 Manpowerstrength-
The of the nt is as under:
Strength as on
Category Sanctioned
31t03t2013 31tO3t2012
Executive 43 46 41
Workmen 440 404 4't4
Note : i) 04 ETs were absorbed in Grade B as Production Engineer.
ii) 01 executive superannuated.
iii) 02 executives were transferred from the department
iv) 03 executives posted at Digboi and Moran were not included in the
above strength in 2o11-12.
v) 08 work persons were superannuated.
vi) 02 work persons expired during the year
15.2 Trainino:
. Work persons:
. Executives:
a) ln house Training : 19
b) ln Country training .26
c) Overseastraining/Conference .11
16.0 ACKNOWLEDGEMENT:
The undersigned takes this opportunity to express his sincere appreciation and gratitude
to every member of the Department for their dedication and commitment, without which
the results achieved, would not have been possible. The department would also like to
record its sincere thanks to various departments for their valuable services towards
fulfilling the objectives of the department. The department also gratefully acknowledges
the continuous guidance and supports received from the Local and Corporate
Management.
The undersigned appreciates Shri H.N. Borah, DyCEPG (A&C) for compiling the report.
(Bipin Gogoi)
Head - Production Gas