King Abdullah Financial District Project-Kafd-Cl1: Permit To Close Ceilings and Parititons
King Abdullah Financial District Project-Kafd-Cl1: Permit To Close Ceilings and Parititons
Parcel No :
Floor No :
Room No/Type :
Gridlines
Supplier :
Description of Works (Type of Ceiling and stage of Works e.g Installation of Ceiling Grid or Infill of Tiles) and List of Required MEP
Systems to be Verified for Closure:
Item Confirm the following Attachment Requirements and Referenced Attached: Y, N or N/A Remarks
Drawings including Red Line Mark Up reflecting 'As Built' Site Condition are Approved, correct status and all
1
significant Engineer comments are closed.
Material Approval Requests prior to material deliveries are all approved without significant comment (see
2
attached)
3 Material inspection Requests prior are all approved without significant comment (see attached)
4 Work Inspection Requests covering installation are all approved without significant comment
6 Air pressure tests are completed and approved for ducts and pipework
8
Bolt tightening is completed and verified in accordance with the approved manufacturer instructions.
9 Test and Commissioning works (all phases) are completed and approved
10 Works comply with the Specification, approved Method Statements and Inspection and Test Plans
Outstanding Testing and Commissioning Works referenced below has planned access after ceiling closure and is
11
approved by the Engineer.
12
13
14
Signed Declaration (see below for signatures) :All required and referenced documents have been been reviewed
and approved for final closure of the ceilings and partitions (subject to completion of approved work items
referenced above) and constitutes a completed systems handover package.
Engineer Remarks: