Process 1.
Direct creation of the order
PROCEDURE: Step 1 : Start the transaction using the menu path or transaction code.
2C
li
.c
k
S
A
P
m
e
n
u
tr
e
e
it
e
m
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 2 of 44
BUSINESS PROCESS PROCEDURE
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 3 of 44
BUSINESS PROCESS PROCEDURE
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 4 of 44
BUSINESS PROCESS PROCEDURE
Order type Order type is selected from R Enter Order type is selected from
the list shown in the system. the list shown in the system, As
As DM02 is selected in case DM02 is selected in case of
of breakdown maintenance breakdown maintenance order.
order.
Functional Enter the Functional O Choose from the list of the
Location # Location from the list. functional locations from the
required plant area.
Equipment # Enter the affected equipment O Choose from the list of the
from the list. required functional location.
Planning Enter the Planning Plant, R
Plant which is 1232 as a Naraina
S/stn
# Remark : As Functional Location and Equipment are the optional fields here, it is
not mandatory field. But if you have filled these fields here , there is no need fill
these details next screens. And also you can select anyone of the field out of these
two. So Breakdown Order can be created on either functional location or
equipments individually.
9. Click button .
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 5 of 44
BUSINESS PROCESS PROCEDURE
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 6 of 44
BUSINESS PROCESS PROCEDURE
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 7 of 44
BUSINESS PROCESS PROCEDURE
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 8 of 44
BUSINESS PROCESS PROCEDURE
Work Required
13.
In case of control key ‘PM03’ is selected in one of the line operation in the
operation Tab, then you have to select the ‘external’ button , as shown below, for filling
the external service details for the particular operation, for which external service is
required.
14. After selecting the ‘External Tab’ , following screen appear on the system, And
fields are filled as :
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 9 of 44
BUSINESS PROCESS PROCEDURE
Purchasing group Required Purchasing Group is also selected from the list
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 10 of 44
BUSINESS PROCESS PROCEDURE
Purchasing group Required Purchasing Group is also selected from the list
existing in the system
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 11 of 44
BUSINESS PROCESS PROCEDURE
(Note: On above table, in column “R/O/C”: “R” = Required, “O” = Optional, “C” = Conditional)
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 12 of 44
BUSINESS PROCESS PROCEDURE
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 13 of 44
BUSINESS PROCESS PROCEDURE
25.
As required, complete/review the following fields :
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 14 of 44
BUSINESS PROCESS PROCEDURE
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 15 of 44
BUSINESS PROCESS PROCEDURE
Example: 1
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 16 of 44
BUSINESS PROCESS PROCEDURE
IC Required
Example:
L ( Stock Item )
N ( Non-stock Item )
SLoc Required
Example:
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 18 of 44
BUSINESS PROCESS PROCEDURE
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 19 of 44
BUSINESS PROCESS PROCEDURE
Allocation Operation
Operation Required
Example:
0020
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 20 of 44
BUSINESS PROCESS PROCEDURE
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 21 of 44
BUSINESS PROCESS PROCEDURE
Change Status
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 22 of 44
BUSINESS PROCESS PROCEDURE
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 23 of 44
BUSINESS PROCESS PROCEDURE
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 24 of 44
BUSINESS PROCESS PROCEDURE
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 25 of 44
BUSINESS PROCESS PROCEDURE
Example:
12310000
Example:
12310000
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 26 of 44
BUSINESS PROCESS PROCEDURE
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 27 of 44
BUSINESS PROCESS PROCEDURE
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 28 of 44
BUSINESS PROCESS PROCEDURE
41. button .
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 29 of 44
BUSINESS PROCESS PROCEDURE
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 30 of 44
BUSINESS PROCESS PROCEDURE
Plan/Actual Comparison
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 31 of 44
BUSINESS PROCESS PROCEDURE
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 32 of 44
BUSINESS PROCESS PROCEDURE
Result:
You have created Maintenance Order Successfully. Your order will be saved with no
given as under, and it is a unique no generated by the system.
Process 2.
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 33 of 44
BUSINESS PROCESS PROCEDURE
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 34 of 44
BUSINESS PROCESS PROCEDURE
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 35 of 44
BUSINESS PROCESS PROCEDURE
Step 3. For selection of the desired notification from the list, click button
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 36 of 44
BUSINESS PROCESS PROCEDURE
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 37 of 44
BUSINESS PROCESS PROCEDURE
Now, it can be seen from the above screen , a notification can be selected
by above selection criteria as-
• Notification Status
• Notification Number
• Equipment wise
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 38 of 44
BUSINESS PROCESS PROCEDURE
Fill any of the field above and select the notification as under-
Step 4elect the particular notification from the list and click button to
open the notification.
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 39 of 44
BUSINESS PROCESS PROCEDURE
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 40 of 44
BUSINESS PROCESS PROCEDURE
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 41 of 44
BUSINESS PROCESS PROCEDURE
button .
Create Order
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 42 of 44
BUSINESS PROCESS PROCEDURE
[Type text]
Last changed on: Last changed by: Version: 1.0 Page:
22.09.2010 PM Core Team 43 of 44
BUSINESS PROCESS PROCEDURE
Step 8. After it all the fields and screen are same and same steps are
followed as in the above case ( From page no 7 to 31 ).