Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

CURRICULUM VITE

NARENDER SINGH

Vill. Bah, P.O. Gaher, Tehsil.Sarkaghat,


Distt. Mandi Himachal Pradesh PIN. 175049
Contact Number: +91-9816606850
E-mail: narendersinghthakur92@gmail.com

CAREER OBJECTIVE:-

Aim to associate with a progressive organization which enables me to utilize my Knowledge &
Sincerity and being a part of the team, works dynamically towards the growth of Organization.

QUALIFICATION:-

Examination Board Year Of Name Of Aggregate


University Passing Board/ Marks
University
AISSE(12th) Dharamshala 1997 HPSEB 67 %
Dharamshala
2 year
Certificate ITI MANDI 2002 ITI MANDI 67%
SURVEYOR

PROFESSIONAL EXPERIENCE:-

16 years 6 months working experience in construction of hydro power project.


 Working experience in construction of underground as well as surface components
involved in hydro projects.
 Knowledge of surveying, measurements, billing, work planning, AutoCAD,TMS Ofiice,
Autodesktop, Landdesktop.
 Experience in operating the Total station and auto level.
 6 Year Billing Experience.
WORKING EXPERIENCE:

1. Organization : Hindustan Construction Company Ltd.


Client : THDC INDIA LTD TEHERI
Position : Surveyor
Period : July 2019 to Till Date
Job Responsibility : Plotting of L-sec., Cross Section in co-ordinate system & Billing
Project : TEHRI PUMPED STORAGE PLANT (4x250MW)

2. Organization : Rathi Civil Engineering Pvt Ltd.


Client : T.P.G.P.L. (Statkraft,Norway company)
Position : Survey Manager
Period : Aug 2018 to July 2019
Job Responsibility : Plotting of L-sec., Cross Section in co-ordinate system & Billing
Project : Tidong Hydro Power Project Pvt. Ltd. (150 MW)

3. Organization : Rathi Civil Engineering Pvt Ltd.


Client : Cosmos Hydro Projects Pvt. Ltd
Position : Sr. Surveyor
Period : March 2018 to Aug 2018
Job Responsibility : Plotting of L-sec., Cross Section in co-ordinate system & Billing
Project : Chanju – II Distt. Chamba (19.8 MW)

4. Organization : Rathi Hydro Projects Pvt Ltd.


Client : Gaur Hydro Projects Pvt. Ltd
Position : Sr. Surveyor
Period : July 2017 to February 2018
Job Responsibility : Plotting of L-sec., Cross Section in co-ordinate system
Project : Sarwari Stage –III (2 MW)

5. Organization : Rathi Hydro Projects Pvt Ltd.


Client : NSL POWER PROJECTS PVT LTD
Position : Sr. Surveyor
Period : March 2012 to July 2017
Job Responsibility : Plotting of L-sec., Cross Section in co-ordinate system
Project : Tidong Hydro Power Project Pvt. Ltd. (150 MW)

6. Organization : Rathi Hydro Projects Pvt Ltd.


Client : NHPC
Position : Sr. Surveyor
Period : March 2007 to March 2012
Job Responsibility : Plotting of L-sec., Cross Section in co-ordinate system
Project : Parbati H.E. Power Project Lot -11 Kullu (HP)
7. Organization : SCL INFRATECH LIMITED
Client : SASI HYDRO PROJECTS
Position : Assistant Surveyor
Period : December 2004 to February 2007
Job Responsibility : Plotting of L-sec., Cross Section in co-ordinate system
Project : Hurla Small H.E. Power Project (3MW) Kullu HP

8. Organization : HPPWD
Position : Surveyor
Period : April 2003 to November 2004
Job Responsibility : Surveying

USED ELECTRONIC DEVICES

INSTRUMENT : 1) Topcon GTS 226


2) Leica T.S. 1800 L
3) Sokia Set X-1
4) Trimble M 3
5) Auto Level (Hope), B-2
6) Leica T.S. 09

THEDOLITES : 1) T-2 (Wild) TMIA (Sokia)

I here by declare that the statement furnished in my bio-data is True to the best of my
knowledge and belief.

(Narender Singh)
Place: Mandi (HP)

You might also like