Professional Documents
Culture Documents
ABS Water Supply Group
ABS Water Supply Group
AARSH DEDHIA – 08
MEET DEDHIA – 09
ROMIL JAIN – 19
DISHAN SHAH – 63
SNEHAL LIMAYE – 87
DHRUVI SUTHAR - 88
Location Noida, Sec-19, Uttar Pradesh
Type Commercial
CASE STUDY :- WORLD Architectural Style Modernism
meet
Criteria for selection of Case Study
Introduction
Man-Hole
Sewer Line
Site Trench
Drainage layout
WATER
SUPPLY &
DRAINAGE
LAYOUT
PLUMBING
INSTALLATIONS
IN
COMMERCIAL
BUILDING
CALCULATIONS
• Water requirements Calculation :- • Drainage Calculation :-
• LPD for UGT calculations, according to NBC, is 45 • Calculation for I.C.:- 1st I.C. to be considered
litres; and no. of people according to occupancy load at – 450 mm level.
are around 4400.
• 2nd I.C. depth = (distance between 1st and
• Hence, no. of persons x per LPD = 2nd) / slope.
• 4400 x 45 = 198000 litres.
• 1000 L = 1 m3 • (Considering 1:60 slope), 1st chamber is at -
• Therefore, 198000 L = 198 m3 450mm depth and distance between the 2nd
chamber is approx. 12m so 12/60 = 0.2m.
• So considering volume of a tank with height as 1.2 M,
• Volume = L x B x H • Hence next I.C. will be at – 470 mm.
• Therefore, 198 = L x B x 1.2
• Assuming, L = 2B,
• 198 = 2B x B x 1.2
• B2 = 198 / 2.4
• B2 = 82.50
• B = 9.08 M
• L = 0.5 x 9.08 = 4.54 M.
Refuge floor, Fire alarms, sprinkler systems, stairwell pressurization are the primary
fire safety systems at the world trade tower building.
Refuge Area
Escape Path
Pressurization
To protect the staircase and the lift lobby from the smoke during a fire, they are pressurized.