CALIBRATION
SERVICE COMPANY
FOR INDUSTRIAL INSPECTION & RADIOLOGICAL SERVICES WLL LABORATORY
CONDUCTIVITY METER
Revision No. 0
Date 01-January-2019
Purpose Implementation
Document No. Rev. No. Issue No. Date of Issue Page No.
L3-ATS-CAL-15 0 1 01-Jan-2019 2 of 9
i) Revisions after Rev. 0 are denoted by a vertical line in the left hand margin
against the revised text, with the revision number displayed next to the revision
line as shown on the left.
ii) Revision numbers are A, B, C, etc. up to the issue for management approval
and implementation, which is Rev. 0. Subsequent revisions shall be 1, 2, 3,
etc.
Document No. Rev. No. Issue No. Date of Issue Page No.
L3-ATS-CAL-15 0 1 01-Jan-2019 3 of 9
Table of Contents
1.0 Purpose 4
2.0 Scope 4
3.0 Reference 4
4.0 Definitions 4
5.0 Responsibilities 4
9.0 Records 5
10.0 Attachments 5
Document No. Rev. No. Issue No. Date of Issue Page No.
L3-ATS-CAL-15 0 1 01-Jan-2019 4 of 9
1.0 PURPOSE
1.1 The purpose of this work instruction is to ensure that standard practices /
methods of Calibration are followed to obtain reproducible and comparable
results and this document shall be revised as and when required to meet
specific requirements of the project to become a project specific work
instruction.
2.0 SCOPE
2.1 This work instruction is applicable for ATSi’s Calibration Laboratory to
carryout calibration of conductivity meter at Lab. temperature as per
applicable international standards/methods.
3.0 REFERENCE
3.1 Standard Conductivity Solutions.
3.2 Documents used: Conductivity Meter User Manual.
4.0 DEFINITIONS
4.1 Conductivity: The conductivity (or specific conductance) of an electrolyte
solution is a measure of its ability to conduct electricity.
4.2 UUT : Unit Under Test.
5.0 RESPONSIBILITIES
5.1 All the Operators/Technicians perfoming the Calibration shall be trained by
ATS.
Document No. Rev. No. Issue No. Date of Issue Page No.
L3-ATS-CAL-15 0 1 01-Jan-2019 5 of 9
7.2 UUT should be inspected visually before starting the calibration. Visual
inspection is done for:
Any physical damage in the conductivity probe
Proper Display
9.2 The test report should contain the following information as minimum.
Client/Customer Name
Test results
10.0 ATTACHMENT