Compro New 2020 - Compressed NEW

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 24

COMPANY

PROFILE
RTIFIE

www.bukakainti.com
CE

ISO
9001:2015
COMPANY OVERVIEW

PT. BUKAKA INTI AIRCON was established in 2006. Our goal


is to become national premier HVAC company and needles to
say, we already there. Supported by client’s trust and satisfaction,
we growth very fast in team number, asset, and also abundant
references. Our head office located at Surabaya and war ehouse
located at Gedangan, Sidoarjo. We also have support branches at
Jakarta, Makassar, Bali, Manado, and balikpapan to effectively cover
our client ‘s needs in those regions.
We have more than one hundred engineers with great experiences
in HVAC field brought along with sense of services and commitment,
readily to give best and comprehensive satisfaction and solution.
trough listening and responding to your specified needs, we don’t just
speak about quality service, but we practice it every day.

1
Hutama Karya Tower
Clean Up Chiller

CONTENTS
1 COMPANY OVERVIEW
CONTENTS
ISO 9001 CERTIFIED
OUR SCOPE OF BUSINESS
OUR CUSTOMER
GREEN TECHNOLOGY
OUR SEGMENTED MARKET
PRODUCT OVERVIEW

2
ISO 9001 Certified
PT. BUKAKA INTI AIRCON
is ISO 9001 certiefied company, which
mean a lot of advantages for our clients.

Guaranteed
continues On time Professional
improved quality delivery attitude
and service

Independent audit Viewer


demontrates returned products
commitment to quality and complaints

3
global group R

United Kingdom

Certificate of Compliance
This is to certify that the Quality Management System of

PT. BUKAKA INTI AIRCON


Jl. Wisma Permai II No. 29, Surabaya 60115, East Java, Indonesia

for the following scope


HVAC (Heating, Ventilation, and Air Conditioning) Provider

has been assessed and complied against the provisions of

ISO 9001:2015
International Standard

Project: Q180255
Registration Number: QS 181255 C
Certification Date: 21 September 2018
Recertification Due Date: 20 September 2019
Code: F 43.21
Certificete of compliance is subject to audit stage 1 standard management system. It will be continuing to registration
after passing stage 2 following audit. If the following audit not conducted in a year, registration will be removed.
This certificate is property of PT. Global Certification Indonesia
Sampoerna Strategic Square, South Tower 30th Floor, Jendral Sudirman Kav 45 - 46 Jakarta 12930
Perkantoran Manyar Tompotika Blok A - 2, Raya Menur Pumpungan 167 Surabaya 60116

Please validate the authenticity and status of this certificate by scan barcode or at www.globalgroup.co.id

Serial No : 182731

4
Our Scope of Business

PT. BUKAKA INTI AIRCON strives for


giving a specific solution for each
project, so our team is divided into two
divisions: project division and service
division.

The project division is fully qualified


to handle all phase of system design
and installation. We provide services
for industrial and commercial building
applications. We ready to assist you
in designing your HVAC requirement,
consultation, procurement, supplying,
project management, fabrication,
installation, construction, quality
Service Hutama Karya Tower
supervision, pre-commissioning,
system retrofitting, and collaborate
the building system automation as
well as designing energy saving
programs to achieve the peak
design performance for your
facilities and asset. Our air
conditioning project team has the
capabilities to custom-build a product
to meet your specific requirement. Install Chiller Hutama Karya Tower

5
PT. Total Indonesia Project
Service & Maintenance Contract

6
Our Scope of Business
The service division of us is the best in the country, well known
for always be ready ensuring our customer facilities running in the
well shape. PT. BUKAKA INTI AIRCON has reputation for the excellent
quality and its responsive 24 hours / 7 days a week service which
satisfy our long time customer. We ready to ensure your
ALL BRAND CHILLER running in smooth operation.

Maintenance Routine
Visit

Repairing Job Overhaul Chiller


Unit

Tube Chemical-
N Mechanical
A HU Cleaning
T
BUKAKA INTI AIRCON
MELAYANI

Refrigerant Conversion Star up &


Re-commisioning

Technical Consultan

Training Program Chiller Performance


Analysis

Oil Analysis

7
By far the best proof is
experience

Sir Francis Bacon, British


Philospher (1561 - 1626

Newmont Sumbawa Project


Service & Maintenance Contract

8
OUR CUSTOMER

More than
500 projects
all over
Indonesia

Greenfields Project
Supply & install chiller, CT, and piping

9
OUR CUSTOMER

10
OUR CUSTOMER

11
Menara Kompas - Jakarta
Supply chiller

12
Green Technology
HVAC system consume s almost
45% 50% of your total electricity
HVAC cost. It is become our main
concern as professional in HVAC
26%Lighting to give solution for your energy
saving.
21% Other
8%
Office

As supporting partner of Green


Building Council Indonesia
(GBC Indonesia) , our focus is to
pursue sustainable green
principles, particularly in building
construction industry in
Indonesia.
Green building approach enables building owners like
you to reduce energy consumption, improve the work
environment, and reduce the environmental impacts of
building operations. If the building can reduce
operating costs, increase occupant productivity, and
decrease health complaints, as well as be
environmentally responsible, it is a green building.

13
R

Magne c Full Falling Film Centrifugal Chiller

Full Falling Film Refrigerant cooled Magnetic Compressor


Evaporator (Patented) VFD panel with Integral VFD

High
Efficiency
Direct-Drive
Technology

Lower
Noise
R

Capacity Range

527 To 2461 kW

150 To 1000 RT

Magnetic
Compressor

Oil Free
&
Intelligent
Control

Condensor Economizer Control Panel


with Integral Sub Cooler

14
Green Technology
Comparison of Chiller Electricity Consumption within 6 Months
at Sanur Paradise Hotel - Bali
Konvensional Centrifugal Chiller Existing Magnetic Leviathan Centrifugal Chiller - New
Total Pem. Chiller Biaya Total Chiller Total Pem. Chiller Biaya Total Chiller
Bln/Thn LWBP WBP Daya (Rp) (Rp) Bln/Thn LWBP WBP
Kwh Daya Kwh (Rp) (Rp)
Mar - 14 126.27 27.93 154.2 74 432.257.316 207.438.660 Mar - 15 105.6 32.17 137.77 34 359.424.281 88.701.644

Apr - 14 121.34 26.6 147.94 67 414.457.296 187.702.033 Apr - 15 119.19 15.96 135.15 39 420.597.707 121.371.147

May - 14 130.81 29.6 160.41 76 509.508.620 241.398.012 May - 15 106.94 22.86 129.8 32 394.591.887 97.279.972

Jun - 14 131.5 28.98 160.48 74 508.493.246 234.474.702 Jun - 15 112.22 24.51 136.73 41 419.271.015 125.723.043

Jul - 14 119.48 25.45 144.93 53 460.108.244 200.005.654 Jul - 15 109.59 23.06 132.65 44 413.614.776 137.196.006

Aug - 14 130.96 29.33 160.29 67 522.580.069 218.434.491 Aug - 15 118.51 25.7 144.21 34 446.057.555 105.165.778

1.289.453.553 675.437.590

Chiller Usage Mar - Aug 2014


Chiller Usage Mar - Aug 2015 Control Panel Chiller at Hutama Karya Tower
Saving within 6 months running
1.289.453.553
675.437.590
*Note 614.015.962
Same Conditional
Kwh calculation in chilller is done by the customer
the chiller unit runs 24 hours non-stop

An integrated and holistic design


process beginning at aproject’s
inception is required to optimise the
HVAC design and operation for
g r e e n b u i l d i n g s . I n Plant Efficient at Hutama Karya Tower
PT. BUKAKA INTI AIRCON, we
have hundreds of engineer with
good reputation in analyzing your
energy saving needs. We also
p r o v i d e a f e w o f n e w H VA C
technologies that will drive down
system costs and accelerate
integration of the new systems
within conventional HVAC systems.
If green means happier tenants
and healthier occupancy rates, by print screen
more building owners would want Hutama Karya Tower - Cawang
to incorporate th ese technologies
to gain a powerful market advantage.

15
Our Magnetic Levitation Chiller References

Menara Kompas - Jakarta


Hydronic System 5,028 kW total capacity
Provided by 4 TECS water cooled chillers + Clima PRO

Sanur Paradise Plaza Hotel - Bali


Hydronic System 1,400 kW total capacity
Provided by 1 TECS water cooled chiller

Tifa Arum Realty - Jakarta


Hydronic System 1,400 kW total capacity
Provided by 1 TECS water cooled chiller

Aryaduta Hotel - Menado


Pneumatic System 1,055 kW total capacity
Provided by 1 TECS air cooled chiller

Icon Mall - Gresik


Hydronic System 7,060 kW total capacity
Provided by 4 TECS water cooled chillers

Mercure Hotel - Lampung


Hydronic System 8,088 kW total capacity
Provided by 5 TECS water cooled chillers + Clima PRO

Grand Classic Hotel - Cikarang


Hydronic System 8,018 kW total capacity
Provided by 6 TECS water cooled chillers + Clima PRO

16
OUR SEGMENTED MARKET

1. Commercial Building

Products
Chillers
Heat Pumps
Air handling unit
Terminal unit
Roof-top up to 2.400 kW

2. High Precision Aplication

3. Process Cooling

17
By far the best proof is
experience
Sir Francis Bacon, British
Philospher (1561 - 1626

18
PRODUCT OVERVIEW

Inverter Direct Drive


Centrifugal Chiller With Full
Failing Film Evaporator
Unit-mounted 250-1300 RT

High Efficiency Water Cooled


Centrifugal Chiller
600-2200RT

Magnetic Levitation
Centrifugal Back to Back Chiller
With Full Failing Film Evaporator
170-900RT

19
PRODUCT OVERVIEW

Water Cooled Water Cooled


Screw Chiller Screw Chiller
340 - 510RT Dual compressor 100 - 300RT Single compressor

20
PRODUCT OVERVIEW

Air Cooled

Screw Chiller Air Handling Unit


556 to 1330kW Air flow from 350 to 44400 l/s

21
PRODUCT OVERVIEW

Air Cooled Scroll Chiller


WSAT-XSC3
90 - 480RT

Air Cooled Scroll Chiller


Large Capacity
WSAN-H
95RT

Air Cooled Scroll Chiller


Large Capacity
WSAN-H
125RT

22
Head Office
Jl. Baruk Tengah Block CC No. 39B
Pondok Nirwana, Surabaya-Indonesia
T. +62 (21) 9900 4529-30 F. +62 (31) 878 4387
e. sbyoffice@bukakainti.com
Jakarta Branch
Jl. Anggrek Neli Murni IIA Block C 12A,
Kemanggisan-Slipi, Jakarta Barat-Indonesia
T. +62 (21) 548 2941 F. +62 (21) 548 2941
e. jktoffice@bukakainti.com

You might also like