RESPONSIBILITY

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

RS OPERATOR

1. Reelend used
2. Rs Setting
3. No. of kites and conditions
4. Rs status and condition

BEFORE RUNNING THE PRESS

1. Plate clamping on different location


2. Ensure enough reel availability
3. Pasting making before 50 minutes of startup
4. Copy picking and counting from conveyor during every startup
5. Copy checking in CTP
DURING RUNNING PRESS

1. Kite making
BREAKDOWN 2. Copy checking

1. Cleaning
2. Ratchet and kites handover
3. RS report handover
AFTER PRINTING 4. Indivisual the tower after cleaning
II CONSOLE OPERATOR I CONSOLE OPERATOR
1. To ensure blanket cleaning before webinar 1. Product and planning
2. Check ink room console operation' 2. Follow the checklist
3. Webbing up and turning one by one 3. Webbing up and turning one by one
4. Checking sip values and ink duct 4. Tension checking
5. Checking nip values
6. Setting centric according to reel width

1. Self copy checking 1. Self copy checking


2. Water ink balance 2. Register and fold
3. Density maintain 3. CEO copy handover ASAP
4. Keeping sample copy 4.File taking
5. CEO copy handover ASAP
6.File taking

1. Tower checking during web break 1. Inform to incharge about stoppage

1. Ink key zero and aggitator off 1. Handover the report


2. Cleaning
3. Handover the file copies
FERAG COPY CHECK
1. Ensure the availability of spray paint

1. Self copy checking


2. Start-up copy check and and release to dispatch
3. Spray the paint on wastage
4. File checking and handover to dispatch

1. Last copy checking in every stop

1. Spray the paint on entire waste


2.Keep entire waste on defined location
3. Snap taking off waste

You might also like