SECTION 1 -TRANSPORTS, RENTALS AND PERSONNEL CHARGES
1.19 COMPRESSOR
400 cu.ft/min., per job........................................................................................ 520.00
Page 2
Sec. 1
Page 1
Sec. 2
SECTION 2 - CEMENTING SERVICES
C Per each reserve cementing unit used, per job .......................... Same as Ref. N° 2.2A
D Reserve cementing unit, per 8 hours or fraction, per unit ............................. 2,015.00
Page 2
Sec. 2
Page 3
Sec. 2
2.8 DENSIMETER
Per job ................................................................................................................ 673.40
Page 4
Sec. 2
Page 1
Sec. 3
SECTION 3 - FRACTURING SERVICES
Q* P
HHP =
40.80
In wells where the fracturing job is performed in more than one stage
and/or in sub-stages, the HHP amount will be corresponding to the
stage or sub-stage of highest Horsepower.
Page 2
Sec. 3
Ref. N° DESCRIPTION PRICE (US $)
3.9 BLENDER
First 8 hours ........................................................................................ 2,860.00
Each additional hour or fraction.......................................................... 286.00
Page 3
Sec. 3
3.16 FRAC VALVES AND CONNECTIONS LEFT AT WELL AFTER THE JOB
Charges for valves and connections left at well at customer request
for more than 24 hours after the job completion, will be as follows:
A 4" valve for casing, per day ............................................................................... 325.00
B 3" valve for tubing, per day ............................................................................... 156.00
C Reductions 4 1/2" - 5 1/2", per day .................................................................... 45.50
D Reductions 2 7/8" - 3 1/2", per day .................................................................... 23.40
E Fracturing head, per day .................................................................................. 109.20
Page 1
Sec. 4
SECTION 4 - ACIDIZING AND CHEMICAL SERVICES
Sec. 4
Page 1
Sec. 5
SECTION 5 - BULK MATERIAL SERVICES
Page 1
Sec. 6
SECTION 6 – TESTING TOOL SERVICES
6.2 TRANSPORT
Delivery charge – larger than 1 ½ Ton per mile .................................................... 3.77
6.4 STAND BY
Time in excess of 3 hours prior to start of job and in excess
of 3 hours after completion of job, per hour ........................................................ 45.50
Page 2
Sec. 6
DEPTH (US $)
Each 1000' or fraction
below 15000' add ....... 104.00
B Each additional hour or fraction .......................................................................... 52.00
C A charge will be made for all well packers damaged during a job,
according to current sales price.
D Additional packer assembly, used on successful lest or misrun......................... 455.00
Page 3
Sec. 6
Page 1
Sec. 7
SECTION 7 – SPECIAL TOOL SERVICES
7.3 STAND BY
Time in excess of 3 hours prior to start of job and in excess
of 3 hours after completion of job, per hour ........................................................ 58.50
add .......
Page 2
Sec. 7
Page 3
Sec. 7
Page 4
Sec. 7
B After first 5 days, on the same job and well, per month or fraction per tool:
Thru 7" (US $) 9 5/8" (US $) 13 3/8" (US $)
Packer 1,482.00 2,288.00 2,288.00
Retrievable bridge plug 1,235.00 1,573.00 1,573.00
ALL TOOLS REMAIN THE PROPERTY OF BJ SERVICES INTERNATIONAL S.A.
C OPERATOR’S SERVICE CHARGE for retrieving or resetting retrievable tool.
after retrievable tools have been left in hole at customer’s request and
BJ Services operator is required to retrieve or reset tool .
Each 16 hours or fraction until job is completed, plus round trip
mileage charge ............................................................................................. 637.00
Personnel charge for picking-up and / or delivering tool per hour or
fraction plus mileage, base camp to location .................................................. 52.00
Per each day, per tool left in well at customer’s request.............................. 19.50
Page 5
Sec. 7
Page 1
Sec. 8
SECTION 8 - CHEMICAL PRODUCTS AND MATERIALS
8.5 RETARDERS
A R-5 lbs………………………………………………………. 2.87
B R-3B lbs……………………………………………………….. 4.42
C R-21L gls……………………………………………………….. 24.05
D R-10L gls…………………………………………………… P.A.R.
Page 2
Sec. 8
8.10 EXTENDERS
A Bentonite, lbs ………………………………………………………… 0.65
B Fly Ash, lbs ………………………………………………………… P.A.R.
C Rafaelita, lbs ………………………………………………………… P.A.R.
Page 3
Sec. 8
Page 4
Sec. 8
8.20 BASKET
For OD Casing
A 4 1/2" ......................................................................................... P.A.R.
B 5 1/2" ......................................................................................... P.A.R.
C 7" .......................................................................................... P.A.R.
D 9 5/8" ......................................................................................... P.A.R.
E 13 3/8" ....................................................................... ............... P.A.R.
8.21 CENTRALIZERS
For OD Casing
A 4 1/2" .......................................................................................... P.A.R.
B 5 1/2" .......................................................................................... P.A.R.
C 7" .......................................................................................... P.A.R.
D 9 5/8" .......................................................................................... P.A.R.
E 13 3/8" .................................................................................... .. P.A.R.
Page 5
Sec. 8
8.31 BUFFERS
A BF-3, lbs ........................................................................................... 2.47
B BF-10L, gls ........................................................................................... 13.91
C BF-9L, gls …………………………………………………………… 14.98
8.32 FLUID RECOVERY
Page 6
Sec. 8
Page 7
Sec. 8
8.41 DIVERTERS
A Ball sealers 7/8", s.g.: 0.9, ea ................................................................... 7.51
B Divert II Benzoic Acid, lbs ....................................................................... 3.19
8.42 SURFACTANTS
A NE-10, gls ........................................................................................... 54.86
C NE-18, gls ........................................................................................... 51.35
D NE-20, gls ........................................................................................... 40.95
E NE-22, gls ........................................................................................... 56.55
8.48 ANTI-SLUDGE
A AS-3, gls .......................................................................................... 44.46
B NE-32LB (AS-32), gls ............................................................................ 52.00
Page 8
Sec. 8
Page 9
Sec. 8
8.55 ACIDS
A Acetic, gls ............................................................................................ 20.61
B Benzoic, lbs ............................................................................................ 3.19
C Boric, lbs ............................................................................................ 3.32
D Formic, gls ............................................................................................ 24.57
E Sulfamic, lbs ............................................................................................ 2.34
Page 10
Sec. 8
Page 11
Sec. 8
SECTION 9
MATERIALS IN CONSIGNMENT
Material will be imported under consignment and prices quoted FOB Houston.
Petro-Tech will pay the duties for custom inspection, transportation and taxes to Talara – Perú.
Page 1
Sec. 9
CEMENTING CHEMICALS
MATERIAL IN CONSIGNMENT
Page 2
Sec. 9
FRACTURING & STIMULATION CHEMICALS
MATERIAL IN CONSIGNMENT
Page 4
Sec. 9
FLOATING EQUIPMENT, BRIDGE & SQUEEZE PLUGS
MATERIAL IN CONSIGNMENT