Professional Documents
Culture Documents
Road Inventory Survey Format
Road Inventory Survey Format
Technical Assistance for Karnataka State Highway Network Improvement Strategy Appendix C: Engineering Surveys and Analysis
Maximum
Width of High flood Low Water Design Protection work
Whether water way Design
Footpath level Level Discharge Remarks
adequate (Yes/No) velocity
(m) (HFL) (LWL) (cumecs) Bed Approaches
(m/sec)
15 16 17 18 19 20 21 22 23
*face to face of dirt wall **Below bottom of girder/soffit Remarks: Indicate and other feature considered importan
Location
Chainage Condition of
Type of Flooding
Remarks
structure history Parapets/R Other Other
Expansion Wearing Super Approac Guide
Bearings ailings/cra Foundations Abutments Piers protective items
joints coat Structure h slabs bunds
sh barriers works (specify)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
· Indicate whether the structure widening, reconstruction, repairs and/ or rehabilitation, addition of span (waterway)
· A detailed report should be furnished for each structure proposed for reconstruction and / or addition of span (increase in length).