ADB TA 7324 - IND Final Report

Technical Assistance for Karnataka State Highway Network Improvement Strategy Appendix C: Engineering Surveys and Analysis

Road Inventory Survey Format


ROAD INVENTORY SURVEY
Road Name: Date of Survey:
Chainage Pavement Shoulder Ht. Of Embankment Road Side Drain Road Junction
Village
Low
Type of Land Use Right of Roadway
Type Width Type Widt Exists Does not Location Injunction with/ Start End Lying Remarks
From To Terrain @ Way (m) Width (m) Left (m) Right (m) Name
# (m) # h (m) (F/NF)* Exist** (km) Leading to Ch. Ch. Area

@ Land Use, indicate built-up, agriculure, barren, industrial, forest etc


# For Type of carriageway / shoulder, indicate CC/BT/Metalled/Gravel/Earth
*F = Functional; NF = Non Functional
** If side drain doesnot exist put a X mark
Remarks: Indicate history of submergence or any other information of significance. Indicate sections in Builtup area, Sections require raising

Scott Wilson 1 August 2011


ADB TA 7324 - IND Final Report
Technical Assistance for Karnataka State Highway Network Improvement Strategy Appendix C: Engineering Surveys and Analysis

Road Condition Survey Format


ROAD CONDITION SURVEY
Pot-holed Rave lled Pavement Rut Length affected with shoulde r drop
Chainage Surface Cracking Area Soil Condition of
Area Area Edge Break Depth more than 50 mm Remarks
De tails Type Pavement
From To Thin Crack Wide Crack (%) (%) Left Right mm LHS (m) RHS (m)

Scott Wilson 2 August 2011


ADB TA 7324 - IND Final Report
Technical Assistance for Karnataka State Highway Network Improvement Strategy Appendix C: Engineering Surveys and Analysis

Bridge Inventory Survey Format


INVENTORY OF STRUCTURES

(Bridges and other Structures)

Date of Survey : Section: km_______to km_________

Span or viaduct Average Width of


Location Type of Structure Type of Type of Whether
Year of Type of Length arrangement vertical carriagewa
(Chainage Expansion Wearing High level
Construction Bearing (m)* clearance* y between
) Super Sub Foundatio Joint Coat Yes/No Number of Length of * (m) kerbs (m)
structure structure n Spans Span (m)
1 2 3 4 5 6 7 8 9 10 11 12 13 14

Maximum
Width of High flood Low Water Design Protection work
Whether water way Design
Footpath level Level Discharge Remarks
adequate (Yes/No) velocity
(m) (HFL) (LWL) (cumecs) Bed Approaches
(m/sec)
15 16 17 18 19 20 21 22 23

*face to face of dirt wall **Below bottom of girder/soffit Remarks: Indicate and other feature considered importan

Scott Wilson 3 August 2011


ADB TA 7324 - IND Final Report
Technical Assistance for Karnataka State Highway Network Improvement Strategy Appendix C: Engineering Surveys and Analysis

Bridge Condition Survey Format


BRIDGE CONDITION SURVEY
(Bridges and other Structures)

Date of Survey : Section: km_______to km_________

Location
Chainage Condition of
Type of Flooding
Remarks
structure history Parapets/R Other Other
Expansion Wearing Super Approac Guide
Bearings ailings/cra Foundations Abutments Piers protective items
joints coat Structure h slabs bunds
sh barriers works (specify)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

·  Indicate whether the structure widening, reconstruction, repairs and/ or rehabilitation, addition of span (waterway)
·  A detailed report should be furnished for each structure proposed for reconstruction and / or addition of span (increase in length).

Scott Wilson 4 August 2011


ADB TA 7324 - IND Final Report
Technical Assistance for Karnataka State Highway Network Improvement Strategy Appendix C: Engineering Surveys and Analysis

Benkelman Beam Deflection Test Format

Scott Wilson 5 August 2011


ADB TA 7324 - IND Final Report
Technical Assistance for Karnataka State Highway Network Improvement Strategy Appendix C: Engineering Surveys and Analysis

Scott Wilson 6 August 2011