FUEL FLOW vs. TIME AVERAGE FUEL FLOW: 6,8 l/h USED FUEL: 93,1 l ENGINE WORK TIME: 13:41:46
25
1,4 l
8,4 l
15,5 l
23,0 l
27,4 l
34,2 l
41,1 l
47,4 l
48,7 l
51,9 l
57,0 l
66,5 l
75,9 l
79,1 l
86,2 l
93,1 l
93,1 l
Fuel Flow ( l/h )
20
15
Stop (23:00:28)
10
0
TORQUE vs. TIME TORQUE WORK TIME: 00:00:00
1
Torque ( daNm )
0,8
0,6
Stop (23:00:28)
0,4
0,2
0
ROTARY vs. TIME ROTARY WORK TIME: 00:00:00
1
Rotary ( rot/min )
0,8
0,6
Stop (23:00:28)
0,4
0,2
0
HOOK LOAD vs. TIME CRANE WORK TIME: 11:18:24
22
Hook Load ( t )
17,6
13,2
Stop (23:00:28)
8,8
4,4
0
07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 24:00
Time ( hh:mm )
This report was generated using Ro Scientific® WellAid application (www.roscientific.com).
WellAid 2013. Version 3.00.100 (RTM.121130 - 100) © 2013 Ro Scientific. All rights reserved.