Professional Documents
Culture Documents
SS-1 Deep Well Earth Pit
SS-1 Deep Well Earth Pit
NORTH
PREVAILING WIND
DIRECTION
3110-05-DWEP-0001
FOR ELECTRICAL
TELECOM TRENCH
FOR CONTINUATION, REFER DWG. NO. KHF-25-104133-EA-8809-00006-0001
N 346.150
b
d A B d C D E1 F G H J K
300/70
b
b 70/70 E
300/70 300/70 300/300 300/70 70/70 70/70
d KMCR BUILDING
300/300
d d
d 3 1 2 E. 569.675
3110-05-LEP-0001
BUILDING 0002 0003 0004 N. 402.575
d REINFORCEMENT BAR
C02 EARTH CABLE RISER (TYP.)
b
C01 FROM EL. 99.420 11
TO EL. 105.050 d UP
d
UP 70/70 UP EARTHING CABLE RISE AT EARTHING CABLE RISE AT UP 1
300/70 GROUNDING CONNECTIVITY TO d 300/70
d d d FROM EL. 99.420 FROM EL. 99.420 d d 70/70
d d d AUXILIARY ROOM AT KMCR BUILDING. e
d d e TO EL. 101.485 TO EL. 101.485 g g 300/25 300/70
300/300 d 70/70 d
70/70 70/70 70/70 UPS NEUTRAL (TYP.) 70/70 UPS NEUTRAL (TYP.) 300/70
d d 3110-05-LEP-0003
300/70 d d 70/70 2xg
99HS-9507 b 70/70 70/25 70/70 UP g 70/70
d UP
KHF-84-104133-EA-8809-00002-0001
g g
300/70 g 300/70
70/25 70/70 d 70/70 70/70 70/70
d d d
e 300/300
70/70 b b
b ELECTRICAL EARTH PIT CO-ORDINATES:
300/70 UP d d 70/25 70/70 d 70/70 70/70 d
70/25
UP UP UP
UP d 70/70
d EARTH PIT EAST NORTH
b e 70/70 70/70
d 70/70 e UP TAG NUMBER
d
UP UP
d
2 3110-05-EEP-0001 589.155 354.870
e e 70/70 UP
C03 3110-05-EEP-0002 597.730 385.715
d d
d 70/70
d d 3110-05-EEP-0003 599.955 405.980
S68 70/25
70/70 3110-05-EEP-0004 583.200 410.700
LV LV IDB
2N LV LV
d
2U 2V 2W
e
INSTRUMENT EARTH CABLE RISER 300/300
70/25
b
TRENCH b FROM EL. 99.420 b LIGHTNING EARTH PIT CO-ORDINATES:
TO EL. 105.050
FOR CONTINUATION, REFER DWG. NO.
70/25 b 3
d d d d LIGHTNING PIT
KHF-84-104133-EA-8809-00003-0001
PBS NO:3105-02
7. LOCATION OF EARTHING CABLE/TERMINATION SHOWN SHALL BE ALTERED (IF REQUIRED), TO SUITE ACTUAL SITE CONDITION. PROJECT DRAWING REVISION
PCAP CONTROL ID # -
6. REFER CIVIL UG SERVICES LAYOUT FOR SLEEVE DETAILS. KHF- 25- 104133- EA- 2305- 00004- 0001 IN CASE OF DEVIATIONS A MARKED UP PRINT SHALL BE SENT TO THE PROJECT ENGINEER
5. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ELECTRICAL CABLE ROUTING LAYOUT. INSTRUMENT EARTHING SYSTEM DETAILS KHF- 00- 104133- IN- 4180- 00001- 0001 SCALE : CAD DRAWING
AREA:
0 1.25 2.5 3.75 5 6.25 7.5 8.75 10 11.25
4. THE SPACING BETWEEN EARTH ELECTRODES SHALL NOT BE LESS THAN THE DEPTH TO WHICH THEY ARE INSTALLED. KHF- 25- 104133- EA- 4025- 00005- 0001
3. WHEREVER POSSIBLE, EARTH CABLE SHALL BE RUN IN ELECTRICAL / INSTRUMENTATION / TELECOM CABLE TRENCHES. WHERE THIS IS CABLE ROUTING LAYOUT-SUBSTATION 1 KHF- 25- 104133- EA- 4006- 00002- 0001
SUB AREA: NO:
NOT POSSIBLE, THE EARTH CABLE SHALL BE BURIED IN SEPARATE TRENCH 300mm WIDE & 600mm DEEP. KHF- 00- 104133- MP- 4024- 00001- 0001
2. EARTH GRID SHALL BE OF STRANDED COPPER CONDUCTOR, PVC SHEATHED, COLOURED YELLOW/GREEN FOR SAFETY EARTH AND ELECTRICAL DESIGN BASIS KHF- 25- 104133- EA- 5507- 00001- 0001
DRWG.TYPE:
COLOURED GREEN FOR C&A CLEAN EARTH. DATE
APPROVED
WBS NO / PROJ.ENG. SPEC.ENG. AREA UNIT ORIGINATOR DISC. DOC. SEQ. SHT. PROJ. REV.
DESCRIPTION DRAWING NUMBER REV DESCRIPTION B.I. NO CODE CODE CODE CODE TYPE. NO. NO. CODE NO.
(DD.MM.YY)
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ALL CO-ORDINATES AND ELEVATIONS ARE IN METERS,UNLESS OTHERWISE SPECIFIED. BY PDO APPROVAL
DESCRIPTION:
MASTER DRAWING REVISION
NOTES: REFERENCE DRAWINGS
IN CASE OF DEVIATIONS A MARKED UP PRINT SHALL BE SENT TO COASTAL DESIGN OFFICE
LAST SAVED BY RAJKAMAL.G ON 13/07/2017 10:50 AM PLOTTED BY G, RAJKAMAL ON 7/13/2017 6:29 PM FILENAME: \\FIL011AAAMAAIND\JI-901X\ONSHORE\PROJECTS\ES-00006\OUTPUT\ENGINEERING\ELECTRICAL\VI.DESIGN & DRAFTING\A. DRAWINGS ISSUED FROM CHENNAI\CPF (ONPLOT)\08 EARTHING LAYOUT\SUBSTATIONS\SS-1\REV-04\NATIVE\KHF-25-104133-EA-8809-00002-0001_04.DWG