Daily Construction Report (DCR) : Project Manager

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 5

DAILY CONSTRUCTION REPORT (DCR)

Contractor : Saudi Amana Contracting Co. LLC


Package TitleVeolia Central Utilities & Valorisation Plant Package No: Veolia

WEATHER
Bright Sun Clear Overcast Rain Dust

To : Project Manager Sky


To 0 0 - 30 30 - 40 40 - 50 50 up

DCR # KJ-115-P-OP-DCR-67-00 Temp. o C


Still Mod.Still High
Date: Thursday, June 04, 2020 Wind
Dry Mod.Dry Humid

Humidity

MANPOWER CONSTRUCTION EQUIPMENT & VEHICLES


Discipline Amana Subcon. Total No. Description Amana Subcon. Total No.
A - Management & Supervision Personnel Earthwork equipment
Project Manager Civil 0 0
Construction Manager 1 1 Wheel Loader
HSE Site Manager 1 1
HSE Engineer, HSE Telescopic Handler 1 1
Planning Engineer Excavator 1 1
Project Manager MEP 1 1 JCB Backhoe loader 1 1
Project Engineer - Civil 1 1 Compactors 1 1
Site Engineer - Bobcat Skid Loader
QA/QC Engineers 1 1 Fork lift
Safety Officer 1 1 Dumper For SOG
Document Controler
Foremen Civil 2 2 Lifting equipment
Foreman - Mechanical (2), MEP Boom lift For Civil
Sr. Land Surveyor (1), 0 0 Scissor Lift Civil
Foreman - Electrical (2), MEP Mini Boom Lift MEP
Surveyer Engineer 1 1 Scissor Lift
Scissor Lift Diesel MEP
Scissor Lift Civil
Mobile Crane 50/Ton

Total - A 9
B - Workmen Amana Subcon. Total 4 0 4
B1 - Direct
Mason 1 1 Transporting equipment / Vehicles Amana Subcon. Total No.
Carpenter 10 10 Truck - Trailer
Steel Erector & Welder APK. Mob. Team 4 4 Bus 1 1
Steel Fixer 10 10 Truck with crane
Asst. QAQC
Civil Helper 12 12 Truck
Civil Chargehand Pick-up Civil 0 0
Scaffolder Bus 1 1
Office Cleaner ( Civil Helpers ) 2 2 Transit Mixer
Asst. Surveyors 1 1 Mobile Pump 1 1
Time keeper 1 1 Water Tanker 1 1
Office Boy 1 1
Safety Marshal 1 1
Carpenter ( Office Boy )
painter 3 3

Total - B1 46 0 46 4 0 4
B2 - Indirect
Plumber 1 1 Others Amana Subcon. Total No.
MEP Chargehand
Ductman / ( MEP Welder ) Survey equipment 2 2
Pipe Fitter MEP Table Circular saw
Driver (General purpose) 2 2 Dewatering equipment
Electrician MEP 1 1 Generators 4 4
MEP Helper Air Compressors Small & Big 1 1
Mechanic 1 1 Welding Machines 1 1
Operators 4 4
Bus Driver 1 1
Store keeper 1 1
Bar-cutting machines 1 1
Bar-bending machines 1 1
Power Float
Concrete Mixer
Concrete Vibrator
Jumping Compactor

Plate Compactor 1 1
Roller Compactor

Total - B2 11 0 11 Ride On Floor Cleaning Machine


Total - B 57
TOTAL - MANPOWER (A+B) 66 11 0 11
GRAND TOTAL-CONSTRUCTION EQUIP & VEHICLES 19

1/5
DAILY CONSTRUCTION REPORT (DCR)
Contractor : Saudi Amana Contracting Co. LLC
Package TitleVeolia Central Utilities & Valorisation Plant Package No: Veolia

Civil Work
Work Discription Location Date Started/Completed Quantity or % Complete

Casting Foundations of Admin Building Admin Building 21-May-20 85.0%


Excavation Works for Shredder Building (Stage 1) Shredder 30-May-20 90.0%
Surveying works for Lab Foundations Lab Building 1-Jun-20 4-Jun-20 100.0%
Shuttering Works for Foundation of Admin Admin Building 4-Jun-20 100.0%
Foundation Reinforcement Rebar of Admin Building Admin Building 14-May-20 4-Jun-20 100.0%
Column Neck Reinforcement Rebar of Admin Building (4 col Admin Building 1-Jun-20 90.0%

One Day Lookhead


Column Neck Formwork Admin Building
Excavation works for Shredder Building Shredder
Shuttering Works for Foundation of Lab Admin Building
Bitumen of Admin Foundation (Phase 2) Shredder
Concrete Pouring of Admin Foundation Admin Building
Concrete Pouring of Admin Footing column (Phase 1) Admin Building

MEP Work
Work Discription Location Date Started/Completed Quantity or % Complete

Contractor : Consultant :
Name: Abdulah Alkilani Name:
Signature: Signature:
Designation: Project Manager Designation:

2/5