ae eoRBES
Asset Management-
Periodic Maintenance Schedule of Control Valve
10_| Feed back line cleaning
11_| Path Restriction / Response adjustment screw cleaning
12_| Cleaning of feed back line
|Sr.No.| Parameters to be checked Frequency for checking various Parameters
A | Control valve Daily | Weekly | Monthly |Quartesly|1/2 Yearly] Annually
1_| Draining of AFR
2_[ AFR Filter cleaning
3 heck Instrument air quality
B_[ Actuator
4_| Diaph and seal kt inspection
5__[ Actuator spring inspection
C | Positioner
6 | Plot Valve cleaning / Checking
7 _| Calibration(Zero / Span)
8 | Pr. Gauge / Temp Gauge calibration
D_ | Control Valve
9 | Overhauing / checking / cleaning —
E | Roboter
Notes:
i | Control valve gasket replacement Each time itis opened for cleaning / maintenance
AMICL- 2 Plate 1 of 1
Energy Conservation | Environment | Process Efficiency www.forbesmarshall.com