B 01 Summary of Quantites B 11 PDF
B 01 Summary of Quantites B 11 PDF
1. GEOMETRIC DESIGN SHALL BE IN ACCORDANCE WITH DPWH DESIGN GUIDELINES CRITERIA AND STANDARDS VOLUME 4, 2015 EDITION.
NOTE:
2. FINAL PAVEMENT TYPE AND DESIGN SHALL BE IN ACCORDANCE WITH THE DESIGN GUIDELINES OF THE DPWH, BASED ON ACTUAL TEST
PURSUANT TO ITEM 6.4 OF ANNEX "B" OF THE REVISED IMPLEMENTING RULES AND REGULATIONS
RESULTS OF THE EXISTING SUBGRADE AND EMBANKMENT MATERIALS TO BE USED ALONG THE ACTUAL LENGTH OF THE APPROACHES. OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE RESPONSIBLE FOR
3. THE QUANTITIES OF ALL WORK ITEMS INVOLVED ARE SUBJECT TO INCREASE / DECREASE AS PER ACTUAL FIELD REQUIRMENT. VERIFICATION AND CHECKING OF QUANTITIES OF WORK ACCOMPLISHED BY THE CONTRACTOR AS
AGAINST THE APPROVED PLANS, SPECIFICATION AND PROGRAM OF WORKS.
THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY RESPONSIBLE FOR THE
FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY OF WORKMANSHIP
ACCOMPLISHED BY THE CONTRACTOR EXPECT FOR THOSE FAILURE DUE TO FAULTY DESIGN AS
PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE APPROVAL BY THE AUTHORIZED
GOVERNMENT OFFICIALS OF "AS-STAKED". REVISED OR "AS-BUILT" PLANS UNDERTAKEN/CHECKED
BY CONSTRUCTION SUPERVISION CONSULTANT NEITHER DIMINISHED THE RESPONSIBILITY OF
THE LATTER FOR THE TECHNICAL INTEGRITY OF THE SAID PLANS NOR TRANSFER ANY PART OF
THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.
LEONARDO R. ENRIQUEZ
PROJECT MANAGER
DSI ENGINEERING SERVICES / WOODFIELDS CONSULTANTS, INC. (JV)
PREPARED : SUBMITTED: PROJECT NAME AND LOCATION : CHECKED: REVIEWED: RECOMMENDED: APPROVED: SHEET NO.
KAY TIALO BRIDGE
CRISTO, SAN JOSE (SEE COVER SHEET) (SEE COVER SHEET)