Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

125550

7800 3600 7700 5580 2210 6275 8200 8200 8170 600 8165 3300 3800 2175 2025 3550 4450 4450 3550 4200 3800 3265 2235 5650 2250 5750 4600

1 1
A304
A202
A305

1
Key Plan:

13840 8200 3200 4600 13840

1670

1670
1750

1750
BALCONY BALCONY BALCONY BALCONY

A
1300

1 B

9675

9675
A301 1750 11740 7600 7600 11740 1750
N
5000

7750

7750

7750
7200
1B5 1B6 2B7
2B7

10000 3100 11775 6105

495
C BALCONY BALCONY BALCONY
1660

NOTES:

2405
2445
2355 1740

THIS DRAWING IS THE PROPERTY OF THE DESIGN


D 201 202 203 204
PROFESSIONAL AND MAY NOT BE REPRODUCED OR

1850
CORRIDOR USED

BALCONY
BALCONY
L2T2-10 WITHOUT HIS WRITTEN PERMISSION.

3875

3875
11400 7575
FHC
7950

E T2 WMR T2 TEL CUP SM


T1 FIRE LIFT LOBBY
10535

T2 G.C. FR AIR
L2T2-04 L2T2-05 SM

2200
L2T2-07 T2-L5 L2T2-08 * THIS DRAWING INDICATES THE ARCHITECTURAL
2400 UP
8475

ST - 03 3650 UP DN CONCEPT

TOWER 2 LIFT LOBBY


ELEC
L2T2-02 RS T2-L1 AND DESIGN INTENT ONLY. ALL STRUCTURE & MEP
4955

2B3 1B1 2B4 SERVICES SHOWN ARE PURELY INDICATIVE AND

14835
2450 150 8640 8640 2450

11900

3650

3650
2750

4460
5700
MUST BE

L2T2-01
3000
T2-L4
STAIR VERIFIED AND CO-ORDINATED BY QUALIFIED
T2-F/SL PRES AGENCIES PRIOR
T2 ELEC. RM.
T2-L2 ST - 04 3B3
0203 0204 TO THE COMMENCEMENT OF ANY WORK ON SITE.

F L2T2-03
FHC

UP DN UP L2T2-06
T1 WMR
L2T1-04

ST-01 T2-L3
1

17395
L2T1-02 0205 LB PR CHW EXT MEP RISER RM.
3045

STAIR FR AIR
DN AIR L2T2-09
PRES SM SM RS

17395
A302 3B3 FHC
T1 TEL CUP
L2T1-05
BALCONY

7850 208 +29.800 FFL 205

1850
ELEC STAIR 207 +29.725 SSL 206 CORRIDOR

G 1850 2550 1850


4700

RS PRES L2T2-10
2750

900
T1 G.C.
T1 ELEC. RM.
0202 L2T1-06 L2T1-07
5395

A203 2 2380
CORRIDOR

13695

13695
3050
44995

1
11800

A203
L2T1-10

2B1 T1-L3 T1-L4 T1-L5


3050

7200
2B6 2B5

7745
2300

H
TOWER 1
7740 11800 11800 7740
2750

LIFT LOBBY
CORRIDOR

7800

L2T1-01
2760

1B3
L2T1-10

BALCONY

+29.800 FFL
BALCONY

+29.725 SSL
4760
4350

7850
SM
SM
SM

J LB
PR
BALCONY
BALCONY

3500
SM

T1-L2 T1-L1
0206
2050

FR

2300
AIR BALCONY BALCONY BALCONY

1670
CHW

K T1 FIRE LIFT LOBBY


RS

EXT 9265 4625 7950 12575 9265


ISSUED FOR
2900

T1-F/SL AIR
L2T1-08

CONSTRUCTION
3650

FR

L STAIR PRES
AIR
T1 MEP RISER RM.
FHC

L2T1-09
4400

UP
3B1 ST-02
1650 L2T1-03
DN

M 0208 0207
700

0201
16950

16950

3B1
18950

18940

N
4150

2B2
9890

P 7850 11200 7850


4245

1
A303

Q
2400
1750

1750

BALCONY BALCONY BALCONY


10050 3050 8050 9835
1

A201

N
0 RPE ISSUED FOR CONSTRUCTION 27-12-2018

0 RPE CONTRACT DRAWINGS 26-12-2018

QI
BL
A
Rev By Description Date

CLIENT

CONSULTANT

LEVEL 2-10 TYPICAL FLOOR PLAN


1 1 : 200
INTERIOR DESIGNERS

PROJECT TITLE

Sunrise Bay at Emaar Beachfront


Plot Z02.B18
LOCATION DUBAI PLOT # SH1.Z02.B18
BLOCK

DRAWING TITLE

LEVEL 2-10 TYPICAL


FLOOR PLAN
NAME PROJECT STAGE
TD
DESIGNED BY
DEVELOPED BY RPE Project No.:
COORDINATED BY CCVA
CHECKED BY CCVA D432
VERIFIED BY GEA SCALE 1 : 200

DRAWN BY ACO,GEA,JAS DRWG. SIZE A1


APPROVED BY PE DATE Issue Date

DRWG. No. REVISION No.

A107

You might also like