01 02 03 04 05 06 07 08 09 10 11 125550

12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
7800 3600 7700 5580 2210 6275 8200 8200 8170 600 8165 3300 3800 2175 2025 3550 4450 4450 3550 4200 3800 3265 2235 5650 2250 5750 4600

1 1
A202
A304 A305
Key Plan:
1

22440 2800 16800

A
1300

1 B N

9640
A301

10440
ROOF OF MEP
ROOF OF MEP
5000

8000
+118.925 FFL +118.925 FFL
10300 2750 8500 7705 +118.725 SSL +118.725 SSL
NOTES:

11750
OPEN BELOW
THIS DRAWING IS THE PROPERTY OF THE DESIGN
C PROFESSIONAL AND MAY NOT BE REPRODUCED OR
2355 1740

USED

1805
WITHOUT HIS WRITTEN PERMISSION.

D 14140
+120.475 FFL
+120.400 SSL
+120.475 FFL
+120.400 SSL CORRIDOR
LRT2-04
ROOF OF GSM
* THIS DRAWING INDICATES THE ARCHITECTURAL
8595

+120.600 FFL
CONCEPT
7900

+120.400 SSL

E
SM

SM
FR AIR AND DESIGN INTENT ONLY. ALL STRUCTURE & MEP
ROOF OF MEP T2 FIRE LIFT SERVICES SHOWN ARE PURELY INDICATIVE AND
DN

6660
DN
+118.925 FFL MACHINE ROOM MUST BE
+118.725 SSL LRT2-03
9600 VERIFIED AND CO-ORDINATED BY QUALIFIED
4955

ROOF OF MEP OPEN T2 LIFT MACHINE ROOM AGENCIES PRIOR


TO THE COMMENCEMENT OF ANY WORK ON SITE.
15600

+118.925 FFL BELOW LRT2-02

13245
+118.725 SSL
+120.475 FFL STAIR 11240
+120.400 SSL PRES
12440
7405 2600
ST-04
LRT2-01
GREEN BUILDING NOTES:

1 F LB PR CHW EXT T2 MEP RISER RM.


SOLAR REFLECTIVE INDEX

- EXTERNAL PAVING TO BE AT LEAST 29


3045

FR AIR
RS AIR BELOW
SM SM
A302 - SHADE STRUCTURE SRI TO BE AT LEAST 29

G OPEN BELOW

10295
5395

A203 2 10050
OPEN BELOW

13995
2750
44995

9650
T1 LIFT 1 A203
2585

11780
8150 MACHINE ROOM
200

MRT1-02

H +120.475 FFL
7405

+120.400 SSL
2760

1800
SM +120.535 FFL

J
SM SM
LB +120.400 SSL
PR
SM
ISSUED FOR
2050

FR
ROOF OF MEP AIR CHW

1700
+118.925 FFL RS
EMAAR SIGN

K
+118.725 SSL

5400 EXT
CONSTRUCTION
CORRIDOR

7290 4900 2750 18050 8990


2900

2600

AIR
T1 FIRE LIFT
MRT1-04

+120.535 FFL
MACHINE ROOM +120.400 SSL
MRT1-03 FR

L STAIR PRES
AIR
ROOM BELOW
T1 MEP RISER
EMAAR SIGN
4400

ST-02
MRT1-01
22200
21700

DN

M
700

ROOF OF GSM
+120.600 FFL

N +120.400 SSL
4150

OPEN BELOW
10090

10240

P OPEN BELOW
4245

1
A303

Q
1550

+120.535 FFL
+120.400 SSL

500 8595 2745 200 16250 1680


1

A201

0 RPE ISSUED FOR CONSTRUCTION 27-12-2018

N
0 RPE CONTRACT DRAWINGS 26-12-2018

Rev By Description Date

CLIENT

QI
BL
A
CONSULTANT

INTERIOR DESIGNERS

MACHINE ROOM FLOOR PLAN


1 1 : 200
PROJECT TITLE

Sunrise Bay at Emaar Beachfront


Plot Z02.B18
LOCATION DUBAI PLOT # SH1.Z02.B18
BLOCK

DRAWING TITLE

MACHINE ROOM FLOOR


PLAN
NAME PROJECT STAGE
TD
DESIGNED BY
DEVELOPED BY RPE Project No.:
COORDINATED BY CCVA
CHECKED BY CCVA D432
VERIFIED BY GEA SCALE 1 : 200

DRAWN BY ACO,GEA,JAS DRWG. SIZE A1


APPROVED BY PE DATE Issue Date

DRWG. No. REVISION No.

A113