Professional Documents
Culture Documents
PSC 35m - 4 Girders - 14.5m Width - M50 (As Per Shuttering) (Ch-109+700) PDF
PSC 35m - 4 Girders - 14.5m Width - M50 (As Per Shuttering) (Ch-109+700) PDF
PSC 35m - 4 Girders - 14.5m Width - M50 (As Per Shuttering) (Ch-109+700) PDF
Client :-
National Highways Authority of India
(Ministry of Road Transport & Highways)
Authority Engineer:-
LEA Associates South Asia Pvt. Ltd.
LEA Associates South Asia
Pvt. Ltd.
B-1, E-27, Mohan Cooperative
Industrial Estate Mathura Road
New Delhi-110044, India
B-1, E-27, Mohan Cooperative Industrial Estate Mathura Road
Email : lasa@lasaindia.com
Proof Consultant:-
Infrastructure Development Consultants
141, Sahayog Vihar, Apex Bank Colony,
E- 8 Extension, Near Gulmohar Colony,
Bhopal (M.P) – 462039,
Phone:0755-4252393
E-mail: idc@idc-india.com, idcbpl@gmail.com
Nitya Nayra Civil Solution H.N.-104,Indus Empire Phase-II, E-8, Bawadiya Kala Bhopal
Phone:0755-4944349
Pvt. Ltd. Bhopal (M.P.) Phone:0755-4944349
Design ch-109+720
Design of PSC Girder
INDEX
2 Section Properties
3 Load Calculations
8 Check for Outer Girder Stresses with Superior Load Combination gsup=1.1
9 Check for Outer Girder Stresses with Inferior Load Combination ginf=0.9
10 Check for Inner Girder Stresses with Superior Load Combination gsup=1.1
11 Check for Inner Girder Stresses with Inferior Load Combination ginf=0.9
0.175 0.175
ht1 0.075 0.0181
0.3625 0.0875
0.275
0.175
0.2
Web Thickening
0.426
0.562 c/L
0.825 0.275
0.55
c/L P. brg
bw m 0.825 0.825 0.825 0.825 0.825 0.55126 0.275 0.275 0.275 0.275 0.275
MATERIAL USED :
Grade of Reinforcement = 500
fyk = 500 Mpa
Modulus of Elasticity Es = 200000 Mpa
Precast Beam = 50
fck = 50
fcm = 60 MPa
Ecm = 35000 MPa
ANALYSES ASSUMPTION
Enviromental parameters
Relative humidity = 57.5 %
Exposure condition = Moderate
TEMPERATURE
Coefficent of thermal expansion = 0.000012 /oC
Creep
Cross-sectional Area Ac = 1.517485 m2
Perimeter in contact with atmosphere u = 8.920899 m (Composite Outer Girder at Mid Span Considered)
Notational size ho 2Ac/u = 340.2089 mm
f (¥) = 1.40441 (Refer Appendix B)
@ 1.544851 *(Increased by 10% on the conservative side)
Ecm' = 13753.26 N/mm2
Rare Combination
Max permissible Stress in Concrete = 0.48*fck = 24 Mpa
Max permissible tensile Stress in Concrete fctm = -3.5156 Mpa (fctm ( mean tensile strength))
c/L Brg.
CRASH BARRIER 0.5
14.5
13.5
33.4
34.95
PLAN
14.5
0.22
0.9
1.25 Sq 3 Sq
1.33022 Sk 3.192533 Sk
Super-structure Cross-section
1 1
1 0.175 1 0.175
2 0.075 2 0.0181
3
4 0.175
5 0.2
0.825 0.825
Section At unit Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
web width bw m 0.825 0.825 0.825 0.825 0.825 0.5513 0.275 0.275 0.275 0.275 0.275
Area A m2 1.9297 1.9297 1.9297 1.9297 1.9297 1.4394 0.9447 0.9447 0.9447 0.9447 0.9447
IZZ m4 0.872 0.872 0.872 0.872 0.872 0.7401 0.6069 0.6069 0.6069 0.6069 0.6069
Iyy m4 0.1143 0.1143 0.1143 0.1143 0.1143 0.0727 0.0306 0.0306 0.0306 0.0306 0.0306
yb m 1.1677 1.1677 1.1677 1.1677 1.1677 1.16 1.1524 1.1524 1.1524 1.1524 1.1524
yt m 1.1323 1.1323 1.1323 1.1323 1.1323 1.14 1.1476 1.1476 1.1476 1.1476 1.1476
lo = Min 33.4
32.5 + 2.142
*/ (Effective depth assumed 0.85 times of Overall depth)
lo = 33.4 m
bef
bef1 bef2
2.75 b= 3
1.25 3
beff1,2 = 3.6125 m
beff = 3m
beff1 = 3.5625 m
beff2 = 3.6125 m
beff = 2.75 m
A) OUTER GIRDER :
(Equivalent to Precast Beam grade) (Equivalent to Precast Beam grade)
2.75 @ 2.60362 2.75 @ 2.60362
1 1 0.22 1 1 0.22
2 0.175 2 0.175
3 0.075 3 0.0181
4
2.52 2.52
0.275 2.3 2.3
4
5 0.175
6 0.2
0.825 0.825
B) INNER GIRDER :
(Equavelent to Precast Beam grade) (Equavelent to Precast Beam grade)
3@ 2.84032 3@ 2.84032
1 1 0.22 1 1 0.22
2 0.175 2 0.175
3 0.075 3 0.0181
4
2.52 2.52
0.275 2.3 2.3
4
5 0.175
6 0.2
0.825 0.825
CALCULATING IST MOMENT OF INERTIA OF PRECAST BEAM & COMPOSITE SECTION ABOVE CG. OF COMPOSITE SECTION :
A) OUTER GIRDER :
(Equivalent to Precast Beam grade) (Equivalent to Precast Beam grade)
2.75 @ 2.60362 2.75 @ 2.60362
1 1 0.22 1 1 0.22
2 0.175 2 0.175
3 0.075 3 0.0181
4
2.52 2.52
0.275 2.3 2.3
4
5 0.175
6 0.2
0.825 0.825
*/Section at support
Cg from top of deck = 1.06798 m
B D A cgy' cgy'cg A*cgy'cg
Element No.
Factor m m Nos. m2 m m m3
1 1 2.60362 0.22 1 0.5728 0.11 0.95798 0.54873
2 1 0.0875 0.175 2 0.03063 0.3075 0.76048 0.02329
3 0.5 0.0875 0.0181 2 0.00158 0.40103 0.66695 0.00106
4 1 0.825 0.84798 1 0.69959 0.64399 0.42399 0.29662
*/Section at support
Cg from top of deck = 1.06798 m
B D A cgy' cgy'cg A*cgy'cg
Element No.
Factor m m Nos. m2 m m m3
2 1 0.0875 0.175 2 0.03063 0.0875 0.98048 0.03003
3 0.5 0.0875 0.0181 2 0.00158 0.18103 0.88695 0.0014
4 1 0.825 0.84798 1 0.69959 0.42399 0.64399 0.45053
B) INNER GIRDER :
(Equavelent to Precast Beam grade) (Equavelent to Precast Beam grade)
3@ 2.84032 3@ 2.84032
1 1 0.22 1 1 0.22
2 0.175 2 0.175
3 0.075 3 0.0181
4
2.52 2.52
0.275 2.3 2.3
4
5 0.175
6 0.2
0.825 0.825
*/Section at support
Cg from top of deck = 1.04846 m
B D A cgy' cgy'cg A*cgy'cg
Element No.
Factor m m Nos. m2 m m m3
1 1 2.84032 0.22 1 0.62487 0.11 0.93846 0.58641
2 1 0.0875 0.175 2 0.03063 0.3075 0.74096 0.02269
3 0.5 0.0875 0.0181 2 0.00158 0.40103 0.64742 0.00103
4 1 0.825 0.82846 1 0.68348 0.63423 0.41423 0.28311
*/Section at support
Cg from top of deck = 1.04846 m
B D A cgy' cgy'cg A*cgy'cg
Element No.
Factor m m Nos. m2 m m m3
2 1 0.0875 0.175 2 0.03063 0.0875 0.96096 0.02943
3 0.5 0.0875 0.0181 2 0.00158 0.18103 0.86742 0.00137
4 1 0.825 0.82846 1 0.68348 0.41423 0.63423 0.43348
Precast Beam
4.82427 t/m
2.36172 t/m
c/L
Shear Force T -0 0.72364 2.65335 43.7076 42.8055 35.4691 30.23 29.5805 19.7204 9.86018 -4E-15
UDL over Girder (Inner Girder) = 1.716 t/m Weight on Outer Girder
UDL over Girder (Outer Girder) = 1.573 t/m Intermediate Diaphragm (1 nos) 2.51213 t
Deck -0.0398 -0.1106 -0.4724 5.08724 9.90941 52.1874 90.0144 95.4919 164.038 205.165 218.875
Diaphragm 0 0.247 0.343 2.26 2.343 3.982 7.479 6.808 20.584 30.503 33.364
Bending Moment Tm -0.0398 0.1364 -0.1294 7.34724 12.2524 56.1694 97.4934 102.3 184.622 235.668 252.239
Shear Force T 1.60999 1.84594 2.47514 27.1901 26.896 24.1558 21.3905 20.9579 14.3906 7.82334 1.25606
Deck Tm -0.0434 -0.1207 -0.5153 5.54972 10.8103 56.9317 98.1976 104.173 178.95 223.817 238.772
Diaphragm Tm 0 0.042 0.042 -0.467 -0.459 4.73 8.353 6.585 19.503 29.794 29.086
Bending Moment Tm -0.0434 -0.0787 -0.4733 5.08272 10.3513 61.6617 106.551 110.758 198.453 253.611 267.858
Shear Force T 2.89823 3.15563 3.84203 30.8038 30.4829 27.4937 24.4769 24.005 16.8407 9.67643 2.51213
Precast Beam Tm -0 -0.0543 -0.7297 8.68949 16.7785 84.6457 142.077 150.301 253.216 314.966 335.549
Deck slab (Outer Girder) Tm -0.0398 0.1364 -0.1294 7.34724 12.2524 56.1694 97.4934 102.3 184.622 235.668 252.239
Deck slab (Inner Girder) Tm -0.0434 -0.0787 -0.4733 5.08272 10.3513 61.6617 106.551 110.758 198.453 253.611 267.858
Precast Beam T -0 0.72364 2.65335 43.7076 42.8055 35.4691 30.23 29.5805 19.7204 9.86018 -4E-15
Deck slab (Outer Girder) T 1.69049 1.93823 2.59889 28.5496 28.2408 25.3636 22.46 22.0058 15.1101 8.2145 1.31887
Deck slab (Inner Girder) T 3.04314 3.31341 4.03413 32.344 32.0071 28.8683 25.7008 25.2053 17.6828 10.1602 2.63773
Calculation of SIDL :
Density of Concrete = 2.2 t/m3
14.5
0.5 0 13.5 0 0.5
0.065 thick WC
0
Footpath weight = 0 t/m
0.0001
Height of the LL = 3 m
Height of crash barrier above deck slab = 1.1 m
Exposed height of the train = 1.9 m
Exposed area of the LL from left span = 66.5 m2
Design wind speed is VZ = 39.594 m/s
Wind pressure is PZ = 0.9406 kN/m2
Therefore,
Area of Live load to be acted upon by wind force , A1 (Trans)
= 66.5 m2
Area of Superstr to be acted upon by wind force , A1 (Trans)
= 126.7 m2
Gust Factor, G = 2
Drag Coefficient, CD (For live load) = 1.2 (Cl. 209.3.6 - IRC:6)
Drag Coefficient, CD (For Superstr) = 1.95
PRESTRESS-CABLE DETAILS
19-T-13/S system detail
= 1861 N/mm2
Ultimate breaking strength of one strand = 183.7 kN
Nominal dia of strand = 12.7 mm
Nominal Area of strand = 98.71 mm2
Total Nos. of strand = 19
UTS of cable = 349.03 Tonne
Area of a cable = 1875.5 mm2
= 258.11 Tonne
Stressing Stages :
Stage 1
At Day 14 Strand N-1 Ap UTS
Cable No. 1 2 3 Nos. Nos mm2 T
No. of tendons 19 19 10 48 2.5263 4738.1 881.76
% Jacking 100 100 100
Stage 2
At Day 28 Strands N-1 Ap UTS
Cable No. 4 5 Nos. Nos mm2 T
No. of tendons 15 15 30 1.5789 2961.3 551.1
% Jacking 100 100
At Anchorage Location
Minimum c/c of cable = 0.26 m 19 T 13 Cables
Minimum c/L of cable to concrete edge = 0.198 m
Anchor plate dimension = 0.3 x 0.300
0.5
7
0
6
7
0 0
6 5
0 0.5 2.3
5
0.2 4
4 0.5
0.2 3
3
0.5
0
0.125 0.3
J1
c/L
Origin
2x 0 1 1 3 3 5 5 17.1
z -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2
3x 0 1 1 2 2 3 3 17.1
z 0 0 0 0 0 0 0 0
4x 0 1 1 2 2 3 3 17.1
z 0 0 0 0 0 0 0 0
5x 0 1 1 2 2 3 3 17.1
z 0 0 0 0 0 0 0 0
6x 0 1 1 2 2 3 3 17.1
z 0 0 0 0 0 0 0 0
7x 0 1 1 2 2 3 3 17.1
z 0 0 0 0 0 0 0 0
Total Poh 978.04 978.51 978.91 984.63 990.66 991.6 1005.9 1020.2 1028.5
Total Poh 71.696 71.73 71.761 63.982 55.077 53.684 32.534 11.365 0
Cable NO. 1
Change in Angle due to : Change in Angle due to :
Vertical Profile Horizontal Profile
x (O) x(J1) Curve y a1 da1 Sda1 x (O) x(J1) Curve z a2 da2 Sda2
17.1 0 0.3 0.02174 0 17.1 0 0.2 0 0
16.1 1 Linear 0.27826 0.02174 0 0 16.1 1 Linear 0.2 0 0 0
5 12.1 Parab. 0.13194 0.00463 0.01711 0.01711 5 12.1 Linear 0.2 0 0 0
3 14.1 Parab. 0.12577 0.00154 0.00308 0.02019 3 14.1 Rev.Parab. 0.2 0 0 0
2 15.1 Parab. 0.125 0 0.00154 0.02174 2 15.1 Parab. 0.2 0 0 0
0 17.1 Linear 0.125 0 0 0.02174 0 17.1 Linear 0.2 0 0 0
Friction Effect
x(J1) a1 +a2 m*a k*x - (ma +k*x) P1(x) = Po* Avg. e-(mq+Kx)
prestress Cable Length
0 0 0 0 0 267.007
1 0 0 0.002 -0.002 266.473 266.74 1
12.1 0.01711 0.00291 0.0242 -0.027108767 259.866 263.17 11.1
14.1 0.02019 0.00343 0.0282 -0.031632967 258.693 259.279 2
15.1 0.02174 0.0037 0.0302 -0.03389507 258.108 258.401 1
17.1 0.02174 0.0037 0.0342 -0.03789507 257.078 257.593 2
Total = 18.1013 m
= 129.673 mm
Calculation of Slip :
Slip allowable = 6 mm
Say slip travels up to > 17.1 m 3.004
x(J1) Po(x) P1(x) (Po - P1) /2 1/2 Shaded Area
0 267.007 244.145 11.43093008
1 266.473 244.679 10.89744984 11.1642
12.1 259.866 251.286 4.289930181 84.29
14.1 258.693 252.459 3.116900024 7.40683
15.1 258.108 253.044 2.532371437 2.82464
17.1 257.078 254.074 1.502 4.03437
Total = 109.72
Total Shaded
219.44
area =
270
267.01
265
260
(Prestress)
257.08
255
254.07
250
245
244.15
240 (x)
0 2 4 6 8 10 12 14 16 18
After Friction Loss After slip Loss
Cable NO. 2
Change in Angle due to : Change in Angle due to :
Vertical Profile Horizontal Profile
x (O) x(J1) Curve y a1 da1 Sda1 x (O) x(J1) Curve z a2 da2 Sda2
17.1 0 0.3 0.02174 0 17.1 0 -0.2 0 0
16.1 1 Linear 0.27826 0.02174 0 0 16.1 1 Linear -0.2 0 0 0
5 12.1 Parab. 0.13194 0.00463 0.01711 0.01711 5 12.1 Linear -0.2 0 0 0
3 14.1 Parab. 0.12577 0.00154 0.00308 0.02019 3 14.1 Rev.Parab. -0.2 0 0 0
2 15.1 Parab. 0.125 0 0.00154 0.02174 2 15.1 Parab. -0.2 0 0 0
0 17.1 Linear 0.125 0 0 0.02174 0 17.1 Linear -0.2 0 0 0
Friction Effect
x(J1) a1 +a2 m*a k*x - (ma +k*x) P1(x) = Po *e-(mq + Kx)
Avg. prestress Cable Length
0 0 0 0 0 267.007
1 0 0 0.002 -0.002 266.473 266.74 1
12.1 0.01711 0.00291 0.0242 -0.027108767 259.866 263.17 11.1
14.1 0.02019 0.00343 0.0282 -0.031632967 258.693 259.279 2
15.1 0.02174 0.0037 0.0302 -0.03389507 258.108 258.401 1
17.1 0.02174 0.0037 0.0342 -0.03789507 257.078 257.593 2
Total = 18.1013 m
= 129.673 mm
Calculation of Slip :
Slip allowable = 6 mm
Say slip travels up to > 17.1 m 3.004
x(J1) Po(x) P1(x) (Po - P1) /2 1/2 Shaded Area
0 267.007 244.145 11.43093008
1 266.473 244.679 10.89744984 11.1642
12.1 259.866 251.286 4.289930181 84.29
14.1 258.693 252.459 3.116900024 7.40683
15.1 258.108 253.044 2.532371437 2.82464
17.1 257.078 254.074 1.502 4.03437
Total = 109.72
Total Shaded
219.44
area =
270
267.01
265
(Prestress)
260
257.08
255
254.07
250
245
244.15
(x)
240
0 2 4 6 8 10 12 14 16 18
After Friction Loss After slip Loss
Cable NO. 3
Change in Angle due to : Change in Angle due to :
Vertical Profile Horizontal Profile
x (O) x(J1) Curve y a1 da1 Sda1 x (O) x(J1) Curve z a2 da2 Sda2
17.1 0 0.8 0.08366 0 17.1 0 0 0 0
16.1 1 Linear 0.71615 0.08366 0 0 16.1 1 Linear 0 0 0 0
3 14.1 Parab. 0.12797 0.00595 0.07771 0.07771 3 14.1 Linear 0 0 0 0
2 15.1 Parab. 0.125 0 0.00595 0.08366 2 15.1 Rev.Parab. 0 0 0 0
2 15.1 Parab. 0.125 0 0 0.08366 2 15.1 Rev.Parab. 0 0 0 0
0 17.1 Linear 0.125 0 0 0.08366 0 17.1 Linear 0 0 0 0
Friction Effect
x(J1) a1 +a2 m*a k*x - (ma +k*x) P1(x) = Po *e-(mq + Kx)
Avg. prestress Cable Length
0 0 0 0 0 140.53
1 0 0 0.002 -0.002 140.249 140.39 1
14.1 0.07771 0.01321 0.0282 -0.041410434 134.829 137.539 13.1
15.1 0.08366 0.01422 0.0302 -0.044421391 134.424 134.627 1
15.1 0.08366 0.01422 0.0302 -0.044421391 134.424 134.424 0
17.1 0.08366 0.01422 0.0342 -0.048421391 133.887 134.156 2
Total = 18.12 m
= 129.1 mm
Calculation of Slip :
Slip allowable = 6 mm
Say slip travels up to > 17.1 m 0.249
x(J1) Po(x) P1(x) (Po - P1) /2 1/2 Shaded Area
0 140.53 126.996 6.767038385
1 140.249 127.277 6.486259313 6.62665
14.1 134.829 132.696 1.066477232 49.4704
15.1 134.424 133.102 0.661122264 0.8638
15.1 134.424 133.102 0.661122264 0
17.1 133.887 133.638 0.1245 0.78562
Total = 57.7465
Total Shaded
115.493
area =
145
140.53
140
(Prestress)
133.89
135
133.64
130
127.00
(x)
125
0 2 4 6 8 10 12 14 16 18
After Friction Loss After slip Loss
Cable NO. 4
Change in Angle due to : Change in Angle due to :
Vertical Profile Horizontal Profile
x (O) x(J1) Curve y a1 da1 Sda1 x (O) x(J1) Curve z a2 da2 Sda2
17.1 0 1.3 0.12053 0 17.1 0 0 0 0
16.1 1 Linear 1.17888 0.12053 0 0 16.1 1 Linear 0 0 0 0
3 14.1 Parab. 0.32929 0.00859 0.11194 0.11194 3 14.1 Linear 0 0 0 0
2 15.1 Parab. 0.325 0 0.00859 0.12053 2 15.1 Rev.Parab. 0 0 0 0
2 15.1 Parab. 0.325 0 0 0.12053 2 15.1 Rev.Parab. 0 0 0 0
0 17.1 Linear 0.325 0 0 0.12053 0 17.1 Linear 0 0 0 0
Friction Effect
x(J1) a1 +a2 m*a k*x - (ma +k*x) P1(x) = Po *e-(mq + Kx)
Avg. prestress Cable Length
0 0 0 0 0 210.795
1 0 0 0.002 -0.002 210.374 210.584 1
14.1 0.11194 0.01903 0.0282 -0.047230004 201.071 205.722 13.1
15.1 0.12053 0.02049 0.0302 -0.050690257 200.376 200.723 1
15.1 0.12053 0.02049 0.0302 -0.050690257 200.376 200.376 0
17.1 0.12053 0.02049 0.0342 -0.054690257 199.576 199.976 2
Total = 18.1417 m
= 128.835 mm
Calculation of Slip :
Slip allowable = 6 mm
Say slip travels up to = 16.066 m -1.034
x(J1) Po(x) P1(x) (Po - P1) /2 1/2 Shaded Area
0 210.795 189.184 10.80530327
1 210.374 189.606 10.38413466 10.5947
14.1 201.071 198.909 1.080905715 75.096
15.1 200.376 199.603 0.386353226 0.73363
15.1 200.376 199.603 0.386353226 0
16.066 199.99 199.99 0 0.18661
Total = 86.611
Total Shaded
173.222
area =
215
210.79
210
(Prestress)
205
200 199.58
199.99
195
190 189.18
185 (x)
0 2 4 6 8 10 12 14 16 18
After Friction Loss After slip Loss
Cable NO. 5
Change in Angle due to : Change in Angle due to :
Vertical Profile Horizontal Profile
x (O) x(J1) Curve y a1 da1 Sda1 x (O) x(J1) Curve z a2 da2 Sda2
17.1 0 1.8 0.15708 0 17.1 0 0 0 0
16.1 1 Linear 1.64161 0.15708 0 0 16.1 1 Linear 0 0 0 0
3 14.1 Parab. 0.53062 0.01123 0.14585 0.14585 3 14.1 Linear 0 0 0 0
2 15.1 Parab. 0.525 0 0.01123 0.15708 2 15.1 Rev.Parab. 0 0 0 0
2 15.1 Parab. 0.525 0 0 0.15708 2 15.1 Rev.Parab. 0 0 0 0
0 17.1 Linear 0.525 0 0 0.15708 0 17.1 Linear 0 0 0 0
Friction Effect
x(J1) a1 +a2 m*a k*x - (ma +k*x) P1(x) = Po *e-(mq + Kx)
Avg. prestress Cable Length
0 0 0 0 0 210.795
1 0 0 0.002 -0.002 210.374 210.584 1
14.1 0.14585 0.02479 0.0282 -0.052994119 199.915 205.144 13.1
15.1 0.15708 0.0267 0.0302 -0.056903646 199.135 199.525 1
15.1 0.15708 0.0267 0.0302 -0.056903646 199.135 199.135 0
17.1 0.15708 0.0267 0.0342 -0.060903646 198.34 198.737 2
Total = 18.1712 m
= 128.631 mm
Calculation of Slip :
Slip allowable = 6 mm
Say slip travels up to = 14.761 m -2.339
x(J1) Po(x) P1(x) (Po - P1) /2 1/2 Shaded Area
0 210.795 188.004 11.39566837
1 210.374 188.425 10.97449976 11.1851
14.1 199.915 198.884 0.515611028 75.2602
14.761 199.399 199.399 0 0.17041
14.761 199.399 199.399 0 0
14.761 199.399 199.399 0 0
Total = 86.6157
Total Shaded
173.231
area =
215
210.79
210
205
(Prestress)
200
198.34
199.13
195
190 188.00
(x)
185
0 2 4 6 8 10 12 14 16 18
Cable NO. 6
Change in Angle due to : Change in Angle due to :
Vertical Profile Horizontal Profile
x (O) x(J1) Curve y a1 da1 Sda1 x (O) x(J1) Curve z a2 da2 Sda2
17.1 0 1.8 0.15708 0 17.1 0 0 0 0
16.1 1 Linear 1.64161 0.15708 0 0 16.1 1 Linear 0 0 0 0
3 14.1 Parab. 0.53062 0.01123 0.14585 0.14585 3 14.1 Linear 0 0 0 0
2 15.1 Parab. 0.525 0 0.01123 0.15708 2 15.1 Rev.Parab. 0 0 0 0
2 15.1 Parab. 0.525 0 0 0.15708 2 15.1 Rev.Parab. 0 0 0 0
0 17.1 Linear 0.525 0 0 0.15708 0 17.1 Linear 0 0 0 0
Friction Effect
x(J1) a1 +a2 m*a k*x - (ma +k*x) P1(x) = Po *e-(mq + Kx)
Avg. prestress Cable Length
0 0 0 0 0 0
1 0 0 0.002 -0.002 0 0 1
14.1 0.14585 0.02479 0.0282 -0.052994119 0 0 13.1
15.1 0.15708 0.0267 0.0302 -0.056903646 0 0 1
15.1 0.15708 0.0267 0.0302 -0.056903646 0 0 0
17.1 0.15708 0.0267 0.0342 -0.060903646 0 0 2
Total = 18.1712 m
= 0 mm
Calculation of Slip :
Slip allowable = 0 mm
Say slip travels up to = 14.7615 m -2.3385
x(J1) Po(x) P1(x) (Po - P1) /2 1/2 Shaded Area
0 0 0 0
1 0 0 0 0
14.1 0 0 0 0
14.7615 0 0 0 0
14.7615 0 0 0 0
14.7615 0 0 0 0
Total = 0
Total Shaded area0 =
slip = 0= 0 mm OK
36572.1
5
(Prestress)
Cable NO. 7
Change in Angle due to : Change in Angle due to :
Vertical Profile Horizontal Profile
x (O) x(J1) Curve y a1 da1 Sda1 x (O) x(J1) Curve z a2 da2 Sda2
17.1 0 1.8 0.15708 0 17.1 0 0 0 0
16.1 1 Linear 1.64161 0.15708 0 0 16.1 1 Linear 0 0 0 0
3 14.1 Parab. 0.53062 0.01123 0.14585 0.14585 3 14.1 Linear 0 0 0 0
2 15.1 Parab. 0.525 0 0.01123 0.15708 2 15.1 Rev.Parab. 0 0 0 0
2 15.1 Parab. 0.525 0 0 0.15708 2 15.1 Rev.Parab. 0 0 0 0
0 17.1 Linear 0.525 0 0 0.15708 0 17.1 Linear 0 0 0 0
Friction Effect
x(J1) a1 +a2 m*a k*x - (ma +k*x) P1(x) = Po *e-(mq + Kx)
Avg. prestress Cable Length
0 0 0 0 0 0
1 0 0 0.002 -0.002 0 0 1
14.1 0.14585 0.02479 0.0282 -0.052994119 0 0 13.1
15.1 0.15708 0.0267 0.0302 -0.056903646 0 0 1
15.1 0.15708 0.0267 0.0302 -0.056903646 0 0 0
17.1 0.15708 0.0267 0.0342 -0.060903646 0 0 2
Total = 18.1712 m
= 0 mm
Calculation of Slip :
Slip allowable = 0 mm
Say slip travels up to > 17.1 m 11.195
x(J1) Po(x) P1(x) (Po - P1) /2 1/2 Shaded Area
0 0 -11.195 5.5975
1 0 -11.195 5.5975 5.5975
14.1 0 -11.195 5.5975 73.3273
15.1 0 -11.195 5.5975 5.5975
15.1 0 -11.195 5.5975 0
17.1 0 -11.195 5.5975 11.195
Total = 95.7173
Total Shaded
191.435
area =
0 0.00 0.00
0 2 4 6 8 10 12 14 16 18
-5
(Prestress)
-10
-11.20
-11.20
-15 (x)
Cable NO : 7
x(J1) Po(x) Poh(x) Pov(x)
m Tonne Tonne Tonne
0 0 0 0
1 0 0 0
14.1 0 0 0
15.1 0 0 0
15.1 0 0 0
17.1 0 0 0
17.1 0 0 0
Cable NO : 7
x(J1) P1(x) P1h(x) P1v(x)
m Tonne Tonne Tonne
0 -11.195 -11.0572 -1.7513
1 -11.195 -11.0572 -1.7513
14.1 -11.195 -11.1943 -0.1257
15.1 -11.195 -11.195 0
15.1 -11.195 -11.195 0
17.1 -11.195 -11.195 0
17.1 -11.195 -11.195 0
SECTION PROPERTIES
Sections Unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Section at 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
Properties of Precast Section
Area m2 1.9297 1.9297 1.9297 1.4394 0.9447 0.9447 0.9447 0.9447 0.9447
I gross m4 0.872 0.872 0.872 0.7401 0.6069 0.6069 0.6069 0.6069 0.6069
yb m 1.1677 1.1677 1.1677 1.16 1.1524 1.1524 1.1524 1.1524 1.1524
1 Tonne 266.94 266.94 266.94 266.95 266.96 266.96 266.99 267.01 267.01
2 Tonne 266.94 266.94 266.94 266.95 266.96 266.96 266.99 267.01 267.01
3 Tonne 140.04 140.04 140.04 140.1 140.16 140.17 140.33 140.48 140.53
4 Tonne 0 0 0 0 0 0 0 0 0
5 Tonne 0 0 0 0 0 0 0 0 0
Total (P1oh) Tonne 673.93 673.93 673.93 674 674.09 674.1 674.3 674.49 674.54
Weighted Average of pre-stress force Tonne 673.93 673.93 673.96 674.04 674.09 674.2 674.4 674.52
Total (F1h) Tonne 615.27 615.55 615.8 618.61 621.51 621.96 628.85 635.7 641.79
Eccen soffit m 0.3891 0.3818 0.3753 0.3182 0.268 0.2608 0.1745 0.1308 0.125
Pre-stress loss Tonne 58.661 58.374 58.122 55.386 52.574 52.134 45.455 38.789 32.757
% Loss % 8.7044 8.6618 8.6245 8.2175 7.7993 7.7339 6.741 5.7508 4.8562
Prestressing force & their eccentricity from cg. of section of Stage I cables :
Sections Unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Section at 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
Total (F1h) Tonne 615.27 615.55 615.8 618.61 621.51 621.96 628.85 635.7 641.79
eF m 0.7785 0.7859 0.7923 0.8419 0.8844 0.8916 0.9779 1.0215 1.0274
eFc m 1.0629 1.0702 1.0767 1.221 1.3591 1.3663 1.4526 1.4963 1.5021
Material properties :
1) Losses due to Elastic shortening : At day 14
loss in pre-stres force = 0.5*Ep/Ec*sav.*(N-1)*As
N-1 = Total Nos. of cable -1 = 2.5263 Nos
As = Area of one cable = 1875.5 mm2
F1h = Horizontal component of pre-stressing force after friction & slip loss
eF = Eccentricity of pre-stressing force from cg. Precast section
eFc = Eccentricity of pre-stressing force from cg. Composite section
sc1 = Stress in Concrete at cg. of pre-stressing force. due to pre-stress
sc2 = Stress in Concrete at cg. of pre-stressing force, due to permanent loads at particular stage.
sc3 = Net stress in Concrete at cg. of pre-stressing force
MSWG = Bending Moment due to selfweight of girder at section x
Permanent Load stresses sc2 N/mm2 0.0065 -0.0783 -0.1525 -0.9629 -2.0704 -2.208 -4.0799 -5.3015 -5.6801
Net stress sc3 N/mm2 7.4714 7.4713 7.4722 9.2589 12.518 12.522 12.485 12.358 12.275
Average stress sc3 7.4714 7.4717 8.3656 10.889 12.52 12.503 12.421 12.317
sav.
Weight average of concrete stresses at cg. of pre-stressing foce. = 11.714 N/mm2
Average loss in pre-stres force = 16.916 Tonne
F1h' T 598.35 598.64 598.89 601.7 604.6 605.05 611.93 618.79 624.87
eF m 0.7785 0.7859 0.7923 0.8419 0.8844 0.8916 0.9779 1.0215 1.0274
sc1 N/mm2 7.2597 7.3421 7.4152 9.9423 14.192 14.329 16.119 17.19 17.481
Permanent Load stresses sc2 N/mm2 0.0065 -0.0783 -0.1525 -0.9629 -2.0704 -2.208 -4.0799 -5.3015 -5.6801
Net stress sc3 N/mm2 7.2662 7.2638 7.2627 8.9794 12.121 12.121 12.039 11.888 11.801
Dspr = Variation in stress in the tendons at time t, due to relaxation of the prestressing steel.
Ec = modulus of elasticity of concrete at time t0.
f(t,to) = Creep coefficient at a time t for initial load application at time t0.
sc =
Stress in the concrete adjacent to the tendons due to self-weight, initial prestress and all other quasi-permanent actions where relevant.
Ece = Effective modulus of elasticity of concrete for time t to t0
Ac = Area of the concrete section
Ic = second moment of area of the concrete section
e =
eccentricity of the tendons, i.e. the distance between the centroid of the tendons and the centroid of the concrete section.
Total Relaxation loss at day 28 Tonne 11.218 11.244 11.267 11.521 11.785 11.826 12.462 13.176 14.03
Additional loss from day 14 to day 28 Tonne 11.218 11.244 11.267 11.521 11.785 11.826 12.462 13.176 14.03
Sections Unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Distance m 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
Creep Loss :
For Stage-I cable, On account of Stage-I cable prestressing
Sections Unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Distance m 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
Stages
Creep loss from 14 To day 28 Tonne 12.049 12.045 12.043 14.89 20.1 20.1 19.963 19.714 19.569
Creep loss from 28 To day 35 Tonne 1.52 1.5195 1.5193 1.8784 2.5357 2.5357 2.5185 2.487 2.4688
Creep loss from 35 To day 63 Tonne 3.7346 3.7334 3.7328 4.6151 6.23 6.2301 6.1877 6.1103 6.0656
Creep loss from 63 To day 64 Tonne 0.0984 0.0984 0.0984 0.1217 0.1642 0.1642 0.1631 0.1611 0.1599
Creep loss from 64 To day 92 Tonne 2.2727 2.272 2.2717 2.8086 3.7914 3.7914 3.7656 3.7185 3.6913
Creep loss from 92 To day 36500 Tonne 19.684 19.678 19.675 24.325 32.837 32.837 32.614 32.206 31.97
Shrinkage Loss :
For Stage-I cable, On account of Stage-I cable prestressing
Sections Unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Distance m 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
Stages
Shrinkage loss from 14 To day 28 Tonne 2.4207 2.4207 2.4207 2.4207 2.4207 2.4207 2.4207 2.4207 2.4207
Shrinkage loss from 28 To day 35 Tonne 0.9884 0.9884 0.9884 0.9884 0.9884 0.9884 0.9884 0.9884 0.9884
Shrinkage loss from 35 To day 63 Tonne 3.1621 3.1621 3.1621 3.1621 3.1621 3.1621 3.1621 3.1621 3.1621
Shrinkage loss from 63 To day 64 Tonne 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096
Shrinkage loss from 64 To day 92 Tonne 2.3605 2.3605 2.3605 2.3605 2.3605 2.3605 2.3605 2.3605 2.3605
Shrinkage loss from 92 To day 36500 Tonne 19.939 19.939 19.939 19.939 19.939 19.939 19.939 19.939 19.939
Section properties
Sections Unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Section at 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
Properties of Precast Section
Area m2 1.92971 1.92971 1.92971 1.43945 0.94469 0.94469 0.94469 0.94469 0.9447
I gross m4 0.87202 0.87202 0.87202 0.74007 0.60691 0.60691 0.60691 0.60691 0.6069
yb m 1.16766 1.16766 1.16766 1.16004 1.15235 1.15235 1.15235 1.15235 1.1524
Properties of Composite Section
Area m2 2.50251 2.50251 2.50251 2.01225 1.51748 1.51748 1.51748 1.51748 1.5175
I gross m4 1.55604 1.55604 1.55604 1.36551 1.17322 1.17322 1.17322 1.17322 1.1732
yb m 1.45202 1.45202 1.45202 1.53914 1.62707 1.62707 1.62707 1.62707 1.6271
Tonne
Total (P2o) Tonne 421.59 421.59 421.59 421.59 421.59 421.59 421.59 421.59 421.59
Avg. P2o Tonne 421.59 421.59 421.59 421.59 421.59 421.59 421.59 421.59
Prestressing force & their eccentricity from cg. of section of Stage II cables :
Sections Unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Section at 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
Total (F2h) Tonne 373.834 374.012 374.168 377.094 380.239 380.731 388.201 395.67 397.92
eF m -0.3251 -0.2953 -0.2692 -0.0455 0.15006 0.17908 0.52781 0.70396 0.7277
eFc m -0.0407 -0.011 0.01515 0.33363 0.62478 0.6538 1.00253 1.17868 1.2024
Calculating Stress at the centroid of Ist stage cables due to II stage cables
Sections Unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Distance m 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
Length m 0.213 0.187 1.742 1.758 0.275 4.175 4.175 4.175
Forces Left in Ist stage cables at day 28
F1h" Tonne 514 514.552 515.034 517.48 517.716 518.567 531.628 544.689 556.09
eF m 0.77853 0.78589 0.79234 0.84186 0.8844 0.89157 0.97786 1.02154 1.0274
B) Elastic shortining of IInd stage cables due to IInd stage cable stressing
At day 28
loss in pre-stres force = 0.5*Ep/Ec*sav.*(N-1)*As
N-1 = Total Nos. of stage II cable - 1 = 1.57895 Nos
As = Area of one cable = 1875.49 mm2
Calculating Stress at the centroid of IIst stage cables due to II stage cables
Sections c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Distance 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
Length 0.213 0.187 1.742 1.758 0.275 4.175 4.175 4.175
Forces Left in IIst stage cables after friction & slip loss at day 28
F2h Tonne 373.834 374.012 374.168 377.094 380.239 380.731 388.201 395.67 397.92
eF m -0.3251 -0.2953 -0.2692 -0.0455 0.15006 0.17908 0.52781 0.70396 0.7277
Pre-stressing force at section after Elastic shortining loss due to II stage cables
At day = 28
Sections Unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Distance m 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
Length m 0.213 0.187 1.742 1.758 0.275 4.175 4.175 4.175
Forces In I -stage cables
F1h'' T 495.782 496.334 496.816 499.262 499.498 500.349 513.41 526.471 537.88
eF m 0.77853 0.78589 0.79234 0.84186 0.8844 0.89157 0.97786 1.02154 1.0274
F1h'' avg. T 496.058 496.575 498.039 499.38 499.924 506.88 519.94 532.17
Weighted average of pre-stress force I stage cables = 514.389 tonne
Claculation of stresses at the stage-I & stage-II cables afeter ES loss due to prestressing of II stage cables.
At day 28
Sections Unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Distance m 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
Total force in Stage II prestressing after ES loss due to II satge cables.
Fh' Tonne 368.975 369.153 369.309 372.234 375.38 375.872 383.341 390.811 393.06
eF m -0.3251 -0.2953 -0.2692 -0.0455 0.15006 0.17908 0.52781 0.70396 0.7277
eFc m -0.0407 -0.011 0.01515 0.33363 0.62478 0.6538 1.00253 1.17868 1.2024
Total stresses N/mm2 0.84777 0.85218 0.85799 1.43049 2.72405 2.75966 3.23801 3.46621 3.3222
Total stresses N/mm2 2.35646 2.31163 2.27253 2.64837 3.76157 3.73392 3.61534 3.67472 3.5668
CALCULATION OF CREEP LOSS IN STAGE - I CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO SECOND STAGE PRESTRESSING :
Total stress 6.2428 6.23255 6.2245 7.58782 10.082 10.0733 9.9238 9.82995 9.8773
Total concrete stresses at cg. Stage I cables after stgae II prestress applied (after ES loss taken place)
0.84777 0.85218 0.85799 1.43049 2.72405 2.75966 3.23801 3.46621 3.3222
Net additional steress applied Mpa 0.84125 0.93049 1.01044 2.39338 4.79443 4.96765 7.3179 8.76767 9.0022
Additional loss from day 35 to day 63 T 0.58197 0.6437 0.69901 1.65571 3.31672 3.43655 5.06242 6.06535 6.2276
Sections Unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Distance m 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
Crep loss from day 64 To day 92
Creep coefficent at day 92 = 0.77883
Concrete Modulus of elasticity at the time of loading = 33000 Mpa
Total Creep loss at day: 92 T 1.83439 2.02899 2.20332 5.21888 10.4545 10.8322 15.9571 19.1184 19.63
Additional loss from day 64 to day 92 T 0.27398 0.30304 0.32908 0.77947 1.56144 1.61785 2.38328 2.85544 2.9318
Immidiate loses in stage I cables due to elastic shortening losses due to second stage pre-stressing
Sections Unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Distance m 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
Stages
At day 28 Elastic shortening Tonne 18.2181 18.2181 18.2181 18.2181 18.2181 18.2181 18.2181 18.2181 18.218
Creep loss from 28 To day 35 Tonne 0.96593 1.0684 1.16019 2.74808 5.50498 5.70387 8.40244 10.0671 10.336
Creep loss from 35 To day 63 Tonne 0.58197 0.6437 0.69901 1.65571 3.31672 3.43655 5.06242 6.06535 6.2276
Creep loss from 63 To day 64 Tonne 0.01252 0.01385 0.01504 0.03562 0.07136 0.07394 0.10892 0.1305 0.134
Creep loss from 64 To day 92 Tonne 0.27398 0.30304 0.32908 0.77947 1.56144 1.61785 2.38328 2.85544 2.9318
Creep loss from 92 To day 36500 Tonne 2.03912 2.25544 2.44922 5.80134 11.6213 12.0411 17.738 21.2521 21.821
% loss at day 36500 Days % loss 6.35727 6.36936 6.37998 6.57906 6.79308 6.82656 7.33484 8.04899 8.2935
Dspr Mpa 79.211 79.3999 79.5658 82.6985 86.1103 86.6481 94.9498 106.225 110.08
Total Relaxation loss at day 36500 Tonne 23.4568 23.5127 23.5618 24.4895 25.4999 25.6591 28.1175 31.4563 32.598
Additional loss from day 92 to day 36500 Tonne 15.6187 15.6559 15.6886 16.3063 16.979 17.0851 18.722 20.9452 21.705
Sections Unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Distance m 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
Crep loss at day 35 To day 63
Creep coefficent at day 63 = 0.65719
Concrete Modulus of elasticity at the time of loading = 33000 Mpa
Total Creep loss at day: 63 T 2.70991 2.65836 2.61339 3.04561 4.32578 4.29398 4.15762 4.22591 4.1018
Additional loss from day 35 to day 63 T 1.01885 0.99947 0.98257 1.14507 1.62638 1.61442 1.56315 1.58883 1.5422
Stages
Load applied at an age 28
At day 28 Friction & slip Tonne 47.7555 47.5778 47.4219 44.4962 41.3509 40.8589 33.3892 25.9196 23.674
Elastic shortening Tonne 4.8593 4.8593 4.8593 4.8593 4.8593 4.8593 4.8593 4.8593 4.8593
CALCULATION OF CREEP LOSS IN STAGE - I CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO CASTING OF DECK SLAB :
DPc+s+r = Ap [ Ep/Ec f(t,to) sc ]
Ap = Area of all prestressing tendons. = 4738.08 mm2
Decs = Free shrinkage strain.
Ep = Modulus of elasticity of prestressing steel. = 195000 Mpa
Sections Unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Distance m 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
Crep loss at day 64 To day 92
Creep coefficent at day 92 = 0.72287
Concrete Modulus of elasticity at the time of loading = 33000 Mpa
Creep loss T 0.00234 -0.134 -0.2253 -1.2932 -2.8753 -3.0415 -6.0203 -8.0281 -8.6415
Additional loss from day 64 to day 92 T 0.00041 -0.0234 -0.0393 -0.2257 -0.5018 -0.5308 -1.0506 -1.401 -1.508
CALCULATION OF CREEP LOSS IN STAGE - II CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO CASTING OF DECK SLAB :
DPc+s+r = Ap [ Ep/Ec f(t,to) sc ]
Ap = Area of all prestressing tendons. = 2961.3 mm2
Decs = Free shrinkage strain.
Ep = Modulus of elasticity of prestressing steel. = 195000 Mpa
CALCULATION OF CREEP LOSS IN STAGE - I CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO TRANSFER OF SUPER-STRUCTURE AT PERMANENT BEARINGS.:
DPc+s+r = Ap [ Ep/Ec f(t,to) sc ]
Ap = Area of all prestressing tendons. = 4738.08 mm2
Decs = Free shrinkage strain.
Ep = Modulus of elasticity of prestressing steel. = 195000 Mpa
Additional creep loss in stage I cables on account of Transfer of super-structure at permanent bearings. :
Sections Unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Distance m 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
Stages
Creep loss from 63 To day 64 Tonne 0 0 0 0 0 0 0 0 0
Creep loss from 64 To day 92 Tonne 0 0 0 0 0 0 0 0 0
Creep loss from 92 To day 36500 Tonne 0 0 0 0 0 0 0 0 0
CALCULATION OF CREEP LOSS IN STAGE - II CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO TRANSFER OF SUPER-STRUCTURE AT PERMANENT BEARINGS.:
DPc+s+r = Ap [ Ep/Ec f(t,to) sc ]
Ap = Area of all prestressing tendons. = 2961.3 mm2
Decs = Free shrinkage strain.
Ep = Modulus of elasticity of prestressing steel. = 195000 Mpa
Additional creep loss in stage II cables on account of Transfer of super-structure at permanent bearings. :
Sections Unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Distance m 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
Stages
Creep loss from 63 To day 64 Tonne 0 0 0 0 0 0 0 0 0
Creep loss from 64 To day 92 Tonne 0 0 0 0 0 0 0 0 0
Creep loss from 92 To day 36500 Tonne 0 0 0 0 0 0 0 0 0
CALCULATION OF CREEP LOSS IN STAGE - I CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO PLACING OF SIDL.:
DPc+s+r = Ap [ Ep/Ec f(t,to) sc ]
Ap = Area of all prestressing tendons. = 4738.08 mm2
Decs = Free shrinkage strain.
Ep = Modulus of elasticity of prestressing steel. = 195000 Mpa
CALCULATION OF CREEP LOSS IN STAGE - II CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO PLACING OF SIDL.:
DPc+s+r = Ap [ Ep/Ec f(t,to) sc ]
Ap = Area of all prestressing tendons. = 2961.3 mm2
Decs = Free shrinkage strain.
Ep = Modulus of elasticity of prestressing steel. = 195000 Mpa
14 To day 28 Tonne 0 0 0 0 0 0 0 0 0
28 To day 35 Tonne 0 0 0 0 0 0 0 0 0
Creep loss from 35 To day 63 Tonne 0.00191 -0.1095 -0.1841 -1.0567 -2.3496 -2.4854 -4.9196 -6.5604 -7.062
Creep loss from 63 To day 64 Tonne 1.9E-05 -0.0011 -0.0019 -0.0108 -0.0239 -0.0253 -0.0501 -0.0668 -0.072
Creep loss from 64 To day 92 Tonne 0.00041 -0.0234 -0.0393 -0.2257 -0.5018 -0.5308 -1.0506 -1.401 -1.508
Stage I cableCasting of Deck
Creep
slab
loss from 92 To day 36500 Tonne 0.00276 -0.1582 -0.266 -1.5265 -3.3941 -3.5903 -7.1066 -9.4767 -10.2
Total Creep loss Tonne 43.2374 43.293 43.4176 56.2923 80.2231 80.5768 83.3754 84.1687 83.23
Total Relaxation loss Tonne 40.0716 40.1638 40.2449 41.1529 42.096 42.2442 44.5152 47.0655 50.11
Total Shrinkage loss Tonne 28.9662 28.9662 28.9662 28.9662 28.9662 28.9662 28.9662 28.9662 28.97
5) IMMIDIATE LOSES IN STAGE I CABLES DUE TO ELASTIC SHORTENING LOSSES DUE TO II STAGE PRE-STRESSING
Losses In ACTION Losess Type Sections Unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Distance m 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
At day 28 Elastic shortening Tonne 18.2181 18.2181 18.2181 18.2181 18.2181 18.2181 18.2181 18.2181 18.22
Stage I cableStressing of stage-II cables
Cr+ Rex+ Sh 14 To day 28 Tonne 25.6879 25.7098 25.7307 28.8315 34.3056 34.3472 34.8463 35.3106 36.02
ES due to stage II cables At day 28 Tonne 18.2181 18.2181 18.2181 18.2181 18.2181 18.2181 18.2181 18.2181 18.22
Cr+ Rex+ Sh 28 To day 35 Tonne 4.28825 4.3921 4.48531 6.45076 9.88408 10.086 12.8134 14.4984 14.81
Cr+ Rex+ Sh 35 To day 63 Tonne 8.81641 8.76858 8.75142 9.74809 11.7625 11.7515 10.9765 10.3464 10.06
Cr+ Rex+ Sh 63 To day 64 Tonne 0.20842 0.20859 0.20901 0.244 0.30918 0.31038 0.31954 0.32247 0.32
Cr+ Rex+ Sh 64 To day 92 Tonne 4.94866 4.93634 4.93174 5.56003 6.78949 6.78638 6.60322 6.42244 6.288
Cr+ Rex+ Sh 92 To day 36500 Tonne 68.3256 68.4076 68.5205 75.5771 88.2345 88.5057 91.2977 93.3002 94.8
Stage I cable
Total Shrinkage loss Tonne 206.071 205.932 205.885 216.932 238.993 239.055 237.446 234.124 230.2
Cr+ Rex+ Sh 14 To day 28 Tonne 101.265 101 100.769 101.134 103.796 103.397 97.217 91.0159 85.69
ES due to stage II cables At day 28 Tonne 119.483 119.218 118.987 119.352 122.014 121.615 115.435 109.234 103.9
Cr+ Rex+ Sh 28 To day 35 Tonne 123.771 123.61 123.473 125.803 131.898 131.701 128.249 123.732 118.7
Cr+ Rex+ Sh 35 To day 63 Tonne 132.588 132.379 132.224 135.551 143.66 143.453 139.225 134.079 128.8
Cr+ Rex+ Sh 63 To day 64 Tonne 132.796 132.588 132.433 135.795 143.969 143.763 139.545 134.401 129.1
Cr+ Rex+ Sh 64 To day 92 Tonne 137.745 137.524 137.365 141.355 150.759 150.55 146.148 140.824 135.4
Cr+ Rex+ Sh 92 To day 36500 Tonne 206.071 205.932 205.885 216.932 238.993 239.055 237.446 234.124 230.2
Stage I cable
14 To day 28 P Tonne 572.661 572.926 573.157 572.867 570.29 570.701 577.083 583.478 588.9
M Tm 445.836 450.255 454.137 482.276 504.363 508.822 564.309 596.045 605
At day 28 P Tonne 554.443 554.708 554.939 554.649 552.072 552.483 558.865 565.26 570.6
M Tm 431.653 435.938 439.702 466.939 488.251 492.579 546.494 577.435 586.2
28 To day 35 P Tonne 550.155 550.316 550.454 548.198 542.188 542.397 546.051 550.762 555.8
M Tm 428.314 432.486 436.148 461.508 479.509 483.587 533.964 562.624 571
35 To day 63 P Tonne 541.338 541.547 541.702 538.45 530.425 530.646 535.075 540.415 545.8
M Tm 421.45 425.595 429.214 453.302 469.107 473.11 523.231 552.055 560.7
63 To day 64 P Tonne 541.13 541.339 541.493 538.206 530.116 530.335 534.755 540.093 545.4
M Tm 421.288 425.431 429.048 453.096 468.833 472.833 522.918 551.725 560.4
64 To day 92 P Tonne 536.181 536.402 536.561 532.646 523.326 523.549 528.152 533.67 539.1
M Tm 417.435 421.552 425.141 448.416 462.829 466.782 516.461 545.165 553.9
92 To day 36500 P Tonne 467.856 467.995 468.041 457.069 435.092 435.043 436.854 440.37 444.3
M Tm 364.241 367.791 370.849 384.79 384.794 387.873 427.184 449.855 456.5
Stage I cable
Stress at girder top At day 14 Mpa -2.9483 -3.0069 -3.0583 -3.6225 -3.7112 -3.796 -4.8377 -5.403 -5.525
Stress at girder bottom Mpa 9.33839 9.40181 9.45754 12.1201 16.5525 16.6473 17.8393 18.5524 18.8
Stress at girder top 14 To day 28 Mpa -2.8217 -2.8777 -2.9269 -3.449 -3.5006 -3.5806 -4.5622 -5.0947 -5.206
Stress at girder bottom Mpa 8.93748 8.99803 9.0512 11.5393 15.6133 15.7023 16.8234 17.4937 17.72
Stress at girder top At day 28 Mpa -2.7319 -2.7862 -2.8339 -3.3393 -3.3888 -3.4663 -4.4182 -4.9356 -5.045
Stress at girder bottom Mpa 8.65315 8.71191 8.76351 11.1724 15.1145 15.2011 16.2923 16.9475 17.17
Stress at girder top 28 To day 35 Mpa -2.7108 -2.7642 -2.811 -3.3004 -3.3281 -3.403 -4.3169 -4.809 -4.914
Stress at girder bottom Mpa 8.58622 8.64293 8.69267 11.0424 14.8439 14.9236 15.9188 16.5128 16.73
Stress at girder top 35 To day 63 Mpa -2.6674 -2.7201 -2.7663 -3.2417 -3.2559 -3.3292 -4.2301 -4.7187 -4.825
Stress at girder bottom Mpa 8.44863 8.50521 8.55447 10.8461 14.5219 14.6002 15.5988 16.2026 16.42
Stress at girder top 63 To day 64 Mpa -2.6664 -2.7191 -2.7652 -3.2403 -3.254 -3.3273 -4.2276 -4.7159 -4.822
Stress at girder bottom Mpa 8.44537 8.50194 8.55117 10.8411 14.5134 14.5917 15.5894 16.1929 16.41
Stress at girder top 64 To day 92 Mpa -2.642 -2.6943 -2.7401 -3.2068 -3.2123 -3.2847 -4.1754 -4.6598 -4.767
Stress at girder bottom Mpa 8.36814 8.42441 8.47329 10.7291 14.3275 14.405 15.3969 16.0004 16.22
Stress at girder top 92 To day 36500 Mpa -2.3053 -2.3507 -2.3901 -2.7518 -2.6707 -2.7294 -3.4536 -3.8451 -3.929
Stress at girder bottom Mpa 7.30179 7.35004 7.39123 9.20679 11.9119 11.9698 12.7354 13.2031 13.37
Stage I cableStresses at different sections at different stages
14 To day 28 Tonne 0 0 0 0 0 0 0 0 0
28 To day 35 Tonne 0 0 0 0 0 0 0 0 0
Creep loss from 35 To day 63 Tonne -0.0005 0.02572 0.0391 0.03568 -0.2492 -0.312 -1.6596 -2.8256 -3.126
Creep loss from 63 To day 64 Tonne -5E-06 0.00026 0.0004 0.00036 -0.0025 -0.0032 -0.0169 -0.0288 -0.0318
Creep loss from 64 To day 92 Tonne -0.0001 0.00549 0.00835 0.00762 -0.0532 -0.0666 -0.3544 -0.6034 -0.6676
Stage II cable
Casting of Deck
Creep
slab
loss from 92 To day 36500 Tonne -0.0007 0.03715 0.05648 0.05154 -0.3599 -0.4507 -2.3974 -4.0816 -4.5157
Total Creep loss Tonne 6.78007 6.7213 6.64345 7.62322 9.80358 9.51718 4.93864 1.51289 0.2692
2) IMMIDIATE LOSES IN STAGE II CABLES DUE TO ELASTIC SHORTENING LOSSES DUE TO II STAGE PRE-STRESSING
Losses In ACTION Losess Type Sections Unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Distance m 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
Friction & slip At day 28 Tonne 47.7555 47.5778 47.4219 44.4962 41.3509 40.8589 33.3892 25.9196 23.6739
Elastic shortening 4.8593 4.8593 4.8593 4.8593 4.8593 4.8593 4.8593 4.8593 4.8593
Stage II cable
Stressing of stage-II cables
Immediate loss Tonne 52.6148 52.4371 52.2812 49.3555 46.2102 45.7182 38.2485 30.7789 28.5332
Total Relaxation loss Tonne 23.4568 23.5127 23.5618 24.4895 25.4999 25.6591 28.1175 31.4563 32.5981
Total Shrinkage loss Tonne 16.5909 16.5909 16.5909 16.5909 16.5909 16.5909 16.5909 16.5909 16.5909
- 14 To day 28 Tonne
Fr+slip+ES of Stage II cable At day 28 Tonne 52.6148 52.4371 52.2812 49.3555 46.2102 45.7182 38.2485 30.7789 28.5332
Cr+ Rex+ Sh 28 To day 35 Tonne 8.31061 8.29274 8.27726 8.78434 9.84171 9.86262 10.4065 11.3035 11.5181
Cr+ Rex+ Sh 35 To day 63 Tonne 4.5616 4.57217 4.57193 4.79298 5.05694 4.99276 3.75809 2.84089 2.57002
Cr+ Rex+ Sh 63 To day 64 Tonne 0.11943 0.11937 0.11922 0.12416 0.13324 0.13259 0.1217 0.11573 0.11349
Cr+ Rex+ Sh 64 To day 92 Tonne 2.18669 2.18382 2.17882 2.22902 2.30614 2.27401 1.74597 1.36005 1.23599
Cr+ Rex+ Sh 92 To day 36500 Tonne 31.6494 31.6568 31.649 32.7732 34.5563 34.5053 33.6148 33.94 34.0206
Stage II cable
Total Loss Tonne 99.4426 99.2621 99.0774 98.0592 98.1046 97.4854 87.8956 80.3391 77.9915
- 14 To day 28 Tonne 0 0 0 0 0 0 0 0 0
Fr+slip+ES of Stage II cable At day 28 Tonne 52.6148 52.4371 52.2812 49.3555 46.2102 45.7182 38.2485 30.7789 28.5332
Cr+ Rex+ Sh 28 To day 35 Tonne 60.9254 60.7299 60.5584 58.1398 56.0519 55.5808 48.6551 42.0824 40.0513
Cr+ Rex+ Sh 35 To day 63 Tonne 65.487 65.3021 65.1304 62.9328 61.1089 60.5736 52.4132 44.9233 42.6214
Cr+ Rex+ Sh 63 To day 64 Tonne 65.6064 65.4214 65.2496 63.057 61.2421 60.7062 52.5349 45.039 42.7349
Cr+ Rex+ Sh 64 To day 92 Tonne 67.7931 67.6052 67.4284 65.286 63.5482 62.9802 54.2808 46.399 43.9708
Cr+ Rex+ Sh 92 To day 36500 Tonne 99.4426 99.2621 99.0774 98.0592 98.1046 97.4854 87.8956 80.3391 77.9915
Stage II cable
At day 14 P Tonne
M Tm
14 To day 28 P Tonne
M Tm
At day 28 P Tonne 368.975 369.153 369.309 372.234 375.38 375.872 383.341 390.811 393.057
M Tm -119.94 -109.02 -99.42 -16.929 56.3291 67.3126 202.333 275.117 286.012
28 To day 35 P Tonne 360.665 360.86 361.031 363.45 365.538 366.009 372.935 379.508 381.539
M Tm -117.24 -106.57 -97.192 -16.529 54.8523 65.5464 196.84 267.16 277.631
35 To day 63 P Tonne 356.103 356.288 356.46 358.657 360.481 361.016 369.177 376.667 378.969
M Tm -115.76 -105.22 -95.961 -16.311 54.0934 64.6523 194.856 265.16 275.761
63 To day 64 P Tonne 355.983 356.168 356.34 358.533 360.348 360.884 369.055 376.551 378.855
M Tm -115.72 -105.18 -95.929 -16.306 54.0735 64.6285 194.792 265.079 275.678
64 To day 92 P Tonne 353.797 353.985 354.162 356.304 358.042 358.61 367.309 375.191 377.619
M Tm -115.01 -104.54 -95.343 -16.204 53.7274 64.2213 193.871 264.121 274.779
92 To day 36500 P Tonne 322.147 322.328 322.513 323.531 323.485 324.104 333.694 341.251 343.598
Stage II cable
Forces at different sections at different stages M Tm -104.72 -95.19 -86.822 -14.714 48.5419 58.042 176.128 240.229 250.024
14 To day 28 P Tonne 572.661 572.926 573.157 572.867 570.29 570.701 577.083 583.478 588.851
M Tm 445.836 450.255 454.137 482.276 504.363 508.822 564.309 596.045 604.956
At day 28 P Tonne 923.418 923.861 924.248 926.883 927.451 928.355 942.206 956.071 963.689
M Tm 311.712 326.92 340.282 450.01 544.58 559.892 748.827 852.552 872.253
28 To day 35 P Tonne 910.819 911.176 911.485 911.648 907.726 908.406 918.986 930.269 937.36
M Tm 311.075 325.917 338.956 444.979 534.362 549.133 730.804 829.784 848.655
35 To day 63 P Tonne 897.441 897.835 898.162 897.107 890.906 891.662 904.251 917.082 924.725
M Tm 305.694 320.376 333.253 436.991 523.2 537.762 718.087 817.215 836.445
63 To day 64 P Tonne 897.113 897.507 897.833 896.739 890.464 891.219 903.81 916.644 924.292
M Tm 305.571 320.248 333.119 436.791 522.907 537.461 717.71 816.804 836.034
64 To day 92 P Tonne 889.978 890.387 890.723 888.95 881.368 882.159 895.461 908.861 916.768
M Tm 302.429 317.013 329.798 432.211 516.556 531.004 710.332 809.286 828.675
92 To day 36500 P Tonne 790.003 790.323 790.553 780.599 758.577 759.148 770.548 781.621 787.944
Stage (I+ II) cable
Forces at different sections at different stages M Tm 259.523 272.601 284.027 370.076 433.336 445.915 603.312 690.083 706.522
Forces just after friction & slip Horizontal component T 978.042 978.507 978.915 984.635 990.659 991.601 1005.91 1020.19 1028.51
Forces just after friction & slip Vertical component T 71.6957 71.7305 71.761 63.9823 55.0768 53.6837 32.5344 11.365 0
Vertical component after all losses T 57.9114 57.9354 57.9528 50.7239 42.174 41.0991 24.9221 8.70733 0
Stress at girder top At day 28 Mpa 3.46954 3.32863 3.20481 2.84671 2.90841 2.70593 0.2318 -1.0655 -1.2477
Stress at girder bottom Mpa 0.30604 0.45321 0.58254 2.3206 5.04312 5.25688 7.89961 9.36066 9.5913
Stress at girder top 28 To day 35 Mpa 3.3914 3.25386 3.13298 2.77953 2.83216 2.63492 0.22551 -1.0347 -1.2112
Stress at girder bottom Mpa 0.29914 0.44303 0.56948 2.26583 4.9109 5.11894 7.68516 9.08992 9.31024
Stress at girder top 35 To day 63 Mpa 3.3485 3.21263 3.09331 2.74287 2.79298 2.59898 0.22323 -1.0269 -1.203
Stress at girder bottom Mpa 0.29536 0.43742 0.56227 2.23595 4.84296 5.04911 7.60771 9.02188 9.24753
Stress at girder top 63 To day 64 Mpa 3.34738 3.21155 3.09227 2.74192 2.79195 2.59803 0.22316 -1.0266 -1.2026
Stress at girder bottom Mpa 0.29526 0.43727 0.56208 2.23518 4.84117 5.04726 7.60521 9.0191 9.24476
Stress at girder top 64 To day 92 Mpa 3.32682 3.19186 3.07336 2.72488 2.77408 2.58166 0.2221 -1.0229 -1.1987
Stress at girder bottom Mpa 0.29345 0.43459 0.55865 2.22128 4.81019 5.01545 7.56923 8.98653 9.2146
Stress at girder top 92 To day 36500 Mpa 3.02921 2.90641 2.79872 2.47424 2.50634 2.33325 0.20178 -0.9304 -1.0907
Stress at girder bottom Mpa 0.2672 0.39572 0.50872 2.01697 4.34594 4.53287 6.87652 8.1736 8.38443
Stage II cable
Stresses at different sections at different stages
Stress at girder top At day 14 Mpa -2.9483 -3.0069 -3.0583 -3.6225 -3.7112 -3.796 -4.8377 -5.403 -5.5248
Stress at girder bottom Mpa 9.33839 9.40181 9.45754 12.1201 16.5525 16.6473 17.8393 18.5524 18.8037
Stress at girder top 14 To day 28 Mpa -2.8217 -2.8777 -2.9269 -3.449 -3.5006 -3.5806 -4.5622 -5.0947 -5.2063
Stress at girder bottom Mpa 8.93748 8.99803 9.0512 11.5393 15.6133 15.7023 16.8234 17.4937 17.7198
Stress at girder top At day 28 Mpa 0.73759 0.54241 0.3709 -0.4926 -0.4803 -0.7603 -4.1864 -6.0011 -6.293
Stress at girder bottom Mpa 8.95919 9.16512 9.34604 13.493 20.1576 20.4579 24.1919 26.3081 26.7628
Stress at girder top 28 To day 35 Mpa 0.68058 0.48969 0.32198 -0.5209 -0.4959 -0.7681 -4.0914 -5.8437 -6.1255
Stress at girder bottom Mpa 8.88537 9.08596 9.26216 13.3082 19.7548 20.0425 23.6039 25.6027 26.0361
Stress at girder top 35 To day 63 Mpa 0.68112 0.49251 0.327 -0.4989 -0.4629 -0.7303 -4.0069 -5.7456 -6.0283
Stress at girder bottom Mpa 8.74399 8.94263 9.11674 13.082 19.3648 19.6493 23.2065 25.2245 25.6705
Stress at girder top 63 To day 64 Mpa 0.68103 0.49248 0.32703 -0.4984 -0.462 -0.7293 -4.0045 -5.7424 -6.0251
Stress at girder bottom Mpa 8.74064 8.93921 9.11326 13.0763 19.3546 19.6389 23.1947 25.212 25.6581
Stress at girder top 64 To day 92 Mpa 0.68485 0.49758 0.33331 -0.4819 -0.4382 -0.7031 -3.9533 -5.6827 -5.9656
Stress at girder bottom Mpa 8.66159 8.859 9.03194 12.9504 19.1377 19.4204 22.9662 24.9869 25.4387
Stress at girder top 92 To day 36500 Mpa 0.72391 0.55574 0.40857 -0.2775 -0.1644 -0.3962 -3.2519 -4.7755 -5.0194
Stress at girder bottom Mpa 7.56899 7.74577 7.89995 11.2238 16.2578 16.5027 19.6119 21.3767 21.7557
Stage I+ II cable
Stresses at different sections at different stages
Impact Factor For Live Load Lane Reduction Factor For Live Load
Class A Loading = 0.1142 Class AX3 = 10 %
Class 70 RW Loading = 0.1142 Class AX1 + 70 RW = 10 %
Class AX4 = 20 %
Class AX2 + 70 RW = 20 %
Class 70 RWX2 = 20 %
BENDING MOMENT DUE TO LIVE LOAD
Section At unit Face TS deff TE L/8 2L/8 3L/8 4L/8 unit Face TS deff TE L/8 2L/8 3L/8 4L/8
Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7 m 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
OUTER GIRDER INNER GIRDER
70RW Tm 10.965 21.471 114.62 202.82 224.67 358.41 423.91 463.55 Tm 10.293 17.336 80.521 132.62 148.99 201.78 273.58 278.03
Class 2A Tm 8.1794 15.629 80.331 141.2 151.24 260.1 329.44 355.51 Tm 6.4513 11.971 58.54 100.09 117.27 179.21 222.73 243.91
Class 3A Tm 8.0494 15.319 78.906 139.67 148.15 260.73 336.97 360.37 Tm 6.6876 12.533 62.382 108.35 119.83 198.82 254 275.09
Class 1A + 70RW (ecc) Tm 10.48 18.524 87.45 157.18 167.1 300.5 399.15 412 Tm 9.5526 17.374 86.538 148.9 157.63 246.57 281.61 330.85
Class AX4 Tm 6.7931 12.88 65.948 116.52 123.58 215.21 275.06 295.36 Tm 6.2129 11.625 57.962 100.99 109.43 186.7 240.56 258.86
Class AX2 + 70 RW Tm 9.6081 16.921 80.043 133.59 141.1 249.29 325.31 342.45 Tm 8.9306 16.027 70.364 118.75 127.52 209.2 274.09 285.37
Class 70 RWX2 Tm 10.295 21.465 108.86 179.49 202.88 330.28 407.42 438.45 Tm 16.179 26.929 114.16 181.79 191.85 256.36 322.14 329.53
Class 70 RWX2 (2) Tm 9.2613 17.483 97.831 175.31 187.84 320.27 392.28 423.5 Tm 8.6401 14.594 69.732 117.84 128.89 217.3 312.13 318.74
Special Vehicle Loading Tm 7.128 14.513 79.248 141.54 150.99 267 348.51 360.44 Tm 17.032 31.1 141.21 229.35 239.71 324.75 339.15 360.04
Max Live Load (without SV) Tm 10.965 21.471 114.62 202.82 224.67 358.41 423.91 463.55 Tm 16.179 26.929 114.16 181.79 191.85 256.36 322.14 330.85
SECTION PROPERTIES
Sections unit Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Section at m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
Properties of Precast Section
Area m2 1.9297 1.9297 1.9297 1.9297 1.9297 1.4394 0.9447 0.9447 0.945 0.94469 0.9447
I gross m4 0.872 0.872 0.872 0.872 0.872 0.7401 0.6069 0.6069 0.607 0.60691 0.6069
yb m 1.1677 1.1677 1.1677 1.1677 1.1677 1.16 1.1524 1.1524 1.152 1.15235 1.1524
yt m 1.1323 1.1323 1.1323 1.1323 1.1323 1.14 1.1476 1.1476 1.148 1.14765 1.1476
Properties of Composite Section
Area m2 2.5025 2.5025 2.5025 2.5025 2.5025 2.0122 1.5175 1.5175 1.517 1.51748 1.5175
I gross m4 1.556 1.556 1.556 1.556 1.556 1.3655 1.1732 1.1732 1.173 1.17322 1.1732
yb m 1.452 1.452 1.452 1.452 1.452 1.5391 1.6271 1.6271 1.627 1.62707 1.6271
yt m 1.068 1.068 1.068 1.068 1.068 0.9809 0.8929 0.8929 0.893 0.89293 0.8929
Gtop m 0.848 0.848 0.848 0.848 0.848 0.7609 0.6729 0.6729 0.673 0.67293 0.6729
Transfer brg.
Dtop Mpa 0 0 0 0 0 0 0 0 0 0 0
Deck Dbottom Mpa 0 0 0 0 0 0 0 0 0 0 0
Gtop Mpa 0 0 0 0 0 0 0 0 0 0 0
Stresses Girder
At Gbottom Mpa 0 0 0 0 0 0 0 0 0 0 0
SIDL
Dtop Mpa 0 0 0 0 0 0 0 0 0 0 0
Deck Dbottom Mpa 0 0 0 0 0 0 0 0 0 0 0
Gtop Mpa 0 0 0 0 0 0 0 0 0 0 0
Stresses Girder
At Gbottom Mpa 0 0 0 0 0 0 0 0 0 0 0
Section At unit Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
Surfacing
Dtop Mpa 0 0 0 0.0115 0.0211 0.1118 0.2074 0.2199 0.376 0.46944 0.4999
Deck Dbottom Mpa 0 0 0 0.0091 0.0168 0.0867 0.1563 0.1657 0.283 0.35378 0.3767
Gtop Mpa 0 0 0 0.0091 0.0168 0.0867 0.1563 0.1657 0.283 0.35378 0.3767
Stresses Girder
At Gbottom Mpa 0 0 0 -0.016 -0.029 -0.175 -0.378 -0.4007 -0.685 -0.8554 -0.9108
Wind Load
Dtop Mpa 0 0 0 0.0113 0.0208 0.1101 0.2042 0.2165 0.37 0.46222 0.4922
Deck Dbottom Mpa 0 0 0 0.009 0.0165 0.0854 0.1539 0.1632 0.279 0.34834 0.3709
Gtop Mpa 0 0 0 0.009 0.0165 0.0854 0.1539 0.1632 0.279 0.34834 0.3709
Stresses Girder
At Gbottom Mpa 0 0 0 -0.015 -0.028 -0.173 -0.372 -0.3945 -0.674 -0.84224 -0.8968
At day 64
Dtop Mpa -0.182 -0.182 -0.182 -0.182 -0.182 -0.162 -0.122 -0.1218 -0.122 -0.12184 -0.1218
Deck Dbottom Mpa -0.224 -0.224 -0.224 -0.224 -0.224 -0.205 -0.167 -0.1668 -0.167 -0.16678 -0.1668
Gtop Mpa 0.2821 0.2821 0.2821 0.2821 0.2821 0.3007 0.3392 0.3392 0.339 0.33918 0.3392
Stresses Girder
At Gbottom Mpa -0.151 -0.151 -0.151 -0.151 -0.151 -0.148 -0.131 -0.1306 -0.131 -0.13065 -0.1306
At day 92
Dtop Mpa -0.173 -0.173 -0.173 -0.173 -0.173 -0.154 -0.116 -0.1158 -0.116 -0.11579 -0.1158
Deck Dbottom Mpa -0.213 -0.213 -0.213 -0.213 -0.213 -0.195 -0.158 -0.1585 -0.158 -0.15849 -0.1585
Gtop Mpa 0.2681 0.2681 0.2681 0.2681 0.2681 0.2857 0.3223 0.3223 0.322 0.32233 0.3223
Stresses Girder
At Gbottom Mpa -0.144 -0.144 -0.144 -0.144 -0.144 -0.141 -0.124 -0.1242 -0.124 -0.12416 -0.1242
At day 36500
Dtop Mpa -0.713 -0.713 -0.713 -0.713 -0.713 -0.635 -0.477 -0.4765 -0.477 -0.47654 -0.4765
Deck Dbottom Mpa -0.875 -0.875 -0.875 -0.875 -0.875 -0.803 -0.652 -0.6523 -0.652 -0.65231 -0.6523
Gtop Mpa 1.1035 1.1035 1.1035 1.1035 1.1035 1.1759 1.3266 1.3266 1.327 1.32662 1.3266
Stresses Girder
At Gbottom Mpa -0.592 -0.592 -0.592 -0.592 -0.592 -0.58 -0.511 -0.511 -0.511 -0.511 -0.511
Gtop 14 To day 28 Mpa -3.104 -3.166 -3.22 -3.794 -3.851 -3.9386 -5.018 -5.60414 -5.7269
Girder Gbottom Mpa 9.8312 9.8978 9.9563 12.693 17.175 17.273 18.51 19.2431 19.492
Gtop At day 28 Mpa 0.8114 0.5966 0.408 -0.542 -0.528 -0.8364 -4.605 -6.60118 -6.9223
Girder Gbottom Mpa 9.8551 10.082 10.281 14.842 22.173 22.504 26.61 28.939 29.439
Gtop 28 To day 35 Mpa 0.7486 0.5387 0.3542 -0.573 -0.546 -0.8449 -4.501 -6.42803 -6.738
Girder Gbottom Mpa 9.7739 9.9946 10.188 14.639 21.73 22.047 25.96 28.163 28.64
Girder Gtop 35 To day 63 Mpa 0.7492 0.5418 0.3597 -0.549 -0.509 -0.8033 -4.408 -6.32014 -6.6311
Gbottom Mpa 9.6184 9.8369 10.028 14.39 21.301 21.614 25.53 27.7469 28.238
Girder Gtop 63 To day 64 Mpa 0.7491 0.5417 0.3597 -0.548 -0.508 -0.8022 -4.405 -6.31669 -6.6276
Gbottom Mpa 9.6147 9.8331 10.025 14.384 21.29 21.603 25.51 27.7332 28.224
Girder Gtop 64 To day 92 Mpa 0.7533 0.5473 0.3666 -0.53 -0.482 -0.7734 -4.349 -6.25093 -6.5622
Gbottom Mpa 9.5277 9.7449 9.9351 14.245 21.051 21.362 25.26 27.4856 27.983
Gtop 92 To day 36500 Mpa 0.7963 0.6113 0.4494 -0.305 -0.181 -0.4358 -3.577 -5.25302 -5.5213
Girder Gbottom Mpa 8.3259 8.5203 8.6899 12.346 17.884 18.153 21.57 23.5143 23.931
5) Rare Combination LC-SR5 : At day 63 At the time of transfer over permanent bearings
Sections unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Distance m 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
A) Stresses due to Prestress force Load factor = 1
Gtop Mpa 0.7492 0.5418 0.3597 -0.549 -0.509 -0.8033 -4.408 -6.32014 -6.6311
Girder Gbottom Mpa 9.6184 9.8369 10.028 14.39 21.301 21.614 25.53 27.7469 28.238
F.1) Stresses due to Live load (With SV) Load factor = 0.75
Dtop Mpa 0 0.0367 0.0747 0.4269 0.8079 0.8619 1.524 1.98937 2.0575
Deck Dbottom Mpa 0 0.0291 0.0593 0.3312 0.6089 0.6495 1.149 1.49923 1.5505
Gtop Mpa 0 0.0291 0.0593 0.3312 0.6089 0.6495 1.149 1.49923 1.5505
Girder Gbottom Mpa 0 -0.05 -0.102 -0.67 -1.472 -1.5705 -2.777 -3.62497 -3.749
F.1) Stresses due to Live load (With SV) Load factor = 0.75
Dtop Mpa 0 0.0367 0.0747 0.4269 0.8079 0.8619 1.524 1.98937 2.0575
Deck Dbottom Mpa 0 0.0291 0.0593 0.3312 0.6089 0.6495 1.149 1.49923 1.5505
Gtop Mpa 0 0.0291 0.0593 0.3312 0.6089 0.6495 1.149 1.49923 1.5505
Girder Gbottom Mpa 0 -0.05 -0.102 -0.67 -1.472 -1.5705 -2.777 -3.62497 -3.749
Sections unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Distance m 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
8) Rare Combination LC-SR8 : At day 36500
Total Stresses (A+B)
Gtop Mpa 1.8886 1.9919 2.0637 3.765 6.9956 7.1218 8.368 9.27117 9.9557
Girder Gbottom Mpa 7.7455 7.5958 7.4803 8.0913 9.6332 9.3292 7.093 5.81399 4.9203
8.1) Rare Combination LC-SR8.1 : At day 36500 + temperature stresses
Total Stresses (A+B)
Gtop Mpa 1.0967 1.2 1.2718 3.0474 6.3529 6.4791 7.725 8.62843 9.313
Girder Gbottom Mpa 9.429 9.2793 9.1637 9.5004 10.765 10.461 8.226 6.94628 6.0526
8.2) Rare Combination LC-SR8.2 : At day 36500 - temperature stresses
Total Stresses (A+B)
Gtop Mpa 2.2787 2.382 2.4538 4.2218 7.5196 7.6458 8.892 9.79514 10.48
Girder Gbottom Mpa 5.8382 5.6885 5.573 6.3677 8.0949 7.7909 5.555 4.27572 3.3821
8.3) Rare Combination LC-SR8.3 : At day 36500 + temperature stresses
Total Stresses (A+B)
Gtop Mpa 0.5688 0.6571 0.7146 2.4093 5.6336 5.7284 6.783 7.59209 8.2198
Girder Gbottom Mpa 10.551 10.427 10.336 10.763 12.224 11.995 10.22 9.17087 8.4147
8.4) Rare Combination LC-SR8.4 : At day 36500 - temperature stresses
Total Stresses (A+B)
Gtop Mpa 2.5388 2.6271 2.6846 4.3666 7.5781 7.6729 8.727 9.5366 10.164
Girder Gbottom Mpa 4.5667 4.4426 4.3515 5.5416 7.7726 7.5444 5.772 4.71994 3.9637
F.1) Stresses due to Live load (With SV) Load factor = 0.75
Dtop Mpa 0 0.0367 0.0747 0.4269 0.8079 0.8619 1.524 1.98937 2.0575
Deck Dbottom Mpa 0 0.0291 0.0593 0.3312 0.6089 0.6495 1.149 1.49923 1.5505
Gtop Mpa 0 0.0291 0.0593 0.3312 0.6089 0.6495 1.149 1.49923 1.5505
Girder Gbottom Mpa 0 -0.05 -0.102 -0.67 -1.472 -1.5705 -2.777 -3.62497 -3.749
Gtop Mpa 0 0.012 0.0234 0.1277 0.2327 0.2577 0.411 0.48628 0.5318
Girder Gbottom Mpa 0 -0.02 -0.04 -0.258 -0.563 -0.6232 -0.994 -1.17578 -1.2857
F.1) Stresses due to Live load (With SV) Load factor = 0.2
Dtop Mpa 0 0.0098 0.0199 0.1138 0.2155 0.2298 0.406 0.5305 0.5487
Deck Dbottom Mpa 0 0.0078 0.0158 0.0883 0.1624 0.1732 0.306 0.39979 0.4135
Gtop Mpa 0 0.0078 0.0158 0.0883 0.1624 0.1732 0.306 0.39979 0.4135
Girder Gbottom Mpa 0 -0.013 -0.027 -0.179 -0.393 -0.4188 -0.741 -0.96666 -0.9997
Girder Gbottom Mpa 8.3259 8.5203 8.6899 12.346 17.884 18.153 21.57 23.5143 23.931
F.1) Stresses due to Live load (With SV) Load factor = 0.2
Dtop Mpa 0 0.0098 0.0199 0.1138 0.2155 0.2298 0.406 0.5305 0.5487
Deck Dbottom Mpa 0 0.0078 0.0158 0.0883 0.1624 0.1732 0.306 0.39979 0.4135
Gtop Mpa 0 0.0078 0.0158 0.0883 0.1624 0.1732 0.306 0.39979 0.4135
Girder Gbottom Mpa 0 -0.013 -0.027 -0.179 -0.393 -0.4188 -0.741 -0.96666 -0.9997
G) Stresses due to differential shrinkage Load factor = 1
Dtop Mpa -0.713 -0.713 -0.713 -0.635 -0.477 -0.4765 -0.477 -0.47654 -0.4765
Deck Dbottom Mpa -0.875 -0.875 -0.875 -0.803 -0.652 -0.6523 -0.652 -0.65231 -0.6523
Gtop Mpa 1.1035 1.1035 1.1035 1.1759 1.3266 1.3266 1.327 1.32662 1.3266
Girder Gbottom Mpa -0.592 -0.592 -0.592 -0.58 -0.511 -0.511 -0.511 -0.511 -0.511
H) -ve temperature stresses Load factor = 0.6
Dtop Mpa -1.699 -1.699 -1.699 -1.643 -1.588 -1.5877 -1.588 -1.58772 -1.5877
Deck Dbottom Mpa 0.3901 0.3901 0.3901 0.4567 0.524 0.524 0.524 0.52397 0.524
Gtop Mpa 0.3901 0.3901 0.3901 0.4567 0.524 0.524 0.524 0.52397 0.524
Girder Gbottom Mpa -1.907 -1.907 -1.907 -1.724 -1.538 -1.5383 -1.538 -1.53827 -1.5383
Total Stresses (A+B +C+D+E+F+G) (Without SV Loading)
Dtop Mpa -2.412 -2.385 -2.361 -2.002 -1.548 -1.5024 -1.143 -0.94955 -0.8588
Deck Dbottom Mpa -0.485 -0.464 -0.445 -0.132 0.2606 0.2951 0.566 0.71173 0.7801
Gtop Mpa 2.2787 2.3342 2.3602 3.7108 6.5889 6.6149 7.247 7.85 8.3526
Girder Gbottom Mpa 5.8382 5.7704 5.7333 7.4012 10.345 10.284 9.531 8.97884 8.525
Total Stresses (A+B +C+D+E+F+G) (With SV Loading)
Dtop Mpa -0.713 -0.692 -0.672 -0.409 -0.054 -0.0268 0.306 0.52341 0.572
Deck Dbottom Mpa -0.875 -0.859 -0.843 -0.628 -0.334 -0.3134 -0.063 0.10127 0.1379
Gtop Mpa 1.8886 1.9399 1.9625 3.2147 5.9947 6.0064 6.619 7.23954 7.7104
Girder Gbottom Mpa 7.7455 7.6849 7.6535 9.2046 12.053 12.026 11.32 10.7262 10.349
SECTION PROPERTIES
Sections unit Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Section at m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
Properties of Precast Section
Area m2 1.9297 1.9297 1.9297 1.9297 1.9297 1.4394 0.9447 0.9447 0.9447 0.9447 0.945
I gross m4 0.872 0.872 0.872 0.872 0.872 0.7401 0.6069 0.6069 0.6069 0.6069 0.607
yb m 1.1677 1.1677 1.1677 1.1677 1.1677 1.16 1.1524 1.1524 1.1524 1.1524 1.152
yt m 1.1323 1.1323 1.1323 1.1323 1.1323 1.14 1.1476 1.1476 1.1476 1.1476 1.148
Properties of Composite Section
Area m2 2.5025 2.5025 2.5025 2.5025 2.5025 2.0122 1.5175 1.5175 1.5175 1.5175 1.517
I gross m4 1.556 1.556 1.556 1.556 1.556 1.3655 1.1732 1.1732 1.1732 1.1732 1.173
yb m 1.452 1.452 1.452 1.452 1.452 1.5391 1.6271 1.6271 1.6271 1.6271 1.627
yt m 1.068 1.068 1.068 1.068 1.068 0.9809 0.8929 0.8929 0.8929 0.8929 0.893
Gtop m 0.848 0.848 0.848 0.848 0.848 0.7609 0.6729 0.6729 0.6729 0.6729 0.673
Transfer brg.
Dtop Mpa 0 0 0 0 0 0 0 0 0 0 0
Deck Dbottom Mpa 0 0 0 0 0 0 0 0 0 0 0
Gtop Mpa 0 0 0 0 0 0 0 0 0 0 0
Stresses Girder
At Gbottom Mpa 0 0 0 0 0 0 0 0 0 0 0
SIDL
Dtop Mpa 0 0 0 0 0 0 0 0 0 0 0
Deck Dbottom Mpa 0 0 0 0 0 0 0 0 0 0 0
Gtop Mpa 0 0 0 0 0 0 0 0 0 0 0
Stresses Girder
At Gbottom Mpa 0 0 0 0 0 0 0 0 0 0 0
Section At unit Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
Surfacing
Dtop Mpa 0 0 0 0.0115 0.0211 0.1118 0.2074 0.2199 0.3759 0.4694 0.5
Deck Dbottom Mpa 0 0 0 0.0091 0.0168 0.0867 0.1563 0.1657 0.2833 0.3538 0.377
Gtop Mpa 0 0 0 0.0091 0.0168 0.0867 0.1563 0.1657 0.2833 0.3538 0.377
Stresses Girder
At Gbottom Mpa 0 0 0 -0.016 -0.029 -0.175 -0.378 -0.401 -0.685 -0.8554 -0.911
Dtop Mpa 0 0 0 0.0753 0.1474 0.8233 1.5436 1.71 2.7278 3.2263 3.528
Deck Dbottom Mpa 0 0 0 0.0598 0.117 0.6387 1.1633 1.2887 2.0557 2.4314 2.659
Gtop Mpa 0 0 0 0.0598 0.117 0.6387 1.1633 1.2887 2.0557 2.4314 2.659
Stresses Girder
At Gbottom Mpa 0 0 0 -0.102 -0.2 -1.292 -2.813 -3.116 -4.971 -5.8789 -6.429
Wind Load
Dtop Mpa 0 0 0 0.0113 0.0208 0.1101 0.2042 0.2165 0.3701 0.4622 0.492
Deck Dbottom Mpa 0 0 0 0.009 0.0165 0.0854 0.1539 0.1632 0.2789 0.3483 0.371
Gtop Mpa 0 0 0 0.009 0.0165 0.0854 0.1539 0.1632 0.2789 0.3483 0.371
Stresses Girder
At Gbottom Mpa 0 0 0 -0.015 -0.028 -0.173 -0.372 -0.395 -0.674 -0.8422 -0.897
At day 64
Dtop Mpa -0.182 -0.182 -0.182 -0.182 -0.182 -0.162 -0.122 -0.122 -0.122 -0.1218 -0.122
Deck Dbottom Mpa -0.224 -0.224 -0.224 -0.224 -0.224 -0.205 -0.167 -0.167 -0.167 -0.1668 -0.167
Gtop Mpa 0.2821 0.2821 0.2821 0.2821 0.2821 0.3007 0.3392 0.3392 0.3392 0.3392 0.339
Stresses Girder
At Gbottom Mpa -0.151 -0.151 -0.151 -0.151 -0.151 -0.148 -0.131 -0.131 -0.131 -0.1306 -0.131
At day 92
Dtop Mpa -0.173 -0.173 -0.173 -0.173 -0.173 -0.154 -0.116 -0.116 -0.116 -0.1158 -0.116
Deck Dbottom Mpa -0.213 -0.213 -0.213 -0.213 -0.213 -0.195 -0.158 -0.158 -0.158 -0.1585 -0.158
Gtop Mpa 0.2681 0.2681 0.2681 0.2681 0.2681 0.2857 0.3223 0.3223 0.3223 0.3223 0.322
Stresses Girder
At Gbottom Mpa -0.144 -0.144 -0.144 -0.144 -0.144 -0.141 -0.124 -0.124 -0.124 -0.1242 -0.124
At day 36500
Dtop Mpa -0.713 -0.713 -0.713 -0.713 -0.713 -0.635 -0.477 -0.477 -0.477 -0.4765 -0.477
Deck Dbottom Mpa -0.875 -0.875 -0.875 -0.875 -0.875 -0.803 -0.652 -0.652 -0.652 -0.6523 -0.652
Gtop Mpa 1.1035 1.1035 1.1035 1.1035 1.1035 1.1759 1.3266 1.3266 1.3266 1.3266 1.327
Stresses Girder
At Gbottom Mpa -0.592 -0.592 -0.592 -0.592 -0.592 -0.58 -0.511 -0.511 -0.511 -0.511 -0.511
Gtop 14 To day 28 Mpa -2.54 -2.59 -2.634 -3.104 -3.151 -3.222 -4.106 -4.5852 -4.686
Girder Gbottom Mpa 8.0437 8.0982 8.1461 10.385 14.052 14.132 15.141 15.744 15.95
Gtop At day 28 Mpa 0.6638 0.4882 0.3338 -0.443 -0.432 -0.684 -3.768 -5.401 -5.664
Girder Gbottom Mpa 8.0633 8.2486 8.4114 12.144 18.142 18.412 21.773 23.677 24.09
Gtop 28 To day 35 Mpa 0.6125 0.4407 0.2898 -0.469 -0.446 -0.691 -3.682 -5.2593 -5.513
Girder Gbottom Mpa 7.9968 8.1774 8.3359 11.977 17.779 18.038 21.244 23.042 23.43
Girder Gtop 35 To day 63 Mpa 0.613 0.4433 0.2943 -0.449 -0.417 -0.657 -3.606 -5.171 -5.425
Gbottom Mpa 7.8696 8.0484 8.2051 11.774 17.428 17.684 20.886 22.702 23.1
Girder Gtop 63 To day 64 Mpa 0.6129 0.4432 0.2943 -0.449 -0.416 -0.656 -3.604 -5.1682 -5.423
Gbottom Mpa 7.8666 8.0453 8.2019 11.769 17.419 17.675 20.875 22.691 23.09
Girder Gtop 64 To day 92 Mpa 0.6164 0.4478 0.3 -0.434 -0.394 -0.633 -3.558 -5.1144 -5.369
Gbottom Mpa 7.7954 7.9731 8.1287 11.655 17.224 17.478 20.67 22.488 22.89
Gtop 92 To day 36500 Mpa 0.6515 0.5002 0.3677 -0.25 -0.148 -0.357 -2.927 -4.2979 -4.517
Girder Gbottom Mpa 6.8121 6.9712 7.11 10.101 14.632 14.852 17.651 19.239 19.58
5) Rare Combination LC-SR5 : At day 63 At the time of transfer over permanent bearings
Sections unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Distance m 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
A) Stresses due to Prestress force Load factor = 1
Gtop Mpa 0.613 0.4433 0.2943 -0.449 -0.417 -0.657 -3.606 -5.171 -5.425
Girder Gbottom Mpa 7.8696 8.0484 8.2051 11.774 17.428 17.684 20.886 22.702 23.1
Deck Dbottom Mpa 0 0.0388 0.0791 0.4416 0.8118 0.866 1.5314 1.999 2.067
Gtop Mpa 0 0.0388 0.0791 0.4416 0.8118 0.866 1.5314 1.999 2.067
Girder Gbottom Mpa 0 -0.067 -0.135 -0.893 -1.963 -2.094 -3.703 -4.8333 -4.999
G) Stresses due to differential shrinkage Load factor = 1
Dtop Mpa -0.173 -0.173 -0.173 -0.154 -0.116 -0.116 -0.116 -0.1158 -0.116
Deck Dbottom Mpa -0.213 -0.213 -0.213 -0.195 -0.158 -0.158 -0.158 -0.1585 -0.158
Gtop Mpa 0.2681 0.2681 0.2681 0.2857 0.3223 0.3223 0.3223 0.3223 0.322
Girder Gbottom Mpa -0.144 -0.144 -0.144 -0.141 -0.124 -0.124 -0.124 -0.1242 -0.124
G) Stresses due to wind Load factor = 0.6
Dtop Mpa 0 0.0068 0.0125 0.066 0.1225 0.1299 0.2221 0.2773 0.295
Deck Dbottom Mpa 0 0.0054 0.0099 0.0512 0.0923 0.0979 0.1674 0.209 0.223
Gtop Mpa 0 0.0054 0.0099 0.0512 0.0923 0.0979 0.1674 0.209 0.223
Girder Gbottom Mpa 0 -0.009 -0.017 -0.104 -0.223 -0.237 -0.405 -0.5053 -0.538
Total Stresses (A+B +C+D+E+F+G) (Without SV Loading)
Dtop Mpa -0.173 -0.087 -0.005 0.7808 1.6352 1.8141 2.9879 3.58 3.912
Deck Dbottom Mpa -0.213 -0.144 -0.079 0.5303 1.1611 1.2959 2.1805 2.6267 2.877
Gtop Mpa 0.8733 0.993 1.0788 2.7464 5.7777 5.9206 7.3828 8.4055 9.104
Girder Gbottom Mpa 7.6631 7.4966 7.3671 7.8398 9.3604 9.0415 6.5766 5.1747 4.271
Total Stresses (A+B +C+D+E+F+G) (With SV Loading)
Dtop Mpa -0.173 -0.113 -0.053 0.5267 1.1689 1.2533 2.2922 3.0062 3.127
Deck Dbottom Mpa -0.213 -0.165 -0.117 0.3332 0.8096 0.8733 1.6562 2.1943 2.286
Gtop Mpa 0.8733 0.9721 1.0409 2.5493 5.4263 5.4979 6.8585 7.9731 8.512
Girder Gbottom Mpa 7.6631 7.5324 7.432 8.2385 10.21 10.063 7.8443 6.2203 5.701
Total Stresses (A+B +C+D+E+F+G) wind downward
Dtop Mpa -0.173 -0.08 0.0077 0.8468 1.7577 1.944 3.21 3.8573 4.207
Deck Dbottom Mpa -0.213 -0.138 -0.069 0.5815 1.2534 1.3938 2.3479 2.8357 3.1
Gtop Mpa 0.8733 0.9984 1.0888 2.7976 5.8701 6.0185 7.5502 8.6145 9.326
Girder Gbottom Mpa 7.6631 7.4874 7.3501 7.7362 9.1372 8.8047 6.1719 4.6694 3.733
Total Stresses (A+B +C+D+E+F+G) wind upward
Dtop Mpa -0.173 -0.093 -0.017 0.7148 1.5127 1.6842 2.7659 3.3026 3.617
Deck Dbottom Mpa -0.213 -0.149 -0.089 0.479 1.0688 1.198 2.0132 2.4177 2.654
Gtop Mpa 0.8733 0.9877 1.0689 2.6952 5.6854 5.8227 7.2154 8.1965 8.881
Girder Gbottom Mpa 7.6631 7.5059 7.3841 7.9434 9.5836 9.2782 6.9812 5.68 4.809
Gtop Mpa -0.009 0.1128 0.2179 1.3038 2.6866 2.8422 4.7883 5.9559 6.345
Girder Gbottom Mpa 0.0098 -0.116 -0.225 -1.327 -2.698 -2.854 -4.808 -5.9803 -6.371
Girder Gbottom Mpa 6.8121 6.9712 7.11 10.101 14.632 14.852 17.651 19.239 19.58
Sections unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Distance m 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
8) Rare Combination LC-SR8 : At day 36500
Total Stresses (A+B)
Gtop Mpa 1.7438 1.8807 1.9819 3.8205 7.0285 7.2011 9.0184 10.226 10.96
Girder Gbottom Mpa 6.2317 6.0467 5.9003 5.8466 6.3816 6.0287 3.1709 1.5387 0.569
8.1) Rare Combination LC-SR8.1 : At day 36500 + temperature stresses
Total Stresses (A+B)
Gtop Mpa 0.9519 1.0889 1.1901 3.1029 6.3858 6.5583 8.3757 9.5835 10.32
Girder Gbottom Mpa 7.9152 7.7301 7.5837 7.2557 7.5139 7.161 4.3032 2.671 1.701
8.2) Rare Combination LC-SR8.2 : At day 36500 - temperature stresses
Total Stresses (A+B)
Gtop Mpa 2.1339 2.2708 2.372 4.2773 7.5525 7.725 9.5424 10.75 11.48
Girder Gbottom Mpa 4.3244 4.1394 3.993 4.1229 4.8434 4.4904 1.6326 0.0004 -0.969
8.3) Rare Combination LC-SR8.3 : At day 36500 + temperature stresses
Total Stresses (A+B)
Gtop Mpa 0.424 0.546 0.6329 2.4648 5.6664 5.8077 7.4332 8.5472 9.224
Girder Gbottom Mpa 9.0375 8.878 8.7561 8.5181 8.972 8.6948 6.3007 4.8955 4.064
8.4) Rare Combination LC-SR8.4 : At day 36500 - temperature stresses
Total Stresses (A+B)
Gtop Mpa 2.394 2.516 2.6029 4.4221 7.611 7.7522 9.3777 10.492 11.17
Girder Gbottom Mpa 3.0529 2.8934 2.7715 3.2968 4.521 4.2438 1.8497 0.4446 -0.387
Dtop Mpa -0.173 -0.105 -0.042 0.575 1.2493 1.3866 2.306 2.7734 3.03
Deck Dbottom Mpa -0.213 -0.159 -0.108 0.3706 0.8703 0.9737 1.6666 2.0189 2.212
Gtop Mpa 0.8733 0.9781 1.0496 2.5867 5.4869 5.5984 6.8689 7.7977 8.439
Girder Gbottom Mpa 7.6631 7.5222 7.4172 8.1628 10.064 9.8204 7.8192 6.6444 5.878
Total Stresses (A+B +C+D+E+F+G) (With SV Loading)
Dtop Mpa -0.173 -0.125 -0.077 0.3844 0.8995 0.966 1.7842 2.343 2.442
Deck Dbottom Mpa -0.213 -0.174 -0.137 0.2228 0.6067 0.6568 1.2734 1.6945 1.769
Gtop Mpa 0.8733 0.9624 1.0212 2.4389 5.2233 5.2814 6.4756 7.4733 7.995
Girder Gbottom Mpa 7.6631 7.5491 7.4659 8.4618 10.701 10.587 8.77 7.4286 6.95
Total Stresses (A+B +C+D+E+F+G) wind downward
Dtop Mpa -0.173 -0.1 -0.031 0.63 1.3514 1.4949 2.491 3.0045 3.276
Deck Dbottom Mpa -0.213 -0.154 -0.1 0.4133 0.9472 1.0553 1.8061 2.193 2.398
Gtop Mpa 0.8733 0.9826 1.0579 2.6294 5.5638 5.68 7.0083 7.9718 8.624
Girder Gbottom Mpa 7.6631 7.5145 7.4031 8.0765 9.8775 9.6232 7.482 6.2233 5.429
Total Stresses (A+B +C+D+E+F+G) wind upward
Dtop Mpa -0.173 -0.111 -0.052 0.52 1.1472 1.2783 2.1209 2.5423 2.784
Deck Dbottom Mpa -0.213 -0.163 -0.116 0.3279 0.7933 0.8921 1.5271 1.8447 2.027
Gtop Mpa 0.8733 0.9736 1.0413 2.544 5.41 5.5168 6.7294 7.6235 8.254
Girder Gbottom Mpa 7.6631 7.5299 7.4314 8.2491 10.25 10.018 8.1564 7.0655 6.326
Dtop Mpa 0 0.0367 0.0747 0.4269 0.8079 0.8619 1.5241 1.9894 2.057
Deck Dbottom Mpa 0 0.0291 0.0593 0.3312 0.6089 0.6495 1.1486 1.4992 1.551
Gtop Mpa 0 0.0291 0.0593 0.3312 0.6089 0.6495 1.1486 1.4992 1.551
Girder Gbottom Mpa 0 -0.05 -0.102 -0.67 -1.472 -1.57 -2.777 -3.625 -3.749
Deck Dbottom Mpa 0 0.0291 0.0593 0.3312 0.6089 0.6495 1.1486 1.4992 1.551
Gtop Mpa 0 0.0291 0.0593 0.3312 0.6089 0.6495 1.1486 1.4992 1.551
Girder Gbottom Mpa 0 -0.05 -0.102 -0.67 -1.472 -1.57 -2.777 -3.625 -3.749
Girder Gbottom Mpa 0 -0.013 -0.027 -0.179 -0.393 -0.419 -0.741 -0.9667 -1
Deck Dbottom Mpa -0.66 -0.66 -0.66 -0.598 -0.536 -0.536 -0.536 -0.5356 -0.536
Gtop Mpa -0.66 -0.66 -0.66 -0.598 -0.536 -0.536 -0.536 -0.5356 -0.536
Girder Gbottom Mpa 1.4029 1.4029 1.4029 1.1743 0.9436 0.9436 0.9436 0.9436 0.944
Total Stresses (A+B +C+D+E+F+G) (Without SV Loading)
Dtop Mpa 1.5467 1.6146 1.6783 2.444 3.329 3.4662 4.3856 4.853 5.11
Deck Dbottom Mpa -1.535 -1.481 -1.431 -0.835 -0.159 -0.056 0.6372 0.9894 1.183
Gtop Mpa 1.0839 1.2059 1.2928 3.0628 6.2021 6.3433 7.9688 9.0828 9.759
Girder Gbottom Mpa 7.6346 7.4751 7.3533 7.3438 8.0284 7.7512 5.3571 3.952 3.12
Total Stresses (A+B +C+D+E+F+G) (With SV Loading)
Dtop Mpa -0.713 -0.665 -0.617 -0.096 0.5388 0.6052 1.4234 1.9823 2.081
Deck Dbottom Mpa -0.875 -0.837 -0.799 -0.385 0.1129 0.1629 0.7796 1.2007 1.275
Gtop Mpa 1.7438 1.8501 1.9242 3.5131 6.4741 6.5619 8.1112 9.2941 9.851
Girder Gbottom Mpa 6.2317 6.0991 5.9991 6.4686 7.7221 7.574 5.3643 3.7926 3.249
Girder Gbottom Mpa -1.589 -1.589 -1.589 -1.436 -1.282 -1.282 -1.282 -1.2819 -1.282
Total Stresses (A+B +C+D+E+F+G) (Without SV Loading)
Dtop Mpa -2.129 -2.061 -1.997 -1.275 -0.435 -0.297 0.6221 1.0895 1.346
Deck Dbottom Mpa -0.55 -0.496 -0.446 0.1433 0.8131 0.9166 1.6094 1.9617 2.155
Gtop Mpa 2.0689 2.1909 2.2778 4.0415 7.1743 7.3155 8.9411 10.055 10.73
Girder Gbottom Mpa 4.6423 4.4828 4.361 4.7332 5.8029 5.5257 3.1316 1.7265 0.894
Total Stresses (A+B +C+D+E+F+G) (With SV Loading)
Dtop Mpa -0.713 -0.665 -0.617 -0.096 0.5388 0.6052 1.4234 1.9823 2.081
Deck Dbottom Mpa -0.875 -0.837 -0.799 -0.385 0.1129 0.1629 0.7796 1.2007 1.275
Gtop Mpa 1.7438 1.8501 1.9242 3.5131 6.4741 6.5619 8.1112 9.2941 9.851
Girder Gbottom Mpa 6.2317 6.0991 5.9991 6.4686 7.7221 7.574 5.3643 3.7926 3.249
Deck Dbottom Mpa -0.485 -0.464 -0.445 -0.132 0.2606 0.2951 0.5661 0.7117 0.78
Gtop Mpa 2.1339 2.223 2.2784 3.7663 6.6218 6.6941 7.8978 8.8051 9.357
Girder Gbottom Mpa 4.3244 4.2212 4.1533 5.1565 7.0935 6.9831 5.609 4.7035 4.174
Total Stresses (A+B +C+D+E+F+G) (With SV Loading)
Dtop Mpa -0.713 -0.692 -0.672 -0.409 -0.054 -0.027 0.3058 0.5234 0.572
Deck Dbottom Mpa -0.875 -0.859 -0.843 -0.628 -0.334 -0.313 -0.063 0.1013 0.138
Gtop Mpa 1.7438 1.8287 1.8808 3.2702 6.0276 6.0856 7.2689 8.1946 8.714
Girder Gbottom Mpa 6.2317 6.1357 6.0736 6.9599 8.8018 8.7257 7.4008 6.4509 5.998
Gtop Mpa 0 0 0 0 0 0 0 0 0
Girder Gbottom Mpa 0 0 0 0 0 0 0 0 0
E) Stresses due to surfacing Load factor = 1
Dtop Mpa 0 0.0115 0.0211 0.1118 0.2074 0.2199 0.3759 0.4694 0.5
Deck Dbottom Mpa 0 0.0091 0.0168 0.0867 0.1563 0.1657 0.2833 0.3538 0.377
Gtop Mpa 0 0.0091 0.0168 0.0867 0.1563 0.1657 0.2833 0.3538 0.377
Girder Gbottom Mpa 0 -0.016 -0.029 -0.175 -0.378 -0.401 -0.685 -0.8554 -0.911
F) Stresses due to Live load Load factor = 0
Dtop Mpa 0 0 0 0 0 0 0 0 0
Deck Dbottom Mpa 0 0 0 0 0 0 0 0 0
Gtop Mpa 0 0 0 0 0 0 0 0 0
Girder Gbottom Mpa 0 0 0 0 0 0 0 0 0
Gtop Mpa 1.0839 1.1611 1.205 2.5838 5.3296 5.3768 6.427 7.2592 7.765
Girder Gbottom Mpa 7.6346 7.5519 7.5035 8.3128 10.138 10.088 9.085 8.3611 7.941
1.2) QSP Combination LC-SQ1.2 : At day 92 Structure open to LL - temperature stresses
Total Stresses (A+B)
Gtop Mpa 1.1984 1.2584 1.2869 2.4883 5.0511 5.0686 5.7637 6.4107 6.882
Girder Gbottom Mpa 6.0737 6.0095 5.9781 7.6954 10.891 10.875 10.265 9.7717 9.417
2.2) QSP Combination LC-SQ2.2 : At day 36500 - temperature stresses
Total Stresses (A+B)
Gtop Mpa 2.0689 2.1461 2.19 3.5625 6.3018 6.349 7.3993 8.2315 8.737
Girder Gbottom Mpa 4.6423 4.5596 4.5112 5.7022 7.9125 7.8626 6.8595 6.1357 5.716
SECTION PROPERTIES
Sections unit Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Section at m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
Properties of Precast Section
Area m2 1.9297 1.9297 1.9297 1.9297 1.9297 1.4394 0.9447 0.9447 0.9447 0.9447 0.9447
I gross m4 0.872 0.872 0.872 0.872 0.872 0.7401 0.6069 0.6069 0.6069 0.6069 0.6069
yb m 1.1677 1.1677 1.1677 1.1677 1.1677 1.16 1.1524 1.1524 1.1524 1.1524 1.1524
yt m 1.1323 1.1323 1.1323 1.1323 1.1323 1.14 1.1476 1.1476 1.1476 1.1476 1.1476
Properties of Composite Section
Area m2 2.5546 2.5546 2.5546 2.5546 2.5546 2.0643 1.5696 1.5696 1.5696 1.5696 1.5696
I gross m4 1.6031 1.6031 1.6031 1.6031 1.6031 1.4046 1.2043 1.2043 1.2043 1.2043 1.2043
yb m 1.4715 1.4715 1.4715 1.4715 1.4715 1.5619 1.653 1.653 1.653 1.653 1.653
yt m 1.0485 1.0485 1.0485 1.0485 1.0485 0.9581 0.867 0.867 0.867 0.867 0.867
Gtop m 0.8285 0.8285 0.8285 0.8285 0.8285 0.7381 0.647 0.647 0.647 0.647 0.647
Transfer brg.
Dtop Mpa 0 0 0 0 0 0 0 0 0 0 0
Deck Dbottom Mpa 0 0 0 0 0 0 0 0 0 0 0
Gtop Mpa 0 0 0 0 0 0 0 0 0 0 0
Stresses Girder
At Gbottom Mpa 0 0 0 0 0 0 0 0 0 0 0
SIDL
Dtop Mpa 0 0 0 0 0 0 0 0 0 0 0
Deck Dbottom Mpa 0 0 0 0 0 0 0 0 0 0 0
Gtop Mpa 0 0 0 0 0 0 0 0 0 0 0
Stresses Girder
At Gbottom Mpa 0 0 0 0 0 0 0 0 0 0 0
Section At unit Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
Surfacing
Dtop Mpa 0 0 0 0.0107 0.0201 0.1063 0.1964 0.2083 0.3559 0.4423 0.4729
Deck Dbottom Mpa 0 0 0 0.0084 0.0159 0.0819 0.1466 0.1555 0.2656 0.3301 0.3529
Gtop Mpa 0 0 0 0.0084 0.0159 0.0819 0.1466 0.1555 0.2656 0.3301 0.3529
Stresses Girder
At Gbottom Mpa 0 0 0 -0.015 -0.028 -0.173 -0.375 -0.397 -0.679 -0.843 -0.902
Wind Load
Dtop Mpa 0 0 0 0.0105 0.0198 0.1047 0.1934 0.2051 0.3504 0.4355 0.4656
Deck Dbottom Mpa 0 0 0 0.0083 0.0157 0.0806 0.1443 0.1531 0.2615 0.325 0.3475
Gtop Mpa 0 0 0 0.0083 0.0157 0.0806 0.1443 0.1531 0.2615 0.325 0.3475
Stresses Girder
At Gbottom Mpa 0 0 0 -0.015 -0.028 -0.171 -0.369 -0.391 -0.668 -0.83 -0.888
At day 64
Dtop Mpa -0.182 -0.182 -0.182 -0.182 -0.182 -0.162 -0.122 -0.122 -0.122 -0.122 -0.122
Deck Dbottom Mpa -0.224 -0.224 -0.224 -0.224 -0.224 -0.205 -0.167 -0.167 -0.167 -0.167 -0.167
Gtop Mpa 0.2821 0.2821 0.2821 0.2821 0.2821 0.3007 0.3392 0.3392 0.3392 0.3392 0.3392
Stresses Girder
At Gbottom Mpa -0.151 -0.151 -0.151 -0.151 -0.151 -0.148 -0.131 -0.131 -0.131 -0.131 -0.131
At day 92
Dtop Mpa -0.173 -0.173 -0.173 -0.173 -0.173 -0.154 -0.116 -0.116 -0.116 -0.116 -0.116
Deck Dbottom Mpa -0.213 -0.213 -0.213 -0.213 -0.213 -0.195 -0.158 -0.158 -0.158 -0.158 -0.158
Gtop Mpa 0.2681 0.2681 0.2681 0.2681 0.2681 0.2857 0.3223 0.3223 0.3223 0.3223 0.3223
Stresses Girder
At Gbottom Mpa -0.144 -0.144 -0.144 -0.144 -0.144 -0.141 -0.124 -0.124 -0.124 -0.124 -0.124
At day 36500
Dtop Mpa -0.713 -0.713 -0.713 -0.713 -0.713 -0.635 -0.477 -0.477 -0.477 -0.477 -0.477
Deck Dbottom Mpa -0.875 -0.875 -0.875 -0.875 -0.875 -0.803 -0.652 -0.652 -0.652 -0.652 -0.652
Gtop Mpa 1.1035 1.1035 1.1035 1.1035 1.1035 1.1759 1.3266 1.3266 1.3266 1.3266 1.3266
Stresses Girder
At Gbottom Mpa -0.592 -0.592 -0.592 -0.592 -0.592 -0.58 -0.511 -0.511 -0.511 -0.511 -0.511
Gtop 14 To day 28 Mpa -3.104 -3.166 -3.22 -3.794 -3.851 -3.939 -5.018 -5.604 -5.727
Girder Gbottom Mpa 9.8312 9.8978 9.9563 12.693 17.175 17.273 18.506 19.243 19.492
Gtop At day 28 Mpa 0.8114 0.5966 0.408 -0.542 -0.528 -0.836 -4.605 -6.601 -6.922
Girder Gbottom Mpa 9.8551 10.082 10.281 14.842 22.173 22.504 26.611 28.939 29.439
Gtop 28 To day 35 Mpa 0.7486 0.5387 0.3542 -0.573 -0.546 -0.845 -4.501 -6.428 -6.738
Girder Gbottom Mpa 9.7739 9.9946 10.188 14.639 21.73 22.047 25.964 28.163 28.64
Girder Gtop 35 To day 63 Mpa 0.7492 0.5418 0.3597 -0.549 -0.509 -0.803 -4.408 -6.32 -6.631
Gbottom Mpa 9.6184 9.8369 10.028 14.39 21.301 21.614 25.527 27.747 28.238
Girder Gtop 63 To day 64 Mpa 0.7491 0.5417 0.3597 -0.548 -0.508 -0.802 -4.405 -6.317 -6.628
Gbottom Mpa 9.6147 9.8331 10.025 14.384 21.29 21.603 25.514 27.733 28.224
Girder Gtop 64 To day 92 Mpa 0.7533 0.5473 0.3666 -0.53 -0.482 -0.773 -4.349 -6.251 -6.562
Gbottom Mpa 9.5277 9.7449 9.9351 14.245 21.051 21.362 25.263 27.486 27.983
Gtop 92 To day 36500 Mpa 0.7963 0.6113 0.4494 -0.305 -0.181 -0.436 -3.577 -5.253 -5.521
Girder Gbottom Mpa 8.3259 8.5203 8.6899 12.346 17.884 18.153 21.573 23.514 23.931
Gtop Mpa -3.113 -3.053 -3.002 -2.49 -1.164 -1.096 -0.23 0.3518 0.6182
Girder Gbottom Mpa 9.841 9.7815 9.7317 11.366 14.477 14.419 13.698 13.263 13.121
5) Rare Combination LC-SR5 : At day 63 At the time of transfer over permanent bearings
Sections unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Distance m 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
A) Stresses due to Prestress force Load factor = 1
Gtop Mpa 0.7492 0.5418 0.3597 -0.549 -0.509 -0.803 -4.408 -6.32 -6.631
Girder Gbottom Mpa 9.6184 9.8369 10.028 14.39 21.301 21.614 25.527 27.747 28.238
Gtop Mpa -0.006 0.066 0.1344 0.9498 2.0148 2.0944 3.7527 4.7957 5.0651
Girder Gbottom Mpa 0.0063 -0.068 -0.139 -0.967 -2.023 -2.103 -3.768 -4.815 -5.086
Gtop Mpa 0 0.005 0.0094 0.0484 0.0866 0.0918 0.1569 0.195 0.2085
Girder Gbottom Mpa 0 -0.009 -0.017 -0.102 -0.221 -0.235 -0.401 -0.498 -0.533
Total Stresses (A+B +C+D+E+F)
Dtop Mpa -0.182 -0.172 -0.162 -0.056 0.0746 0.0865 0.234 0.3205 0.3511
Deck Dbottom Mpa -0.224 -0.215 -0.208 -0.123 -0.02 -0.011 0.0988 0.1633 0.1861
Gtop Mpa 1.0156 1.0111 1.0101 2.088 4.679 4.629 4.7408 5.1042 5.4747
Girder Gbottom Mpa 9.4795 9.4824 9.4817 11.769 16.064 16.118 16.129 15.963 15.735
Total Stresses (A+B +C+D+E+F+G) wind downward
Dtop Mpa -0.182 -0.165 -0.15 0.0067 0.1907 0.2096 0.4443 0.5818 0.6304
Deck Dbottom Mpa -0.224 -0.21 -0.199 -0.075 0.0664 0.0805 0.2557 0.3583 0.3946
Gtop Mpa 1.0156 1.0161 1.0195 2.1364 4.7656 4.7209 4.8977 5.2992 5.6832
Girder Gbottom Mpa 9.4795 9.4735 9.465 11.667 15.843 15.883 15.728 15.465 15.202
Total Stresses (A+B +C+D+E+F+G) wind upward
Dtop Mpa -0.182 -0.178 -0.174 -0.119 -0.041 -0.037 0.0238 0.0592 0.0717
Deck Dbottom Mpa -0.224 -0.22 -0.217 -0.172 -0.107 -0.103 -0.058 -0.032 -0.022
Gtop Mpa 1.0156 1.0061 1.0007 2.0396 4.5924 4.5372 4.5839 4.9092 5.2663
Girder Gbottom Mpa 9.4795 9.4913 9.4984 11.871 16.285 16.353 16.53 16.462 16.267
Dtop Mpa 0 0 0 0 0 0 0 0 0
Deck Dbottom Mpa 0 0 0 0 0 0 0 0 0
Gtop Mpa 0 0 0 0 0 0 0 0 0
Girder Gbottom Mpa 0 0 0 0 0 0 0 0 0
E) Stresses due to placement of SIDL Load factor = 1
Dtop Mpa 0 0 0 0 0 0 0 0 0
Deck Dbottom Mpa 0 0 0 0 0 0 0 0 0
Gtop Mpa 0 0 0 0 0 0 0 0 0
Girder Gbottom Mpa 0 0 0 0 0 0 0 0 0
E) Stresses due to surfacing Load factor = 1
Dtop Mpa 0 0.0107 0.0201 0.1063 0.1964 0.2083 0.3559 0.4423 0.4729
Deck Dbottom Mpa 0 0.0084 0.0159 0.0819 0.1466 0.1555 0.2656 0.3301 0.3529
Gtop Mpa 0 0.0084 0.0159 0.0819 0.1466 0.1555 0.2656 0.3301 0.3529
Girder Gbottom Mpa 0 -0.015 -0.028 -0.173 -0.375 -0.397 -0.679 -0.843 -0.902
F) Stresses due to Live load (Without SV) Load factor = 1
Dtop Mpa 0 0.1058 0.1761 0.7787 1.3087 1.3811 1.8455 2.319 2.3818
Deck Dbottom Mpa 0 0.0836 0.1392 0.5999 0.9766 1.0306 1.3772 1.7306 1.7774
Gtop Mpa 0 0.0836 0.1392 0.5999 0.9766 1.0306 1.3772 1.7306 1.7774
Girder Gbottom Mpa 0 -0.149 -0.247 -1.269 -2.495 -2.633 -3.519 -4.422 -4.541
F.1) Stresses due to Live load (With SV) Load factor = 1
Dtop Mpa 0 0.0466 0.0949 0.5406 1.0189 1.0869 1.9221 2.5089 2.5948
Deck Dbottom Mpa 0 0.0368 0.075 0.4165 0.7604 0.8111 1.4343 1.8722 1.9363
Gtop Mpa 0 0.0368 0.075 0.4165 0.7604 0.8111 1.4343 1.8722 1.9363
Girder Gbottom Mpa 0 -0.065 -0.133 -0.881 -1.943 -2.073 -3.665 -4.784 -4.948
G) Stresses due to differential shrinkage Load factor = 1
Dtop Mpa -0.173 -0.173 -0.173 -0.154 -0.116 -0.116 -0.116 -0.116 -0.116
Deck Dbottom Mpa -0.213 -0.213 -0.213 -0.195 -0.158 -0.158 -0.158 -0.158 -0.158
Gtop Mpa 0.2681 0.2681 0.2681 0.2857 0.3223 0.3223 0.3223 0.3223 0.3223
Girder Gbottom Mpa -0.144 -0.144 -0.144 -0.141 -0.124 -0.124 -0.124 -0.124 -0.124
Gtop Mpa 0.7533 0.5473 0.3666 -0.53 -0.482 -0.773 -4.349 -6.251 -6.562
Girder Gbottom Mpa 9.5277 9.7449 9.9351 14.245 21.051 21.362 25.263 27.486 27.983
Girder Gbottom Mpa 9.4001 9.3526 9.2999 10.977 14.375 14.33 13.135 12.135 11.789
Gtop Mpa 0.7807 0.8354 0.8926 2.4467 5.4277 5.4673 6.6638 7.7009 8.1782
Girder Gbottom Mpa 8.342 8.2555 8.1652 8.9983 10.845 10.726 8.6537 7.0915 6.625
Dtop Mpa 1.9987 2.1152 2.1949 3.0697 3.9571 4.0414 4.6533 5.2133 5.3066
Deck Dbottom Mpa -1.667 -1.575 -1.512 -0.839 -0.172 -0.109 0.3477 0.7656 0.8352
Gtop Mpa 1.0923 1.1938 1.2684 3.0884 6.3278 6.3707 7.2906 8.2432 8.7031
Girder Gbottom Mpa 9.4336 9.264 9.1428 9.439 10.914 10.787 9.421 8.0748 7.6525
Total Stresses (A+B +C+D+E+F+G+H) (With SV Loading)
Dtop Mpa -0.713 -0.656 -0.598 0.0119 0.7389 0.8188 1.8014 2.4747 2.5911
Deck Dbottom Mpa -0.875 -0.83 -0.785 -0.305 0.2547 0.3143 1.0476 1.55 1.6369
Gtop Mpa 1.8841 1.9389 1.9961 3.6226 6.7543 6.794 7.9904 9.0276 9.5048
Girder Gbottom Mpa 7.7501 7.6637 7.5733 8.4181 10.334 10.215 8.1427 6.5805 6.114
Girder Gbottom Mpa 0 -0.049 -0.1 -0.661 -1.457 -1.554 -2.749 -3.588 -3.711
Deck Dbottom Mpa 0 0.0627 0.1044 0.4499 0.7324 0.773 1.0329 1.2979 1.333
Gtop Mpa 0 0.0627 0.1044 0.4499 0.7324 0.773 1.0329 1.2979 1.333
Girder Gbottom Mpa 0 -0.111 -0.185 -0.952 -1.871 -1.975 -2.639 -3.316 -3.406
F.1) Stresses due to Live load (With SV) Load factor = 0.75
Dtop Mpa 0 0.035 0.0712 0.4054 0.7642 0.8152 1.4416 1.8817 1.9461
Deck Dbottom Mpa 0 0.0276 0.0563 0.3123 0.5703 0.6083 1.0757 1.4042 1.4522
Gtop Mpa 0 0.0276 0.0563 0.3123 0.5703 0.6083 1.0757 1.4042 1.4522
Girder Gbottom Mpa 0 -0.049 -0.1 -0.661 -1.457 -1.554 -2.749 -3.588 -3.711
Gtop Mpa 1.0156 1.0111 1.0101 2.088 4.679 4.629 4.7408 5.1042 5.4747
Girder Gbottom Mpa 9.4795 9.4824 9.4817 11.769 16.064 16.118 16.129 15.963 15.735
7) Rare Combination LC-SR7 : At day 92 Structure open to LL
Total Stresses (A+B)
Gtop Mpa 1.0058 1.0863 1.1421 2.691 5.665 5.6716 6.1574 6.8837 7.3007
Girder Gbottom Mpa 9.4001 9.2532 9.1526 10.368 13.337 13.251 12.365 11.301 10.958
7.1) Rare Combination LC-SR7.1 : At day 92 Structure open to LL + temperature stresses
Total Stresses (A+B)
Gtop Mpa 0.2139 0.2945 0.3502 1.9734 5.0222 5.0289 5.5147 6.241 6.658
Girder Gbottom Mpa 11.084 10.937 10.836 11.778 14.469 14.383 13.498 12.433 12.091
7.2) Rare Combination LC-SR7.2 : At day 92 Structure open to LL - temperature stresses
Total Stresses (A+B)
Gtop Mpa 1.3959 1.4764 1.5322 3.1478 6.1889 6.1956 6.6814 7.4077 7.8247
Girder Gbottom Mpa 7.4927 7.3459 7.2453 8.6449 11.798 11.713 10.827 9.7623 9.4201
7.3) Rare Combination LC-SR7.3 : At day 92 Structure open to LL + temperature stresses
Total Stresses (A+B)
Gtop Mpa -0.314 -0.254 -0.212 1.345 4.3496 4.3427 4.7419 5.3798 5.7852
Girder Gbottom Mpa 12.206 12.096 12.02 13.034 15.848 15.796 15.132 14.293 13.981
7.4) Rare Combination LC-SR7.4 : At day 92 Structure open to LL - temperature stresses
Total Stresses (A+B)
Gtop Mpa 1.656 1.7156 1.7575 3.3023 6.2941 6.2872 6.6864 7.3243 7.7297
Girder Gbottom Mpa 6.2212 6.1115 6.0356 7.8131 11.397 11.345 10.681 9.8422 9.5299
Sections unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Distance m 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
8) Rare Combination LC-SR8 : At day 36500
Total Stresses (A+B)
Gtop Mpa 1.8841 1.9857 2.0603 3.8061 6.9705 7.0135 7.9333 8.8859 9.3458
Girder Gbottom Mpa 7.7501 7.5806 7.4594 8.0299 9.7819 9.6546 8.2887 6.9425 6.5202
8.1) Rare Combination LC-SR8.1 : At day 36500 + temperature stresses
Total Stresses (A+B)
Gtop Mpa 1.0923 1.1938 1.2684 3.0884 6.3278 6.3707 7.2906 8.2432 8.7031
Girder Gbottom Mpa 9.4336 9.264 9.1428 9.439 10.914 10.787 9.421 8.0748 7.6525
8.2) Rare Combination LC-SR8.2 : At day 36500 - temperature stresses
Total Stresses (A+B)
Gtop Mpa 2.2742 2.3758 2.4504 4.2628 7.4945 7.5374 8.4573 9.4099 9.8698
Girder Gbottom Mpa 5.8428 5.6733 5.5521 6.3063 8.2437 8.1163 6.7504 5.4042 4.9819
8.3) Rare Combination LC-SR8.3 : At day 36500 + temperature stresses
Total Stresses (A+B)
Gtop Mpa 0.5643 0.645 0.7057 2.46 5.6551 5.6846 6.5178 7.382 7.8303
Girder Gbottom Mpa 10.556 10.423 10.327 10.696 12.293 12.2 11.056 9.9351 9.5427
8.4) Rare Combination LC-SR8.4 : At day 36500 - temperature stresses
Total Stresses (A+B)
Gtop Mpa 2.5343 2.6149 2.6756 4.4173 7.5996 7.6291 8.4623 9.3265 9.7748
Girder Gbottom Mpa 4.5713 4.4389 4.3423 5.4745 7.842 7.7491 6.6046 5.4841 5.0917
Girder Gbottom Mpa 0.0063 -0.068 -0.139 -0.967 -2.023 -2.103 -3.768 -4.815 -5.086
Girder Gbottom Mpa -1.589 -1.589 -1.589 -1.436 -1.282 -1.282 -1.282 -1.282 -1.282
Total Stresses (A+B +C+D+E+F+G)
Dtop Mpa -1.589 -1.578 -1.569 -1.418 -1.242 -1.231 -1.083 -0.997 -0.966
Deck Dbottom Mpa 0.1124 0.1208 0.1283 0.2674 0.4247 0.4336 0.5437 0.6082 0.6311
Gtop Mpa 1.3309 1.3278 1.328 2.4717 5.125 5.0776 5.2169 5.5898 5.96
Girder Gbottom Mpa 7.8106 7.8123 7.8104 10.202 14.55 14.602 14.602 14.44 14.218
SECTION PROPERTIES
Sections unit Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Section at m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
Properties of Precast Section
Area m2 1.9297 1.9297 1.9297 1.9297 1.9297 1.4394 0.9447 0.9447 0.9447 0.9447 0.9447
I gross m4 0.872 0.872 0.872 0.872 0.872 0.7401 0.6069 0.6069 0.6069 0.6069 0.6069
yb m 1.1677 1.1677 1.1677 1.1677 1.1677 1.16 1.1524 1.1524 1.1524 1.1524 1.1524
yt m 1.1323 1.1323 1.1323 1.1323 1.1323 1.14 1.1476 1.1476 1.1476 1.1476 1.1476
Properties of Composite Section
Area m2 2.5546 2.5546 2.5546 2.5546 2.5546 2.0643 1.5696 1.5696 1.5696 1.5696 1.5696
I gross m4 1.6031 1.6031 1.6031 1.6031 1.6031 1.4046 1.2043 1.2043 1.2043 1.2043 1.2043
yb m 1.4715 1.4715 1.4715 1.4715 1.4715 1.5619 1.653 1.653 1.653 1.653 1.653
yt m 1.0485 1.0485 1.0485 1.0485 1.0485 0.9581 0.867 0.867 0.867 0.867 0.867
Gtop m 0.8285 0.8285 0.8285 0.8285 0.8285 0.7381 0.647 0.647 0.647 0.647 0.647
Transfer brg.
Dtop Mpa 0 0 0 0 0 0 0 0 0 0 0
Deck Dbottom Mpa 0 0 0 0 0 0 0 0 0 0 0
Gtop Mpa 0 0 0 0 0 0 0 0 0 0 0
Stresses Girder
At Gbottom Mpa 0 0 0 0 0 0 0 0 0 0 0
SIDL
Dtop Mpa 0 0 0 0 0 0 0 0 0 0 0
Deck Dbottom Mpa 0 0 0 0 0 0 0 0 0 0 0
Gtop Mpa 0 0 0 0 0 0 0 0 0 0 0
Stresses Girder
At Gbottom Mpa 0 0 0 0 0 0 0 0 0 0 0
Section At unit Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
Surfacing
Dtop Mpa 0 0 0 0.0107 0.0201 0.1063 0.1964 0.2083 0.3559 0.4423 0.4729
Deck Dbottom Mpa 0 0 0 0.0084 0.0159 0.0819 0.1466 0.1555 0.2656 0.3301 0.3529
Gtop Mpa 0 0 0 0.0084 0.0159 0.0819 0.1466 0.1555 0.2656 0.3301 0.3529
Stresses Girder
At Gbottom Mpa 0 0 0 -0.015 -0.028 -0.173 -0.375 -0.397 -0.679 -0.843 -0.902
Wind Load
Dtop Mpa 0 0 0 0.0105 0.0198 0.1047 0.1934 0.2051 0.3504 0.4355 0.4656
Deck Dbottom Mpa 0 0 0 0.0083 0.0157 0.0806 0.1443 0.1531 0.2615 0.325 0.3475
Gtop Mpa 0 0 0 0.0083 0.0157 0.0806 0.1443 0.1531 0.2615 0.325 0.3475
Stresses Girder
At Gbottom Mpa 0 0 0 -0.015 -0.028 -0.171 -0.369 -0.391 -0.668 -0.83 -0.888
At day 64
Dtop Mpa -0.182 -0.182 -0.182 -0.182 -0.182 -0.162 -0.122 -0.122 -0.122 -0.122 -0.122
Deck Dbottom Mpa -0.224 -0.224 -0.224 -0.224 -0.224 -0.205 -0.167 -0.167 -0.167 -0.167 -0.167
Gtop Mpa 0.2821 0.2821 0.2821 0.2821 0.2821 0.3007 0.3392 0.3392 0.3392 0.3392 0.3392
Stresses Girder
At Gbottom Mpa -0.151 -0.151 -0.151 -0.151 -0.151 -0.148 -0.131 -0.131 -0.131 -0.131 -0.131
At day 92
Dtop Mpa -0.173 -0.173 -0.173 -0.173 -0.173 -0.154 -0.116 -0.116 -0.116 -0.116 -0.116
Deck Dbottom Mpa -0.213 -0.213 -0.213 -0.213 -0.213 -0.195 -0.158 -0.158 -0.158 -0.158 -0.158
Gtop Mpa 0.2681 0.2681 0.2681 0.2681 0.2681 0.2857 0.3223 0.3223 0.3223 0.3223 0.3223
Stresses Girder
At Gbottom Mpa -0.144 -0.144 -0.144 -0.144 -0.144 -0.141 -0.124 -0.124 -0.124 -0.124 -0.124
At day 36500
Dtop Mpa -0.713 -0.713 -0.713 -0.713 -0.713 -0.635 -0.477 -0.477 -0.477 -0.477 -0.477
Deck Dbottom Mpa -0.875 -0.875 -0.875 -0.875 -0.875 -0.803 -0.652 -0.652 -0.652 -0.652 -0.652
Gtop Mpa 1.1035 1.1035 1.1035 1.1035 1.1035 1.1759 1.3266 1.3266 1.3266 1.3266 1.3266
Stresses Girder
At Gbottom Mpa -0.592 -0.592 -0.592 -0.592 -0.592 -0.58 -0.511 -0.511 -0.511 -0.511 -0.511
Gtop 14 To day 28 Mpa -2.54 -2.59 -2.634 -3.104 -3.151 -3.222 -4.106 -4.585 -4.686
Girder Gbottom Mpa 8.0437 8.0982 8.1461 10.385 14.052 14.132 15.141 15.744 15.948
Gtop At day 28 Mpa 0.6638 0.4882 0.3338 -0.443 -0.432 -0.684 -3.768 -5.401 -5.664
Girder Gbottom Mpa 8.0633 8.2486 8.4114 12.144 18.142 18.412 21.773 23.677 24.087
Gtop 28 To day 35 Mpa 0.6125 0.4407 0.2898 -0.469 -0.446 -0.691 -3.682 -5.259 -5.513
Girder Gbottom Mpa 7.9968 8.1774 8.3359 11.977 17.779 18.038 21.244 23.042 23.432
Girder Gtop 35 To day 63 Mpa 0.613 0.4433 0.2943 -0.449 -0.417 -0.657 -3.606 -5.171 -5.425
Gbottom Mpa 7.8696 8.0484 8.2051 11.774 17.428 17.684 20.886 22.702 23.103
Girder Gtop 63 To day 64 Mpa 0.6129 0.4432 0.2943 -0.449 -0.416 -0.656 -3.604 -5.168 -5.423
Gbottom Mpa 7.8666 8.0453 8.2019 11.769 17.419 17.675 20.875 22.691 23.092
Girder Gtop 64 To day 92 Mpa 0.6164 0.4478 0.3 -0.434 -0.394 -0.633 -3.558 -5.114 -5.369
Gbottom Mpa 7.7954 7.9731 8.1287 11.655 17.224 17.478 20.67 22.488 22.895
Gtop 92 To day 36500 Mpa 0.6515 0.5002 0.3677 -0.25 -0.148 -0.357 -2.927 -4.298 -4.517
Girder Gbottom Mpa 6.8121 6.9712 7.11 10.101 14.632 14.852 17.651 19.239 19.58
Gtop Mpa -2.549 -2.477 -2.416 -1.8 -0.464 -0.38 0.6822 1.3707 1.6595
Girder Gbottom Mpa 8.0535 7.9819 7.9214 9.0586 11.354 11.278 10.333 9.764 9.5766
5) Rare Combination LC-SR5 : At day 63 At the time of transfer over permanent bearings
Sections unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Distance m 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
A) Stresses due to Prestress force Load factor = 1
Gtop Mpa 0.613 0.4433 0.2943 -0.449 -0.417 -0.657 -3.606 -5.171 -5.425
Girder Gbottom Mpa 7.8696 8.0484 8.2051 11.774 17.428 17.684 20.886 22.702 23.103
Deck Dbottom Mpa 0 0.005 0.0094 0.0484 0.0866 0.0918 0.1569 0.195 0.2085
Gtop Mpa 0 0.005 0.0094 0.0484 0.0866 0.0918 0.1569 0.195 0.2085
Girder Gbottom Mpa 0 -0.009 -0.017 -0.102 -0.221 -0.235 -0.401 -0.498 -0.533
Total Stresses (A+B +C+D+E+F)
Dtop Mpa -0.182 -0.172 -0.162 -0.056 0.0746 0.0865 0.234 0.3205 0.3511
Deck Dbottom Mpa -0.224 -0.215 -0.208 -0.123 -0.02 -0.011 0.0988 0.1633 0.1861
Gtop Mpa 0.8794 0.9126 0.9447 2.1877 4.7714 4.7749 5.5417 6.2527 6.6798
Girder Gbottom Mpa 7.7314 7.6946 7.6591 9.1537 12.193 12.19 11.49 10.921 10.603
Total Stresses (A+B +C+D+E+F+G) wind downward
Dtop Mpa -0.182 -0.165 -0.15 0.0067 0.1907 0.2096 0.4443 0.5818 0.6304
Deck Dbottom Mpa -0.224 -0.21 -0.199 -0.075 0.0664 0.0805 0.2557 0.3583 0.3946
Gtop Mpa 0.8794 0.9176 0.9541 2.236 4.858 4.8667 5.6986 6.4477 6.8883
Girder Gbottom Mpa 7.7314 7.6857 7.6424 9.0514 11.972 11.956 11.089 10.423 10.07
Total Stresses (A+B +C+D+E+F+G) wind upward
Dtop Mpa -0.182 -0.178 -0.174 -0.119 -0.041 -0.037 0.0238 0.0592 0.0717
Deck Dbottom Mpa -0.224 -0.22 -0.217 -0.172 -0.107 -0.103 -0.058 -0.032 -0.022
Gtop Mpa 0.8794 0.9076 0.9353 2.1393 4.6848 4.683 5.3848 6.0577 6.4713
Girder Gbottom Mpa 7.7314 7.7034 7.6758 9.2561 12.414 12.425 11.891 11.419 11.136
Max CompressiveMaxstress
Compressive stress = 12.193 Mpa < 24 Mpa OK
Max Tensile Stress = 0.8794 Mpa >= -3.516 Mpa OK
Deck Dbottom Mpa 0 0.0836 0.1392 0.5999 0.9766 1.0306 1.3772 1.7306 1.7774
Gtop Mpa 0 0.0836 0.1392 0.5999 0.9766 1.0306 1.3772 1.7306 1.7774
Girder Gbottom Mpa 0 -0.149 -0.247 -1.269 -2.495 -2.633 -3.519 -4.422 -4.541
F.1) Stresses due to Live load (With SV) Load factor = 1
Dtop Mpa 0 0.0466 0.0949 0.5406 1.0189 1.0869 1.9221 2.5089 2.5948
Deck Dbottom Mpa 0 0.0368 0.075 0.4165 0.7604 0.8111 1.4343 1.8722 1.9363
Gtop Mpa 0 0.0368 0.075 0.4165 0.7604 0.8111 1.4343 1.8722 1.9363
Girder Gbottom Mpa 0 -0.065 -0.133 -0.881 -1.943 -2.073 -3.665 -4.784 -4.948
G) Stresses due to differential shrinkage Load factor = 1
Dtop Mpa -0.173 -0.173 -0.173 -0.154 -0.116 -0.116 -0.116 -0.116 -0.116
Deck Dbottom Mpa -0.213 -0.213 -0.213 -0.195 -0.158 -0.158 -0.158 -0.158 -0.158
Gtop Mpa 0.2681 0.2681 0.2681 0.2857 0.3223 0.3223 0.3223 0.3223 0.3223
Girder Gbottom Mpa -0.144 -0.144 -0.144 -0.141 -0.124 -0.124 -0.124 -0.124 -0.124
G) Stresses due to wind Load factor = 0.6
Dtop Mpa 0 0.0063 0.0119 0.0628 0.1161 0.1231 0.2102 0.2613 0.2794
Deck Dbottom Mpa 0 0.005 0.0094 0.0484 0.0866 0.0918 0.1569 0.195 0.2085
Gtop Mpa 0 0.005 0.0094 0.0484 0.0866 0.0918 0.1569 0.195 0.2085
Girder Gbottom Mpa 0 -0.009 -0.017 -0.102 -0.221 -0.235 -0.401 -0.498 -0.533
Total Stresses (A+B +C+D+E+F+G) (Without SV Loading)
Dtop Mpa -0.173 -0.057 0.023 0.7307 1.3894 1.4736 2.0856 2.6456 2.7389
Deck Dbottom Mpa -0.213 -0.121 -0.058 0.4867 0.9647 1.0276 1.4843 1.9021 1.9718
Gtop Mpa 0.8689 0.9868 1.0755 2.7874 5.7526 5.8122 6.9481 8.0202 8.4939
Girder Gbottom Mpa 7.6677 7.4814 7.3462 7.7784 9.5092 9.3668 7.772 6.3032 5.8706
Total Stresses (A+B +C+D+E+F+G) (With SV Loading)
Dtop Mpa -0.173 -0.116 -0.058 0.4926 1.0996 1.1795 2.1622 2.8354 2.9519
Deck Dbottom Mpa -0.213 -0.167 -0.122 0.3032 0.7485 0.8081 1.5414 2.0438 2.1307
Gtop Mpa 0.8689 0.9401 1.0113 2.604 5.5364 5.5927 7.0052 8.1619 8.6528
Girder Gbottom Mpa 7.6677 7.5645 7.4602 8.1666 10.062 9.9277 7.626 5.9412 5.4644
Total Stresses (A+B +C+D+E+F+G) wind downward
Dtop Mpa -0.173 -0.051 0.0348 0.7935 1.5054 1.5967 2.2958 2.9069 3.0183
Deck Dbottom Mpa -0.213 -0.116 -0.048 0.5351 1.0513 1.1194 1.6411 2.0971 2.1803
Gtop Mpa 0.8689 0.9918 1.0849 2.8358 5.8392 5.9041 7.105 8.2152 8.7023
Girder Gbottom Mpa 7.6677 7.4725 7.3295 7.676 9.2879 9.1322 7.3711 5.8049 5.3379
Total Stresses (A+B +C+D+E+F+G) wind upward
Dtop Mpa -0.173 -0.063 0.0111 0.6679 1.2733 1.3506 1.8754 2.3843 2.4595
Deck Dbottom Mpa -0.213 -0.126 -0.067 0.4383 0.8781 0.9357 1.3274 1.7071 1.7633
Gtop Mpa 0.8689 0.9818 1.0661 2.739 5.666 5.7204 6.7912 7.8252 8.2854
Girder Gbottom Mpa 7.6677 7.4902 7.3629 7.8808 9.7304 9.6015 8.1729 6.8014 6.4033
Max Compressive stress = 10.062 Mpa < 24 Mpa OK
Max Tensile Stress = 0.8689 Mpa >= -3.516 Mpa OK
Max Compressive stress (wind downward) = 9.2879 Mpa < 24 Mpa OK
Max Tensile Stress (wind downward) = 0.8689 Mpa >= -3.516 Mpa OK
Max Compressive stress (wind upward) = 9.7304 Mpa < 24 Mpa OK
Max Tensile Stress (wind upward) = 0.8689 Mpa >= -3.516 Mpa OK
Girder Gbottom Mpa 7.7954 7.9731 8.1287 11.655 17.224 17.478 20.67 22.488 22.895
Girder Gbottom Mpa 4.4889 4.3397 4.2292 5.223 7.5692 7.4614 6.0879 4.8448 4.4421
Total Stresses (A+B +C+D+E+F+G+H) (With SV Loading)
Dtop Mpa -0.173 -0.128 -0.082 0.3574 0.8449 0.9078 1.6816 2.2082 2.3032
Deck Dbottom Mpa -0.213 -0.177 -0.141 0.1991 0.5584 0.6053 1.1828 1.5758 1.6466
Gtop Mpa 0.8689 0.9308 0.9925 2.4999 5.3463 5.3899 6.6466 7.6938 8.1687
Girder Gbottom Mpa 7.6677 7.5808 7.4935 8.3869 10.547 10.446 8.5422 7.1371 6.7013
Gtop Mpa 1.7394 1.8745 1.9785 3.8616 7.0034 7.0927 8.5837 9.841 10.35
Girder Gbottom Mpa 6.2363 6.0314 5.8794 5.7851 6.5304 6.354 4.3663 2.6671 2.169
Total Stresses (A+B +C+D+E+F+G+H) (With SV Loading)
Dtop Mpa 0 0.0573 0.1151 0.6469 1.2154 1.2953 2.2779 2.9512 3.0677
Deck Dbottom Mpa 0 0.0453 0.0909 0.4983 0.907 0.9666 1.6999 2.2023 2.2892
Gtop Mpa 0.6359 0.7243 0.8109 2.5022 5.4605 5.5466 7.3142 8.656 9.1821
Girder Gbottom Mpa 6.8282 6.7064 6.5852 6.7536 7.5939 7.4259 4.7313 2.8161 2.2739
Dtop Mpa 2.712 2.712 2.712 2.8197 2.9285 2.9285 2.9285 2.9285 2.9285
Deck Dbottom Mpa -0.792 -0.792 -0.792 -0.718 -0.643 -0.643 -0.643 -0.643 -0.643
Gtop Mpa -0.792 -0.792 -0.792 -0.718 -0.643 -0.643 -0.643 -0.643 -0.643
Girder Gbottom Mpa 1.6835 1.6835 1.6835 1.4091 1.1323 1.1323 1.1323 1.1323 1.1323
Total Stresses (A+B +C+D+E+F+G+H) (Without SV)
Dtop Mpa 1.9987 2.1152 2.1949 3.0697 3.9571 4.0414 4.6533 5.2133 5.3066
Deck Dbottom Mpa -1.667 -1.575 -1.512 -0.839 -0.172 -0.109 0.3477 0.7656 0.8352
Gtop Mpa 0.9475 1.0826 1.1867 3.1439 6.3606 6.45 7.9409 9.1982 9.707
Girder Gbottom Mpa 7.9198 7.7149 7.5628 7.1943 7.6627 7.4863 5.4986 3.7994 3.3013
Total Stresses (A+B +C+D+E+F+G+H) (With SV Loading)
Dtop Mpa -0.713 -0.656 -0.598 0.0119 0.7389 0.8188 1.8014 2.4747 2.5911
Deck Dbottom Mpa -0.875 -0.83 -0.785 -0.305 0.2547 0.3143 1.0476 1.55 1.6369
Gtop Mpa 1.7394 1.8277 1.9144 3.6781 6.7871 6.8732 8.6408 9.9827 10.509
Girder Gbottom Mpa 6.2363 6.1145 5.9933 6.1733 7.0829 6.9149 4.2203 2.3051 1.7629
Girder Gbottom Mpa 0 -0.111 -0.185 -0.952 -1.871 -1.975 -2.639 -3.316 -3.406
F.1) Stresses due to Live load (With SV) Load factor = 0.75
Dtop Mpa 0 0.035 0.0712 0.4054 0.7642 0.8152 1.4416 1.8817 1.9461
Deck Dbottom Mpa 0 0.0276 0.0563 0.3123 0.5703 0.6083 1.0757 1.4042 1.4522
Gtop Mpa 0 0.0276 0.0563 0.3123 0.5703 0.6083 1.0757 1.4042 1.4522
Girder Gbottom Mpa 0 -0.049 -0.1 -0.661 -1.457 -1.554 -2.749 -3.588 -3.711
Deck Dbottom Mpa 0 0.0084 0.0159 0.0819 0.1466 0.1555 0.2656 0.3301 0.3529
Gtop Mpa 0 0.0084 0.0159 0.0819 0.1466 0.1555 0.2656 0.3301 0.3529
Girder Gbottom Mpa 0 -0.015 -0.028 -0.173 -0.375 -0.397 -0.679 -0.843 -0.902
F) Stresses due to Live load (Without SV) Load factor = 0.75
Dtop Mpa 0 0.0794 0.1321 0.584 0.9815 1.0358 1.3841 1.7393 1.7863
Deck Dbottom Mpa 0 0.0627 0.1044 0.4499 0.7324 0.773 1.0329 1.2979 1.333
Gtop Mpa 0 0.0627 0.1044 0.4499 0.7324 0.773 1.0329 1.2979 1.333
Girder Gbottom Mpa 0 -0.111 -0.185 -0.952 -1.871 -1.975 -2.639 -3.316 -3.406
F.1) Stresses due to Live load (With SV) Load factor = 0.75
Dtop Mpa 0 0.035 0.0712 0.4054 0.7642 0.8152 1.4416 1.8817 1.9461
Deck Dbottom Mpa 0 0.0276 0.0563 0.3123 0.5703 0.6083 1.0757 1.4042 1.4522
Gtop Mpa 0 0.0276 0.0563 0.3123 0.5703 0.6083 1.0757 1.4042 1.4522
Girder Gbottom Mpa 0 -0.049 -0.1 -0.661 -1.457 -1.554 -2.749 -3.588 -3.711
Sections unit c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Distance m 0.4 0.613 0.8 2.542 4.3 4.575 8.75 12.925 17.1
8) Rare Combination LC-SR8 : At day 36500
Total Stresses (A+B)
Gtop Mpa 1.7394 1.8745 1.9785 3.8616 7.0034 7.0927 8.5837 9.841 10.35
Girder Gbottom Mpa 6.2363 6.0314 5.8794 5.7851 6.5304 6.354 4.3663 2.6671 2.169
8.1) Rare Combination LC-SR8.1 : At day 36500 + temperature stresses
Total Stresses (A+B)
Gtop Mpa 0.9475 1.0826 1.1867 3.1439 6.3606 6.45 7.9409 9.1982 9.707
Girder Gbottom Mpa 7.9198 7.7149 7.5628 7.1943 7.6627 7.4863 5.4986 3.7994 3.3013
8.2) Rare Combination LC-SR8.2 : At day 36500 - temperature stresses
Total Stresses (A+B)
Gtop Mpa 2.1295 2.2646 2.3686 4.3183 7.5273 7.6167 9.1076 10.365 10.874
Girder Gbottom Mpa 4.329 4.1241 3.9721 4.0615 4.9921 4.8158 2.8281 1.1289 0.6308
8.3) Rare Combination LC-SR8.3 : At day 36500 + temperature stresses
Total Stresses (A+B)
Gtop Mpa 0.4196 0.5338 0.624 2.5155 5.688 5.7638 7.1682 8.3371 8.8342
Girder Gbottom Mpa 9.0421 8.8743 8.7469 8.4511 9.0414 8.8995 7.1332 5.6597 5.1915
8.4) Rare Combination LC-SR8.4 : At day 36500 - temperature stresses
Total Stresses (A+B)
Gtop Mpa 2.3895 2.5038 2.5939 4.4728 7.6325 7.7083 9.1127 10.282 10.779
Girder Gbottom Mpa 3.0575 2.8897 2.7623 3.2298 4.5904 4.4486 2.6823 1.2088 0.7406
Gtop Mpa -0.009 0.1128 0.2179 1.3038 2.6866 2.8422 4.7883 5.9559 6.3452
Girder Gbottom Mpa 0.0098 -0.116 -0.225 -1.327 -2.698 -2.854 -4.808 -5.98 -6.371
Dtop Mpa 2.0867 2.1767 2.2389 2.8858 3.5026 3.5688 4.0646 4.5062 4.5838
Deck Dbottom Mpa -0.873 -0.801 -0.752 -0.261 0.1849 0.2343 0.6044 0.9339 0.9918
Gtop Mpa 0.209 0.306 0.3808 2.0394 4.9728 5.019 6.0682 7.052 7.5139
Girder Gbottom Mpa 9.0706 8.9214 8.8109 9.27 11.077 10.969 9.5953 8.3522 7.9495
Total Stresses (A+B +C+D+E+F+G) (With SV Loading)
Dtop Mpa -0.173 -0.128 -0.082 0.3574 0.8449 0.9078 1.6816 2.2082 2.3032
Deck Dbottom Mpa -0.213 -0.177 -0.141 0.1991 0.5584 0.6053 1.1828 1.5758 1.6466
Gtop Mpa 0.8689 0.9308 0.9925 2.4999 5.3463 5.3899 6.6466 7.6938 8.1687
Girder Gbottom Mpa 7.6677 7.5808 7.4935 8.3869 10.547 10.446 8.5422 7.1371 6.7013
F.1) Stresses due to Live load (With SV) Load factor = 0.2
Dtop Mpa 0 0.0093 0.019 0.1081 0.2038 0.2174 0.3844 0.5018 0.519
Deck Dbottom Mpa 0 0.0074 0.015 0.0833 0.1521 0.1622 0.2869 0.3744 0.3873
Gtop Mpa 0 0.0074 0.015 0.0833 0.1521 0.1622 0.2869 0.3744 0.3873
Girder Gbottom Mpa 0 -0.013 -0.027 -0.176 -0.389 -0.415 -0.733 -0.957 -0.99
Dtop Mpa 0 0.0107 0.0201 0.1063 0.1964 0.2083 0.3559 0.4423 0.4729
Deck Dbottom Mpa 0 0.0084 0.0159 0.0819 0.1466 0.1555 0.2656 0.3301 0.3529
Gtop Mpa 0 0.0084 0.0159 0.0819 0.1466 0.1555 0.2656 0.3301 0.3529
Girder Gbottom Mpa 0 -0.015 -0.028 -0.173 -0.375 -0.397 -0.679 -0.843 -0.902
F) Stresses due to Live load (Without SV) Load factor = 0.75
Dtop Mpa 0 0.0794 0.1321 0.584 0.9815 1.0358 1.3841 1.7393 1.7863
Deck Dbottom Mpa 0 0.0627 0.1044 0.4499 0.7324 0.773 1.0329 1.2979 1.333
Gtop Mpa 0 0.0627 0.1044 0.4499 0.7324 0.773 1.0329 1.2979 1.333
Girder Gbottom Mpa 0 -0.111 -0.185 -0.952 -1.871 -1.975 -2.639 -3.316 -3.406
F.1) Stresses due to Live load (With SV) Load factor = 0.75
Dtop Mpa 0 0.035 0.0712 0.4054 0.7642 0.8152 1.4416 1.8817 1.9461
Deck Dbottom Mpa 0 0.0276 0.0563 0.3123 0.5703 0.6083 1.0757 1.4042 1.4522
Gtop Mpa 0 0.0276 0.0563 0.3123 0.5703 0.6083 1.0757 1.4042 1.4522
Girder Gbottom Mpa 0 -0.049 -0.1 -0.661 -1.457 -1.554 -2.749 -3.588 -3.711
G) Stresses due to differential shrinkage Load factor = 1
Dtop Mpa -0.713 -0.713 -0.713 -0.635 -0.477 -0.477 -0.477 -0.477 -0.477
Deck Dbottom Mpa -0.875 -0.875 -0.875 -0.803 -0.652 -0.652 -0.652 -0.652 -0.652
Gtop Mpa 1.1035 1.1035 1.1035 1.1759 1.3266 1.3266 1.3266 1.3266 1.3266
Girder Gbottom Mpa -0.592 -0.592 -0.592 -0.58 -0.511 -0.511 -0.511 -0.511 -0.511
H) -ve temperature stresses Load factor = 0.5
Dtop Mpa -1.416 -1.416 -1.416 -1.37 -1.323 -1.323 -1.323 -1.323 -1.323
Deck Dbottom Mpa 0.3251 0.3251 0.3251 0.3806 0.4366 0.4366 0.4366 0.4366 0.4366
Gtop Mpa 0.3251 0.3251 0.3251 0.3806 0.4366 0.4366 0.4366 0.4366 0.4366
Girder Gbottom Mpa -1.589 -1.589 -1.589 -1.436 -1.282 -1.282 -1.282 -1.282 -1.282
Total Stresses (A+B +C+D+E+F+G) (Without SV Loading)
Dtop Mpa -2.129 -2.039 -1.977 -1.314 -0.622 -0.555 -0.06 0.382 0.4596
Deck Dbottom Mpa -0.55 -0.479 -0.43 0.1094 0.6634 0.7128 1.0828 1.4123 1.4703
Gtop Mpa 2.0644 2.1787 2.2688 4.0922 7.1959 7.2717 8.676 9.845 10.342
Girder Gbottom Mpa 4.6469 4.4791 4.3517 4.6661 5.8723 5.7305 3.9642 2.4907 2.0225
Total Stresses (A+B +C+D+E+F+G) (With SV Loading)
Dtop Mpa -0.713 -0.668 -0.622 -0.123 0.4841 0.547 1.3209 1.8474 1.9424
Deck Dbottom Mpa -0.875 -0.839 -0.803 -0.409 0.0646 0.1115 0.689 1.0819 1.1528
Gtop Mpa 1.7394 1.8185 1.8956 3.574 6.597 6.6704 8.2822 9.5146 10.025
Girder Gbottom Mpa 6.2363 6.1309 6.0266 6.3936 7.5686 7.433 5.1365 3.5011 2.9998
Gtop Mpa 1.1939 1.291 1.3657 3.018 5.9451 5.9912 7.0404 8.0242 8.4862
Girder Gbottom Mpa 6.0783 5.9291 5.8186 6.6594 8.8511 8.7433 7.3698 6.1267 5.724
1.3) Frequent Combination LC-SF1.3 : At day 92 Structure open to LL + temperature stresses
Total Stresses (A+B)
Gtop Mpa 0.077 0.1281 0.1722 1.5898 4.3286 4.345 5.2036 5.993 6.4292
Girder Gbottom Mpa 9.3512 9.2836 9.2274 10.203 12.638 12.606 11.719 10.973 10.636
1.4) Frequent Combination LC-SF1.4 : At day 92 Structure open to LL - temperature stresses
Total Stresses (A+B)
Gtop Mpa 1.259 1.31 1.3542 2.7642 5.4953 5.5117 6.3703 7.1598 7.5959
Girder Gbottom Mpa 5.7604 5.6929 5.6367 7.0703 9.9671 9.9352 9.0488 8.3023 7.9654
2) Frequent Combination LC-SF2 : At day 36500
Total Stresses (A+B)
Gtop Mpa 1.7394 1.8536 1.9438 3.7116 6.7592 6.835 8.2394 9.4083 9.9054
Girder Gbottom Mpa 6.2363 6.0685 5.9412 6.1025 7.1542 7.0124 5.246 3.7726 3.3044
2.1) Frequent Combination LC-SF2.1 : At day 36500 + temperature stresses
Total Stresses (A+B)
Gtop Mpa 1.0795 1.1937 1.2839 3.1136 6.2236 6.2994 7.7038 8.8727 9.3698
Girder Gbottom Mpa 7.6392 7.4714 7.3441 7.2768 8.0978 7.9559 6.1896 4.7162 4.2479
2.2) Frequent Combination LC-SF2.2 : At day 36500 - temperature stresses
Total Stresses (A+B)
Gtop Mpa 2.0644 2.1787 2.2688 4.0922 7.1959 7.2717 8.676 9.845 10.342
Girder Gbottom Mpa 4.6469 4.4791 4.3517 4.6661 5.8723 5.7305 3.9642 2.4907 2.0225
2.3) Frequent Combination LC-SF2.3 : At day 36500 + temperature stresses
Total Stresses (A+B)
Gtop Mpa 0.9475 1.0157 1.0753 2.664 5.5794 5.6255 6.8392 7.8138 8.2851
Girder Gbottom Mpa 7.9198 7.8337 7.7606 8.2098 9.6589 9.593 8.3137 7.3368 6.9344
2.4) Frequent Combination LC-SF2.4 : At day 36500 - temperature stresses
Total Stresses (A+B)
Gtop Mpa 2.1295 2.1977 2.2573 3.8384 6.7461 6.7922 8.0059 8.9805 9.4518
Girder Gbottom Mpa 4.329 4.2429 4.1698 5.077 6.9884 6.9224 5.6432 4.6663 4.2639
Girder Gbottom Mpa 0 -0.015 -0.028 -0.173 -0.375 -0.397 -0.679 -0.843 -0.902
F) Stresses due to Live load Load factor = 0
Dtop Mpa 0 0 0 0 0 0 0 0 0
Deck Dbottom Mpa 0 0 0 0 0 0 0 0 0
Gtop Mpa 0 0 0 0 0 0 0 0 0
Girder Gbottom Mpa 0 0 0 0 0 0 0 0 0
Gtop Mpa 0.2681 0.2681 0.2681 0.2857 0.3223 0.3223 0.3223 0.3223 0.3223
Girder Gbottom Mpa -0.144 -0.144 -0.144 -0.141 -0.124 -0.124 -0.124 -0.124 -0.124
H) +ve temperature stresses Load factor = 0.5
Dtop Mpa 2.26 2.26 2.26 2.3498 2.4404 2.4404 2.4404 2.4404 2.4404
Deck Dbottom Mpa -0.66 -0.66 -0.66 -0.598 -0.536 -0.536 -0.536 -0.536 -0.536
Gtop Mpa -0.66 -0.66 -0.66 -0.598 -0.536 -0.536 -0.536 -0.536 -0.536
Girder Gbottom Mpa 1.4029 1.4029 1.4029 1.1743 0.9436 0.9436 0.9436 0.9436 0.9436
Total Stresses (A+B +C+D+E+F+G+H)
Dtop Mpa 2.0867 2.0973 2.1068 2.3018 2.5211 2.533 2.6805 2.7669 2.7975
Deck Dbottom Mpa -0.873 -0.864 -0.857 -0.711 -0.548 -0.539 -0.429 -0.364 -0.341
Gtop Mpa 0.209 0.2433 0.2764 1.5895 4.2404 4.246 5.0353 5.7541 6.1809
Girder Gbottom Mpa 9.0706 9.0328 8.9963 10.222 12.948 12.944 12.234 11.669 11.356
Girder Gbottom Mpa -1.589 -1.589 -1.589 -1.436 -1.282 -1.282 -1.282 -1.282 -1.282
Total Stresses (A+B +C+D+E+F+G+H)
Dtop Mpa -1.589 -1.578 -1.569 -1.418 -1.242 -1.231 -1.083 -0.997 -0.966
Deck Dbottom Mpa 0.1124 0.1208 0.1283 0.2674 0.4247 0.4336 0.5437 0.6082 0.6311
Gtop Mpa 1.1939 1.2283 1.2614 2.5681 5.2126 5.2183 6.0075 6.7263 7.1531
Girder Gbottom Mpa 6.0783 6.0405 6.004 7.6114 10.723 10.718 10.009 9.4431 9.1301
Gtop Mpa 0.6515 0.5002 0.3677 -0.25 -0.148 -0.357 -2.927 -4.298 -4.517
Girder Gbottom Mpa 6.8121 6.9712 7.11 10.101 14.632 14.852 17.651 19.239 19.58
Girder Gbottom Mpa 6.2363 6.1799 6.1266 7.0545 9.0257 8.9874 7.8852 7.0889 6.7104
1.1) QSP Combination LC-SQ1.1 : At day 92 Structure open to LL + temperature stresses
Total Stresses (A+B)
Gtop Mpa 0.209 0.2433 0.2764 1.5895 4.2404 4.246 5.0353 5.7541 6.1809
Girder Gbottom Mpa 9.0706 9.0328 8.9963 10.222 12.948 12.944 12.234 11.669 11.356
2.1) QSP Combination LC-SQ2.1 : At day 36500 + temperature stresses
Total Stresses (A+B)
Gtop Mpa 1.0795 1.131 1.1795 2.6636 5.4912 5.5265 6.6709 7.5748 8.0367
Girder Gbottom Mpa 7.6392 7.5828 7.5295 8.2288 9.9693 9.9309 8.8288 8.0325 7.654
1.2) QSP Combination LC-SQ1.2 : At day 92 Structure open to LL - temperature stresses
Total Stresses (A+B)
Gtop Mpa 1.1939 1.2283 1.2614 2.5681 5.2126 5.2183 6.0075 6.7263 7.1531
Girder Gbottom Mpa 6.0783 6.0405 6.004 7.6114 10.723 10.718 10.009 9.4431 9.1301
2.2) QSP Combination LC-SQ2.2 : At day 36500 - temperature stresses
Total Stresses (A+B)
Gtop Mpa 2.0644 2.116 2.1645 3.6423 6.4634 6.4987 7.6431 8.5471 9.009
Girder Gbottom Mpa 4.6469 4.5905 4.5371 5.6182 7.7438 7.7055 6.6033 5.807 5.4285
Shear Force at Precast Section alone Tm 2.28216 97.5473 95.9124 82.1242 71.1315 69.6415 47.0212 24.4008 1.78047
Additional Shear Force at Composite section Tm 0 121.068 121.159 116.308 105.416 94.2351 75.9028 56.9708 44.4132
Moment applied at Beam section only Tm -0.0538 0.11087 -1.1597 21.6496 39.1917 190.1 323.42 341.011 591.081 743.356 793.513
Moment applied at Composite section Tm 0 0 0 20.8549 40.3234 212.951 376.053 413.176 667.811 798.458 868.457
Section At Unit Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
Area of prestressing steel Ap mm2 7699.38 7699.38 7699.38 7699.38 7699.38 7699.38 7699.38 7699.38 7699.38
Cg. of prestressing force (from deck top) m 1.46085 1.47727 1.49162 1.61405 1.7189 1.73504 1.93061 2.03054 2.04431
Section At Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
Shear Force at Precast section alone Vc1 Tonne 97.5473 95.9124 82.1242 71.1315 69.6415 47.0212 24.4008 1.78047
Vertical Component of prestress force Tonne 57.9354 57.9528 50.7239 42.174 41.0991 24.9221 8.70733 0
Vc1' Tonne 51.1989 49.5502 41.545 37.3923 36.7623 27.0835 17.435 1.78047
tS Mpa 0.343 0.33195 0.36006 0.50186 0.49341 0.3635 0.234 0.0239
Check tS ≤ fctd OK OK OK OK OK OK OK OK
Stress at composite centriod due to Moment at Precast section alone
Moment at precast section MPC 21.6496 39.1917 190.1 323.42 341.011 591.081 743.356 793.513
Stress at composite centriod scm Mpa 0.0706 0.1278 0.9738 2.52976 2.66736 4.6234 5.81447 6.2068
Factored shear force VED Tonne 218.615 217.072 198.432 176.547 163.877 122.924 81.3716 46.1937
2.60362
k = Min 1 + √ 200/d d is depth in mm
2 1 0.22
= 1.29696
0.175
0.075
r1 = Min Asl /bw d
0.02 0.18125 2.52
0.275 1.675 2.3
Asl provided 16 f 5 Nos. NA
Asl provided = 1005.31 mm2 0.1375
bw = 0.275 m 0.175
r1 = 0.00161 0.2
Section At Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
Prestressing Force after all losses Tonne 0 0 790.003 790.323 790.553 780.599 758.577 759.148 770.548 781.621 787.944
Area of precast section m2 0 0 1.92971 1.92971 1.92971 1.43945 0.94469 0.94469 0.94469 0.94469 0.94469
Area of composite section m2 0 0 2.50251 2.50251 2.50251 2.01225 1.51748 1.51748 1.51748 1.51748 1.51748
bw m 0.825 0.825 0.825 0.825 0.825 0.55126 0.275 0.275 0.275 0.275 0.275
Asl provided mm2 1005.31 1005.31 1005.31 1005.31 1005.31 1005.31 1005.31 1005.31 1005.31 1005.31 1005.31
Factored shear force Tonne 0 218.615 217.072 198.432 176.547 163.877 122.924 81.3716 46.1937
Variation of q 45 o ≥ q ≥ 21.8014 o
VRdmax = acw * bw * z * n1 * fcd / ( cot q +tan q) ( IRC 112 / clause 10.3.3.2 Eq 10.8 )
acw = 1
= 0.6
Section At Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
scp = NED/ Ac Mpa 4.09675 5.4229 8.02993 8.03597 8.15665 8.27386 8.34079
acw 1.18344 1.24282 1.25 1.25 1.25 1.25 1.25
bw m 0.825 0.55126 0.275 0.275 0.275 0.275 0.275
z m 1.61841 1.74084 1.84569 1.86183 2.0574 2.15733 2.1711
VRdmax 2117.35 1598.18 850.17 857.604 947.692 993.718 1000.07
Factored shear force VNS Tonne 217.072 198.432 176.547 163.877 122.924 81.3716 46.1937
Check OK OK OK OK OK OK OK
q = 0.5 sin-1 [ 2*VNS / (acw * bw * z * v1 * fcd) ] ( IRC 112 / clause 10.3.3.2 Eq 10.8 )
Section At Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
VNS T 217.072 198.432 176.547 163.877 122.924 81.3716 46.1937
bw m 0.825 0.55126 0.275 0.275 0.275 0.275 0.275
d m 2.268 2.268 2.268 2.268 2.268 2.268 2.268
z m 1.61841 1.74084 1.84569 1.86183 2.0574 2.15733 2.1711
q deg 5.91596 7.18913 12.2698 11.2342 7.51775 4.71295 2.65031
q adopted deg 45 21.8 21.8 21.8 21.8 21.8 21.8
VNS = VRds = (Asw/s) *z *fywd *cotq ( IRC 112 / clause 10.3.3.2 Eq 10.7 )
Section At Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
VNS T 217.072 198.432 176.547 163.877 122.924 81.3716 46.1937
bw m 0.825 0.55126 0.275 0.275 0.275 0.275 0.275
z m 1.61841 1.74084 1.84569 1.86183 2.0574 2.15733 2.1711
qdesign deg 45 21.8 21.8 21.8 21.8 21.8 21.8
Asw/s mm2/m 3856.14 1310.75 1099.94 1012.15 687.043 433.734 244.663
Additional requirement (suspension reinf)
Asw,min /s mm2/m 84.0043 56.1309 28.0014 28.0014 28.0014 28.0014 28.0014
Provide Asw Legs nos 4 4 2 2 2 2 2
dia mm 12 12 12 12 12 12 12
spacing mm 100 100 100 100 100 100 100
Asw/s provide 4523.89 4523.89 2261.95 2261.95 2261.95 2261.95 2261.95
Check Ok/Revise OK OK OK OK OK OK OK
Shear Force at Precast Section alone Tm 4.10823 102.67 100.997 86.8556 75.5065 73.9608 50.4942 27.0276 3.56094
Additional Shear Force at Composite section Tm 0 122.484 120.766 106.703 88.4326 82.5808 60.0841 50.0933 33.8311
Moment applied at Beam section only Tm -0.0586 -0.1795 -1.6241 18.5925 36.6251 197.515 335.647 352.429 609.754 767.578 814.599
Moment applied at Composite section Tm 0 0 0 28.5739 48.5099 212.313 344.622 364.061 514.857 645.181 669.452
Section At Unit Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
Area of prestressing steel Ap mm2 7699.38 7699.38 7699.38 7699.38 7699.38 7699.38 7699.38 7699.38 7699.38
Cg. of prestressing force (from deck top) m 1.46085 1.47727 1.49162 1.61405 1.7189 1.73504 1.93061 2.03054 2.04431
Section At Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
Shear Force at Precast section alone Vc1 Tonne 102.67 100.997 86.8556 75.5065 73.9608 50.4942 27.0276 3.56094
Vertical Component of prestress force Tonne 57.9354 57.9528 50.7239 42.174 41.0991 24.9221 8.70733 0
Vc1' Tonne 56.3214 54.6347 46.2764 41.7674 41.0816 30.5565 20.0617 3.56094
tS Mpa 0.37732 0.36602 0.40106 0.56058 0.55138 0.41012 0.26926 0.04779
Check tS ≤ fctd OK OK OK OK OK OK OK OK
Stress at composite centriod due to Moment at Precast section alone
Moment at precast section MPC 18.5925 36.6251 197.515 335.647 352.429 609.754 767.578 814.599
Stress at composite centriod scm Mpa 0.06063 0.11943 1.01178 2.6254 2.75668 4.76945 6.00394 6.37174
Factored shear force VED Tonne 225.153 221.762 193.558 163.939 156.542 110.578 77.1209 37.3921
2.60362
k = Min 1 + √ 200/d d is depth in mm
2 1 0.22
= 1.29696
0.175
0.075
r1 = Min Asl /bw d
0.02 0.18125 2.52
0.275 1.675 2.3
Asl provided 16 f 5 Nos. NA
Asl provided = 1005.31 mm2 0.1375
bw = 0.275 m 0.175
r1 = 0.00161 0.2
Section At Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
Prestressing Force after all losses Tonne 0 0 790.003 790.323 790.553 780.599 758.577 759.148 770.548 781.621 787.944
Area of precast section m2 0 0 1.92971 1.92971 1.92971 1.43945 0.94469 0.94469 0.94469 0.94469 0.94469
Area of composite section m2 0 0 2.50251 2.50251 2.50251 2.01225 1.51748 1.51748 1.51748 1.51748 1.51748
bw m 0.825 0.825 0.825 0.825 0.825 0.55126 0.275 0.275 0.275 0.275 0.275
Asl provided mm2 1005.31 1005.31 1005.31 1005.31 1005.31 1005.31 1005.31 1005.31 1005.31 1005.31 1005.31
Factored shear force Tonne 0 225.153 221.762 193.558 163.939 156.542 110.578 77.1209 37.3921
Variation of q 45 o ≥ q ≥ 21.8014 o
VRdmax = acw * bw * z * n1 * fcd / ( cot q +tan q) ( IRC 112 / clause 10.3.3.2 Eq 10.8 )
acw = 1
= 0.6
Section At Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
scp = NED/ Ac Mpa 4.09675 5.4229 8.02993 8.03597 8.15665 8.27386 8.34079
acw 1.18344 1.24282 1.25 1.25 1.25 1.25 1.25
bw m 0.825 0.55126 0.275 0.275 0.275 0.275 0.275
z m 1.61841 1.74084 1.84569 1.86183 2.0574 2.15733 2.1711
VRdmax 2117.35 1598.18 850.17 857.604 947.692 993.718 1000.07
Factored shear force VNS Tonne 221.762 193.558 163.939 156.542 110.578 77.1209 37.3921
Check OK OK OK OK OK OK OK
q = 0.5 sin-1 [ 2*VNS / (acw * bw * z * v1 * fcd) ] ( IRC 112 / clause 10.3.3.2 Eq 10.8 )
Section At Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
VNS T 221.762 193.558 163.939 156.542 110.578 77.1209 37.3921
bw m 0.825 0.55126 0.275 0.275 0.275 0.275 0.275
d m 2.268 2.268 2.268 2.268 2.268 2.268 2.268
z m 1.61841 1.74084 1.84569 1.86183 2.0574 2.15733 2.1711
q deg 6.04571 7.0089 11.3424 10.7059 6.74759 4.46468 2.14427
q adopted deg 45 21.8 21.8 21.8 21.8 21.8 21.8
VNS = VRds = (Asw/s) *z *fywd *cotq ( IRC 112 / clause 10.3.3.2 Eq 10.7 )
Section At Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
VNS T 221.762 193.558 163.939 156.542 110.578 77.1209 37.3921
bw m 0.825 0.55126 0.275 0.275 0.275 0.275 0.275
z m 1.61841 1.74084 1.84569 1.86183 2.0574 2.15733 2.1711
qdesign deg 45 21.8 21.8 21.8 21.8 21.8 21.8
Asw/s mm2/m 3939.47 1278.55 1021.39 966.846 618.041 411.077 198.046
Additional requirement (suspension reinf)
Asw,min /s mm2/m 84.0043 56.1309 28.0014 28.0014 28.0014 28.0014 28.0014
Provide Asw Legs nos 4 4 2 2 2 2 2
dia mm 12 12 12 12 12 12 12
spacing mm 100 100 100 100 100 100 100
Asw/s provide 4523.89 4523.89 2261.95 2261.95 2261.95 2261.95 2261.95
Check Ok/Revise OK OK OK OK OK OK OK
fck = 50 Mpa
fctk,0.05 = 2.5 Mpa
Shear Force at precast section alone Tm 1.69049 72.2572 71.0462 60.8327 52.69 51.5863 34.8305 18.0747 1.31887
Additional Shear Force at Composite section Tm 0 80.1889 80.2951 77.1512 69.9395 62.4351 50.1318 37.855 29.6038
Section At Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
Area of prestressing steel Ap mm2 7699.38 7699.38 7699.38 7699.38 7699.38 7699.38 7699.38 7699.38 7699.38
Cg. of prestressing force (from deck top) m 1.46085 1.47727 1.49162 1.61405 1.7189 1.73504 1.93061 2.03054 2.04431
Axial stress (due to pre stress) fx Mpa 4.09555 4.09675 5.4229 8.02993 8.03597 8.15665 8.27386 8.34079
*stresses due to bending are ignored
Maximum Principal stress
s3 (comp)= [fx/2 + 1/2 Ö(fx2 + 4tv2)] Mpa 4.21739 4.21609 5.57739 8.31886 8.27553 8.30999 8.36039 8.37906
s1 (tens) = [fx/2 - 1/2 Ö(fx2 + 4tv2)] Mpa -0.1218 -0.1193 -0.1545 -0.2889 -0.2396 -0.1533 -0.0865 -0.0383
fctb Mpa 2.3313 2.33136 2.2769 2.16725 2.16898 2.1676 2.16558 2.16484
Act = b*h/2 m2 0.69094 0.69094 0.69094 0.46168 0.23031 0.23031 0.23031 0.23031 0.2303
As,min web = r0s,min * Kc *Act mm2 1494.25 1493.94 1493.72 833.298 254.092 253.718 246.237 238.971 234.82
Provide on ech face dia of bar mm 12 12 12 12 12 12 12 12 12
Nos Nos. 8 8 8 8 8 8 8 8 8
Spacing provided mm 116.786 116.786 116.786 116.786 116.786 116.786 116.786 116.786 116.79
Reinforcement provided (both face ) mm2 1809.56 1809.56 1809.56 1809.56 1809.56 1809.56 1809.56 1809.56 1809.6
Check OK OK OK OK OK OK OK OK OK
Total web height excluding (top & bottom flange) 1.675 1.675 1.675 1.675 1.675 1.675 1.675 1.675 1.675
Nos of bar required on either face 16 16 16 16 16 16 16 16 16
Section At unit Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
Reinforcement requirement in bottom flange
b 0.275 0.275 0.275 0.275 0.275 0.275 0.275 0.275 0.275
h considered 0.2875 0.2875 0.2875 0.2875 0.2875 0.2875 0.2875 0.2875 0.2875
Act = b*h m2 79062.5 79062.5 79062.5 79062.5 79062.5 79062.5 79062.5 79062.5 79063
As,min web = r0s,min * Kc *Act mm2 645.251 645.251 645.251 645.251 645.251 645.251 645.251 645.251 645.25
Reinforcement provided (both face ) mm2 678.584 678.584 678.584 678.584 678.584 678.584 678.584 678.584 678.58
Check OK OK OK OK OK OK OK OK OK
Total bottom flange width including bottom flange 0.825 0.825 0.825 0.825 0.825 0.825 0.825 0.825 0.825
Nos of bar required at bottom 8 8 8 8 8 8 8 8 8
Section At unit Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
Reinforcement requirement in Top flange
b 0.3625 0.3625 0.3625 0.3625 0.3625 0.3625 0.3625 0.3625 0.3625
h considered 0.2125 0.2125 0.2125 0.2125 0.2125 0.2125 0.2125 0.2125 0.2125
Act = b*h m2 77031.3 77031.3 77031.3 77031.3 77031.3 77031.3 77031.3 77031.3 77031
As,min = r0s,min * Kc *Act mm2 628.674 628.674 628.674 628.674 628.674 628.674 628.674 628.674 628.67
vEdi = b VEd /z bi
bi = 1m bi = 1
r = As /Ai
As = Area of reinforcement crossing the inter face
Ai = Interface area of joint
a = 90 deg
Section At unit Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
Section At unit Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
VED T 121.068 121.159 116.308 105.416 94.2351 75.9028 56.9708 44.4132
z m 1.60406 1.61841 1.74084 1.84569 1.86183 2.0574 2.15733 2.1711
vEd Mpa 3.43073 3.40287 3.03687 2.59612 2.30065 1.67693 1.20037 0.92984
vEdf Mpa 1.0916 1.08273 0.96628 0.82604 0.73202 0.53357 0.38193 0.29586
FINDING qf
qf = 0.5 sin-1 [ 2vEDf / n fcd ]
qf deg 6.76126 6.70532 5.9728 5.09588 4.51074 3.28146 2.34639 1.81678
Check OK/ REVISE qf < qfmax OK OK OK OK OK OK OK OK
Check OK/ REVISE vEDf < vEdf,max OK OK OK OK OK OK OK OK
Section At unit Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
vEdf Mpa 1.0916 1.08273 0.96628 0.82604 0.73202 0.53357 0.38193 0.29586
qdesign deg 26.5 26.5 26.5 26.5 26.5 26.5 26.5 26.5
Asf /sf mm2/m 275.391 273.154 243.775 208.395 184.677 134.61 96.3553 74.6399
As there will be transverse bending will exist along with shear b/w precast beam & deck
Check for Minimum Requirement in transverse direction
Reinforcement requirement for transverse bending of deck
As, deck = 1500 mm2/m ( Including Top & Bottom Both reinf)
dia mm 12 12 12 12 12 12 12 12 12
At Bottom spacing mm 100 100 100 100 100 100 100 100 100
As,trans 2261.95 2261.95 2261.95 2261.95 2261.95 2261.95 2261.95 2261.95 2261.95
1 0.22 1 0.22 x1
0.175 0.175 Cu
0.075 0.0181 xu lxu
0.175 Tu
0.2
0.825 0.825
Section At Face Jacking c/L brg. Face TS deff TE L/8 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.55 -0.4 0 0.213 0.4 2.142 3.9 4.175 8.35 12.525 16.7
Area of prestressing steel Ap mm2 7699.38 7699.38 7699.38 7699.38 7699.38 7699.38 7699.38 7699.38 7699.38
Cg. of prestressing force (from girder top) m 1.46085 1.47727 1.49162 1.61405 1.7189 1.73504 1.93061 2.03054 2.04431
Cg. of prestressing force (from deck top) m 1.68085 1.69727 1.71162 1.83405 1.9389 1.95504 2.15061 2.25054 2.26431
Total prestressing force T 790.003 790.323 790.553 780.599 758.577 759.148 770.548 781.621 787.944
Prestrain at cg. Of cables 0.00526 0.00526 0.00527 0.0052 0.00505 0.00506 0.00513 0.00521 0.00525
Strain at cg. of prestressing steel 0.02175 0.02199 0.02221 0.02405 0.02562 0.02586 0.0288 0.0303 0.03051
Total strain at cg. of prestressing cables = prestrain + bending strain 0.02701 0.02726 0.02747 0.02925 0.03067 0.03092 0.03393 0.03551 0.03576
Total tensile force fpd*Ap T 1083.99 1083.99 1083.99 1083.99 1083.99 1083.99 1083.99 1083.99 1083.99
Calculating Compression force
Area of compression force upto hfcd m2 0.48537 0.48537 0.48537 0.48537 0.48537 0.48537 0.48537 0.48537 0.48537
Total compression force = hfcd * Ac Tonne 1083.99 1083.99 1083.99 1083.99 1083.99 1083.99 1083.99 1083.99 1083.99
Total compression C - Total Tension T 0 0 0 0 0 0 0 0 0
Check OK OK OK OK OK OK OK OK OK
Cg. of compression force below deck top m 0.09321 0.09321 0.09321 0.09321 0.09321 0.09321 0.09321 0.09321 0.09321
Lever arm b/w Tension & compression force m 1.58764 1.60406 1.61841 1.74084 1.84569 1.86183 2.0574 2.15733 2.1711
Moment capacity Tm 1720.98 1738.77 1754.33 1887.05 2000.7 2018.19 2230.2 2338.51 2353.45
Factored moment at section Tm 0 0 79.5151 403.051 699.473 754.187 1258.89 1541.81 1661.97
Check OK OK OK OK OK OK OK OK OK
f7 f7
0.175
f9 f8
f8 0.2
f9 -0.8
0.15 f10 0.2 f10 0.25
2.1 0.825 -6.6
2.5199
Total 1.657719 1.39979 2.27698 5.48051 0.90216
e0 x SA - q x SAy = a x SAt
e0 x 1.65772 - q x 1.39979 = 1E-05x 5.48051 ------------------- (1)
STRESSES AT
Dtop DbottomGtop Gbottom 4.88
Points Depth f ei = Ec ( at + yq - eo ) ytop 0 0.22 0.22 2.52
mm N/mm2 Eigen stresses N/mm2 N/mm2 N/mm2 N/mm2 -2.02
0 0
f1 0 4.8808
f2 0.15 -0.7008 4.8808 -1.071 -1.0712 1.88716
f3 0.22 -1.0712
f4 0.395 -1.9971
f5 0.4 -2.0236
f6 0.47 -1.9236 Stresses at CG Of steel & outermost steel is in steel
f7 2.145 0.47002
f8 2.32 0.72009
f9 2.37 0.79154
f10 2.52 1.88716 1.89
Positive temp. stress
2.52 0
e0 x SA - q x SAy = a x SAt
e0 x 1.54146 - q x 1.35977 = 1E-05x -4.5737 ------------------- (1)
STRESSES AT
Dtop DbottomGtop Gbottom -2.65
Points Depth f ei = Ec ( at + yq - eo ) ytop 0 0.22 0.22 2.52
mm N/mm2 Eigen stresses N/mm2 N/mm2 N/mm2 N/mm2 1.52
0 0
f1 0 -2.6462
f2 0.22 0.87329 -2.64619 0.873 0.87329 -2.5638
f3 0.25 1.35321
f4 0.395 1.47438
f5 0.45 1.52034
f6 0.47 1.50765 Stresses At cg. Of steel & outermost steel is in steel
f7 2.145 0.31908
f8 2.27 0.02978
f9 2.32 -0.4891
f10 2.52 -2.5638 -2.56
Positive temp. stress
2.52 0
f7
f8
0.2
f7 -0.8
0.15 f8 f9 0.25
2.1 0.825 -6.6
e0 x SA - q x SAy = a x SAt
e0 x 2.50242 - q x 2.67243 = 1E-05x 5.27301 ------------------- (1)
e0 x SA - q x SAy = a x SAt
e0 x 2.50242 - q x 2.67244 = 1E-05x -4.5138 ------------------- (1)
STRESSES AT
Dtop DbottomGtop Gbottom
-2.83
Points Depth f ei = Ec ( at + yq - eo ) ytop 0 0.22 0.22 2.52
mm N/mm2 Eigen stresses N/mm2 N/mm2 N/mm2 N/mm2 1.23
0 0
f1 0 -2.831
f2 0.22 0.65017 -2.831 0.65 0.65017 -3.1788
f3 0.25 1.12488
f4 0.395 1.2208
f5 0.4131 1.23277
f6 0.45 1.25718 Stresses At cg. Of steel & outermost steel is in steel
f7 2.0699 -0.0525
f8 2.2699 -0.5502
f9 2.5209 -3.1883
0.00
2.5209 0 Positive temp. stress
Dtop 0 N/mm2 4.51996 4.51996 4.51996 4.69956 4.8808 4.8807996 4.8808 4.8808 4.8808
Dbottom 0.22 N/mm2 -1.3198 -1.3198 -1.3198 -1.1961 -1.0712 -1.071219 -1.0712 -1.0712 -1.0712
Gtop 0.22 N/mm2 -1.3198 -1.3198 -1.3198 -1.1961 -1.0712 -1.071219 -1.0712 -1.0712 -1.0712
STRESSES Gbottom
AT 2.52 N/mm2 2.80577 2.80577 2.80577 2.34856 1.88716 1.8871614 1.88716 1.88716 1.88716
Dtop 0 N/mm2 -2.831 -2.831 -2.831 -2.739 -2.6462 -2.646192 -2.6462 -2.6462 -2.6462
Dbottom 0.22 N/mm2 0.65017 0.65017 0.65017 0.76122 0.87329 0.8732855 0.87329 0.87329 0.87329
Gtop 0.22 N/mm2 0.65017 0.65017 0.65017 0.76122 0.87329 0.8732855 0.87329 0.87329 0.87329
STRESSES Ast_cg
AT 2.52 N/mm2 -3.1788 -3.1788 -3.1788 -2.8727 -2.5638 -2.563776 -2.5638 -2.5638 -2.5638
A m2 2.50251 2.50251 2.50251 2.50251 2.50251 2.01225 1.51748 1.51748 1.51748 1.51748 1.51748
Izz m4 1.55604 1.55604 1.55604 1.55604 1.55604 1.36551 1.17322 1.17322 1.17322 1.17322 1.17322
Composite section yt m 1.06798 1.06798 1.06798 1.06798 1.06798 0.98086 0.89293 0.89293 0.89293 0.89293 0.89293
dcen m 0.95798 0.95798 0.95798 0.95798 0.95798 0.87086 0.78293 0.78293 0.78293 0.78293 0.78293
Fs/Ac N/mm2 0.12237 0.12237 0.12237 0.12237 0.12237 0.15219 0.2018 0.2018 0.2018 0.2018 0.2018
Mcs Fs*dcen Tm 29.3368 29.3368 29.3368 29.3368 29.3368 26.6687 23.9761 23.9761 23.9761 23.9761 23.9761
Top N/mm2 0.20135 0.20135 0.20135 0.20135 0.20135 0.19156 0.18248 0.18248 0.18248 0.18248 0.18248
deck Bottom N/mm2 0.15987 0.15987 0.15987 0.15987 0.15987 0.1486 0.13752 0.13752 0.13752 0.13752 0.13752
Top N/mm2 0.15987 0.15987 0.15987 0.15987 0.15987 0.1486 0.13752 0.13752 0.13752 0.13752 0.13752
Stress at fibers
Girderdue Bottom N/mm2
to Moment Component -0.2738 -0.2738 -0.2738 -0.2738 -0.2738 -0.3006 -0.3325 -0.3325 -0.3325 -0.3325 -0.3325
0 0 0 0 0 0 0 0 0 0 0 0
Top N/mm2 0 -0.1824 -0.1824 -0.1824 -0.1824 -0.1824 -0.1624 -0.1219 -0.1219 -0.1219 -0.1219 -0.1219
deck Bottom N/mm2 0.22 -0.2239 -0.2239 -0.2239 -0.2239 -0.2239 -0.2054 -0.1668 -0.1668 -0.1668 -0.1668 -0.1668
Top N/mm2 0.22 0.28225 0.28225 0.28225 0.28225 0.28225 0.30078 0.33932 0.33932 0.33932 0.33932 0.33932
Stress at fibers
Girderdue Bottom N/mm2
to Moment Component2.52 -0.1514 -0.1514 -0.1514 -0.1514 -0.1514 -0.1484 -0.1307 -0.1307 -0.1307 -0.1307 -0.1307
2.52 0 0 0 0 0 0 0 0 0 0 0
- -
-0.5 0 0.5 -0.5 0 0.5
0.18 0.12
2449 0.28 1889 0.33
-0.63
83 2245 -0.63
357 9324
931 781
-0.15 -0.13
1384 0704
82 75
Support Section Mid Span
A m2 2.50251 2.50251 2.50251 2.50251 2.50251 2.01225 1.51748 1.51748 1.51748 1.51748 1.51748
Izz m4 1.55604 1.55604 1.55604 1.55604 1.55604 1.36551 1.17322 1.17322 1.17322 1.17322 1.17322
Composite section yt m 1.06798 1.06798 1.06798 1.06798 1.06798 0.98086 0.89293 0.89293 0.89293 0.89293 0.89293
dcen m 0.95798 0.95798 0.95798 0.95798 0.95798 0.87086 0.78293 0.78293 0.78293 0.78293 0.78293
Fs/Ac N/mm2 0.12232 0.12232 0.12232 0.12232 0.12232 0.15212 0.20172 0.20172 0.20172 0.20172 0.20172
Mcs Fs*dcen Tm 29.3244 29.3244 29.3244 29.3244 29.3244 26.6574 23.9659 23.9659 23.9659 23.9659 23.9659
Top N/mm2 0.20127 0.20127 0.20127 0.20127 0.20127 0.19148 0.1824 0.1824 0.1824 0.1824 0.1824
deck Bottom N/mm2 0.15981 0.15981 0.15981 0.15981 0.15981 0.14853 0.13746 0.13746 0.13746 0.13746 0.13746
Top N/mm2 0.15981 0.15981 0.15981 0.15981 0.15981 0.14853 0.13746 0.13746 0.13746 0.13746 0.13746
Stress at fibers
Girderdue Bottom N/mm2
to Moment Component -0.2736 -0.2736 -0.2736 -0.2736 -0.2736 -0.3005 -0.3324 -0.3324 -0.3324 -0.3324 -0.3324
0 0 0 0 0 0 0 0 0 0 0 0
Top N/mm2 0 -0.1824 -0.1824 -0.1824 -0.1824 -0.1824 -0.1624 -0.1218 -0.1218 -0.1218 -0.1218 -0.1218
deck Bottom N/mm2 0.22 -0.2238 -0.2238 -0.2238 -0.2238 -0.2238 -0.2053 -0.1668 -0.1668 -0.1668 -0.1668 -0.1668
Top N/mm2 0.22 0.28213 0.28213 0.28213 0.28213 0.28213 0.30066 0.33918 0.33918 0.33918 0.33918 0.33918
Stress at fibers
Girderdue Bottom N/mm2
to Moment Component2.52 -0.1513 -0.1513 -0.1513 -0.1513 -0.1513 -0.1484 -0.1306 -0.1306 -0.1306 -0.1306 -0.1306
2.52 0 0 0 0 0 0 0 0 0 0 0
- -
-0.5 0 0.5 -0.5 0 0.5
0.18 0.12
2372 0.28 1837 0.33
-0.63
609 2126 -0.63
768 9181
473 165
-
-0.15
0.13
1320
0649
748
Support Section 431 Mid Span
A m2 2.50251 2.50251 2.50251 2.50251 2.50251 2.01225 1.51748 1.51748 1.51748 1.51748 1.51748
Izz m4 1.55604 1.55604 1.55604 1.55604 1.55604 1.36551 1.17322 1.17322 1.17322 1.17322 1.17322
Composite section yt m 1.06798 1.06798 1.06798 1.06798 1.06798 0.98086 0.89293 0.89293 0.89293 0.89293 0.89293
dcen m 0.95798 0.95798 0.95798 0.95798 0.95798 0.87086 0.78293 0.78293 0.78293 0.78293 0.78293
Fs/Ac N/mm2 0.11624 0.11624 0.11624 0.11624 0.11624 0.14456 0.1917 0.1917 0.1917 0.1917 0.1917
Mcs Fs*dcen Tm 27.8677 27.8677 27.8677 27.8677 27.8677 25.3332 22.7754 22.7754 22.7754 22.7754 22.7754
Top N/mm2 0.19127 0.19127 0.19127 0.19127 0.19127 0.18197 0.17334 0.17334 0.17334 0.17334 0.17334
deck Bottom N/mm2 0.15187 0.15187 0.15187 0.15187 0.15187 0.14116 0.13063 0.13063 0.13063 0.13063 0.13063
Top N/mm2 0.15187 0.15187 0.15187 0.15187 0.15187 0.14116 0.13063 0.13063 0.13063 0.13063 0.13063
Stress at fibers
Girderdue Bottom N/mm2
to Moment Component -0.26 -0.26 -0.26 -0.26 -0.26 -0.2855 -0.3159 -0.3159 -0.3159 -0.3159 -0.3159
0 0 0 0 0 0 0 0 0 0 0 0
Top N/mm2 0 -0.1733 -0.1733 -0.1733 -0.1733 -0.1733 -0.1543 -0.1158 -0.1158 -0.1158 -0.1158 -0.1158
deck Bottom N/mm2 0.22 -0.2127 -0.2127 -0.2127 -0.2127 -0.2127 -0.1951 -0.1585 -0.1585 -0.1585 -0.1585 -0.1585
Top N/mm2 0.22 0.26811 0.26811 0.26811 0.26811 0.26811 0.28572 0.32233 0.32233 0.32233 0.32233 0.32233
Stress at fibers
Girderdue Bottom N/mm2
to Moment Component2.52 -0.1438 -0.1438 -0.1438 -0.1438 -0.1438 -0.141 -0.1242 -0.1242 -0.1242 -0.1242 -0.1242
2.52 0 0 0 0 0 0 0 0 0 0 0
- -
-0.5 0 0.5 -0.5 0 0.5
0.17 0.11
3313 0.26 5785 0.32
-0.63
319 8111 -0.63
523 2332
947 469
-0.14 -0.12
3803 4159
947 47
Support Section Mid Span
A m2 2.50251 2.50251 2.50251 2.50251 2.50251 2.01225 1.51748 1.51748 1.51748 1.51748 1.51748
Izz m4 1.55604 1.55604 1.55604 1.55604 1.55604 1.36551 1.17322 1.17322 1.17322 1.17322 1.17322
Composite section yt m 1.06798 1.06798 1.06798 1.06798 1.06798 0.98086 0.89293 0.89293 0.89293 0.89293 0.89293
dcen m 0.95798 0.95798 0.95798 0.95798 0.95798 0.87086 0.78293 0.78293 0.78293 0.78293 0.78293
Fs/Ac N/mm2 0.47842 0.47842 0.47842 0.47842 0.47842 0.59498 0.78897 0.78897 0.78897 0.78897 0.78897
Mcs Fs*dcen Tm 114.694 114.694 114.694 114.694 114.694 104.263 93.7362 93.7362 93.7362 93.7362 93.7362
Top N/mm2 0.7872 0.7872 0.7872 0.7872 0.7872 0.74893 0.71342 0.71342 0.71342 0.71342 0.71342
deck Bottom N/mm2 0.62504 0.62504 0.62504 0.62504 0.62504 0.58095 0.53765 0.53765 0.53765 0.53765 0.53765
Top N/mm2 0.62504 0.62504 0.62504 0.62504 0.62504 0.58095 0.53765 0.53765 0.53765 0.53765 0.53765
Stress at fibers
Girderdue Bottom N/mm2
to Moment Component -1.0703 -1.0703 -1.0703 -1.0703 -1.0703 -1.1752 -1.3 -1.3 -1.3 -1.3 -1.3
0 0 0 0 0 0 0 0 0 0 0 0
Top N/mm2 0 -0.7133 -0.7133 -0.7133 -0.7133 -0.7133 -0.635 -0.4765 -0.4765 -0.4765 -0.4765 -0.4765
Deck Bottom N/mm2 0.22 -0.8755 -0.8755 -0.8755 -0.8755 -0.8755 -0.803 -0.6523 -0.6523 -0.6523 -0.6523 -0.6523
Top N/mm2 0.22 1.10346 1.10346 1.10346 1.10346 1.10346 1.17593 1.32662 1.32662 1.32662 1.32662 1.32662
Stress at fibers
Girderdue Bottom N/mm2
to Moment Component2.52 -0.5919 -0.5919 -0.5919 -0.5919 -0.5919 -0.5802 -0.511 -0.511 -0.511 -0.511 -0.511
2.52 0 0 0 0 0 0 0 0 0 0 0
- -
-2 0 2 -2 0 2
0.71 0.47
3300 1.10 6535 1.32
-0.63
957 3461 -0.63
359 6615
116 056
-0.59 -0.51
1850 0999
03 783
Support Section Mid Span
0.175
0.825
5
0 2.3
0.5
4
0.5
3
0.5
1 2
0.3
In IRC SP:105 reference made to Euro Code EC2- Annex J for checking of concrete stresses.
fck = 50 Mpa
fck (cyl) = 40 Mpa
Pmax = 3766.37 kN
gp,unfav = 1.2
As = 1558.5 mm2
Clear cover = 45 mm
Crack width = 0.25 mm under 0.85*UTS
Reinforcement stress limited to = 250 Mpa to avoid crack width check.
To avoid crack check, stresses in reinforcement can be restricted to 250 Mpa
As,revised 1558.5x435/250 = 2711.79 mm2
0.426
All the Girders are not supported on bearing and the reaction is not transferred to it directly. Hence, End Diaphragm is critical in service condition.
The reactions below the each girder due to SIDL & DL has been calculated with the help of STAAD.
Jack Up Condition :
Hogging Moment (Tm ) Sagging Moment (Tm ) Shear Force ( T )
Force due to Load Factor Load Factor Load Factor
(At Beam. 91 2nd node)ULS SLS R SLS Q (At Beam. 92 2nd node)
ULS SLS R SLS Q (At Beam. 91 2nd node)
ULS SLS R SLS Q
DL 83 1.35 1 1 36 1.35 1 1 93 1.35 1 1
SIDL 14 1.35 1 1 2 1.35 1 1 12 1.35 1 1
Surfacing 11 1.75 1 1 4 1.75 1 1 11 1.75 1 1
MATERIAL PROPERTIES :
Grade of concrete = M 40 MPa PERMISSIBLE STRESSES
Grade of Reinforcement = Fe 500 MPa 1) Permissble concrete compressive stresses
fywd = 0.8 fyk = 400 MPa Load Combi Permissble Stress
Clear cover = 50 mm SLS Rare 0.48 fck = 19.2 Mpa
Modulus of Elasticity steel Es = 200000 Mpa SLS QP 0.36 fck = 14.4 Mpa
For short Term loading Ecm = 35000 Mpa
Creep factor f = 1.65773 */ Refer appendix A2
For long Term loading Ecm' = 13169.2 Mpa
fcteff Mean tensile strength = fctm = 3.51517 Mpa 2) Permissible Tensile stress in steel (Rare) = 300 Mpa
fcd = 22.3333 Mpa Permissible Tensile stress in steel (Quasi) = 400 Mpa
euk = 0.0025
eud = 0.00225 3) Permissible crack width wk
ecu2 = 0.0035 SLS QP Load combination = 0.3 mm
xumax/d = 0.6087
ULS Hogging 150.2 426 2254 6433.98 1372 193.286 UR, OK 2587.38 OK 1440.31 OK 80.5 1334.51 193.051 373.499 279.878 OK
ULS Sagging 58.3 426 2254 6433.98 1372 193.286 UR, OK 1004.29 OK 1440.31 OK 80.5 1334.51 124.187 373.499 279.878 OK
SLS (QP Comb.) 108 426 2254 6433.98 15.187 573.136 3E+11 2.04419 14.4 OK 91.0477 400 OK
SLS (QP Comb.) 42 426 2254 6433.98 15.187 573.136 3E+11 0.79496 14.4 OK 35.4074 400 OK
ULS 161 1 161 2254 426 1.29788 6433.98 0.0067 0.289896 0 41.1241
Provide shear reinf.
ULS 161 426 2028.6 45 1984.13 0.00091 58.196 2 20 150 4188.79 OK 80.5
0.319
Service Condition :
Hogging Moment (Tm ) Sagging Moment (Tm ) Shear Force ( T )
Force due to Load Factor Load Factor Load Factor
(At Beam. 91 2nd node)
ULS SLS R SLS Q (At Beam. 92 2nd node)
ULS SLS R SLS Q (At Beam. 91 2nd node)
ULS SLS R SLS Q
DL 1 1.35 1 1 18 1.35 1 1 10 1.35 1 1
SIDL 40 1.35 1 1 0 1 1 1 8 1.35 1 1
Surfacing 2 1.75 1 1 0 1.75 1 1 1 1.75 1 1
Live Load 28 1.5 1 0 75 1 1 0 18 1 1 0
MATERIAL PROPERTIES :
Grade of concrete = M 40 MPa PERMISSIBLE STRESSES
Grade of Reinforcement = Fe 500 MPa 1) Permissble concrete compressive stresses
fywd = 0.8 fyk = 400 MPa Load Combi Permissble Stress
Clear cover = 50 mm SLS Rare 0.48 fck = 19.2 Mpa
Modulus of Elasticity steel Es = 200000 Mpa SLS QP 0.36 fck = 14.4 Mpa
For short Term loading Ecm = 35000 Mpa
Creep factor f = 1.65773 */ Refer appendix A2
For long Term loading Ecm' = 13169.2 Mpa
fcteff Mean tensile strength = fctm = 3.51517 Mpa 2) Permissible Tensile stress in steel (Rare) = 300 Mpa
fcd = 22.3333 Mpa Permissible Tensile stress in steel (Quasi) = 400 Mpa
euk = 0.0025
eud = 0.00225 3) Permissible crack width wk
ecu2 = 0.0035 SLS QP Load combination = 0.3 mm
xumax/d = 0.6087
ULS Hogging 100.85 319 2254 6433.98 1372 193.286 UR, OK 1737.26 OK 1078.54 OK 22.025 1334.507 97.596 373.4993 279.878 OK
ULS Sagging 99.3 319 2254 6433.98 1372 193.286 UR, OK 1710.56 OK 1078.54 OK 22.025 1334.507 96.4345 373.4993 279.878 OK
SLS (QP Comb.) 43 319 2254 6433.98 15.187 573.136 3E+11 0.83235 14.4 OK 37.0726 400 OK
SLS (QP Comb.) 18 319 2254 6433.98 15.187 573.136 3E+11 0.34843 14.4 OK 15.5188 400 OK
ULS 44.05 1 44.05 2254 319 1.29788 6433.98 0.00895 0.2899 0 33.8791
Provide shear reinf.
ULS 44.05 319 2028.6 45 542.862 0.00091 58.105 2 20 200 3141.59 OK 22.025
Appendix A1 :
RH = 57.5 %
ho = 340.209 mm
Calculation of fo
fo = fRH b(fcm) b(to)
Stages I II III IV V
Loading At age 14 28 35 63 64
fo 1.88661 1.65432 1.58549 1.417 1.41273
At age a2 bH bc( t , to) f (t, to) bc( t , to) f (t, to) bc( t , to) f (t, to) bc( t , to) f (t, to) bc( t , to) f (t, to)
days
14 0.85391 724.433 0 0
28 0.85391 724.433 0.30433 0.57415 0 0
35 0.85391 724.433 0.34272 0.64658 0.2479 0.41011 0 0
63 0.85391 724.433 0.43705 0.82454 0.39726 0.65719 0.37257 0.5907 0 0
64 0.85391 724.433 0.43954 0.82923 0.40047 0.66251 0.37636 0.59672 0.13862 0.19642 0 0
92 0.85391 724.433 0.49694 0.93753 0.47079 0.77883 0.45593 0.72287 0.37636 0.53331 0.37257 0.52634
36500 0.85391 724.433 0.99412 1.87551 0.99412 1.64458 0.99412 1.57616 0.99411 1.40866 0.99411 1.40441
Appendix A1 :
RH = 57.5 %
t = 36465 days
Calculation of fo
fo = fRH b(fcm) b(to)
fRH = 1.47401
fo = 1.66959
fo = 1.66959
a2 = 0.93541
bH = 875.593
APPENDIX B1
APPENDIX B2
fck = 40 Mpa
fcm = 50 Mpa
ecd.0 = 0.00044
0.1 0.1 5.5E-05 0.061287 3.37E-06 0.00044 1 -0.002443788 440 0.715 -7.61E-07 2.61E-06
14 0.1 5.5E-05 0.061287 3.37E-06 0.00044 1 -0.002443788 440 0.715 -7.61E-07 2.61E-06
28 0.1 5.5E-05 0.061287 3.37E-06 0.00044 1 -0.002443788 440 0.715 -7.61E-07 2.61E-06
35 0.1 5.5E-05 0.061287 3.37E-06 0.00044 1 -0.002443788 440 0.715 -7.61E-07 2.61E-06
36500 36465 5.5E-05 1 0.000055 0.00044 1 0.989976953 440 0.715 0.000308 0.000363
Days esh
0.1 2.6E-06
0.1 2.6E-06
0.1 2.6E-06
0.1 2.6E-06
28 5.7E-05
29 5.8E-05
57 8.4E-05
36465 0.00036
APPENDIX C1
Es = 200000 Mpa
gs = 1.15
euk = 0.0045
Es = Modulus of Elasticity
fyk = Characteristics yield strength of reinforcement
ft = Tensile strength of steel
gs = Partial factor for reinforcing steel
fyd = Design yield strength of reinforcement
eyk = Characteristic yield strain of reinforcement steel
eyd = Design yield strain of reinforcement steel
euk = Characteristic strain of reinforcement steel at maximum load
eud = design strain of reinforcement steel at maximum load
Concrete Grade = 50
fcd = 22.3333 Mpa
fck = 50 Mpa
fcd = afck /gm
a = 0.67 stress
gm = 1.5 ec2 = 0.002 ecu2 = 0.0035
strain
fcd = 0.44667 *fck
= 22.3333 Mpa Design stress -strain diagarm for Concrete
= 0.002
= 0.0035
= 2
Strain
Recatangular- Parabolic stress block Equavelent stress block Actaul modification
ecu2 = 0.0035
xu ≤xu,max
d
d-xu
eud= 0.00405
Ast
xu,max 0.0035
d - xu,max= 0.00405
xu,max = 0.46358 * d
stress
ec3 = 0.0018 ecu3 = 0.0035
strain
APPENDIX C2
Ep = 195000 Mpa
gs = 1.15
Ep = Modulus of Elasticity
fpk = Characteristics tensile strength of prestressing steel