SL&TS PROJECT KS&EW Architectural Drawings of Substation 2

Client KS&EW Consultant NESPAK Comment Sheet ID.: CS-C-SUB-DR-012 Issued on: 28-June-2020
Contractor: AGJV Comment Sheet Title:
Comments on Architectural Drawings
of Substation 2

Drawing/Document ID: 28-501-DD-C-SUB-DR-012 Rev: 1

Drawing/Document Title: Architectural Drawings of Substation 2

ProjectTitle:Design, Install & Commission of Mechanical and 1 = Approved.


Electrical systems and Associated Civil work for Ship Lift &
Transfer System on Design – Build basis at Karachi Shipyard
& Engineering Works in Karachi, Pakistan.
2 = Approved except as noted
3 = Revise and Re-submit
4 = Not Approved
Cat: 2
Employer/Engineer’s Comments Contractor Response Employer/Engineer’s Comments
Comm. ID: Document Reference
(18-June-20) (20-June-20) (29-June-20)
Comments have been marked on the attached Comments incorporated in revised Comments have been marked on the attached
1 Drawing # 28-501-DD-C-SUB-DR-002 Drawings. Drawings for your review & comments.
Drawings.
1. CORRECT MERGED EFAN LINES. 1. Noted and Incorporated 1. OK, closed.
28-501-DD-C-SUB-DR-012
2 2. MENTION FRAME MATERIAL. (ANODIZED 2. Noted & Incorporated 2. OK, closed.
(Sheet 1 of 5)
ALUMINUM FRAME.)
SEC-AA SEC-AA SEC-AA
1. MARK WALL OPENINGS, COORDINATE WITH PLAN. 1. Noted & Incorporated 1. OK, closed.
2. CORRECT THICKNESS OF PARAPET. 2. Noted & Incorporated 2. OK, closed.
3. MENTION FRAME MATERIAL. (ANODIZED 3. Noted & Incorporated 3. OK, closed.
ALUMINUM FRAME.) 4. Noted & Incorporated 4. OK, closed.
4. MARK FINISH LINE. 5. Noted & Incorporated 5. OK, closed.
5. CORRECT DESCRIPTION. (THERE IS DOOR NOT
28-501-DD-C-SUB-DR-012
3 WINDOW) SEC-BB SEC-BB
(Sheet 3 of 5)
SEC-BB 5. Noted & Incorporated 5. OK, closed.
5. MARK WALL OPENINGS, COORDINATE WITH PLAN. 6. Noted & Incorporated 6. OK, closed.
6. CORRECT DESCRIPTION. (THERE IS DOOR NOT 7. Noted & Incorporated 7. OK, closed.
WINDOW) 8. Noted & Incorporated 8. OK, closed.
7. CORRECT THICKNESS OF PARAPET.
8. MENTION FRAME MATERIAL. (ANODIZED
ALUMINUM FRAME.)
28-501-DD-C-SUB-DR-012 1. OK, closed.
4 1. PROVIDE DIMENSIONS. Dimensions provided
(Sheet 4 of 5)
1. REFER DETAILS GIVEN IN THIS SHEET & Reference marked in revised drawings. 1. OK, closed.
28-501-DD-C-SUB-DR-012
5. OVERALL, MARK CALL-OUTS ON DRAWINGS.
(Sheet 5 of 5)
Since the depth of electrical trenches is 1000mm, Details of Electrical Cable Layout inside Ok, noted.
therefore AGJV is to submit the details of cables to be trenches will be part of Electrical Submittals
laid in the trenches, because in our opinion more and provided there.
6.
than one layer of LV cables shall be required in the
trench to cater the requirement.

Page No. 1 of 1