Professional Documents
Culture Documents
CEP 304 Concrete Engineering Practical Quiz Batch 3 Date: 03/11/17 Time: 40 Min Name: - Roll No
CEP 304 Concrete Engineering Practical Quiz Batch 3 Date: 03/11/17 Time: 40 Min Name: - Roll No
CEP 304 Concrete Engineering Practical Quiz Batch 3 Date: 03/11/17 Time: 40 Min Name: - Roll No
QUIZ
Batch 3 Date: 03/11/17 Time: 40 min
1. If a grading curve is horizontal between the portions of 20 mm I.S. Sieve and 4.75 mm I.S. Sieve, the
aggregates do not contain______ particles
3. The fineness modulus of 5 samples were recorded as 2.5, and 7, the average size of aggregates are
__________mm and ________mm
(a) Both (i) and (ii) (b) None (c) Only (i) (d) Only (ii)
6. Five concrete mix design were tried in the lab, the compacting factor values obtained were 0.93, 0.94,
0.85, 0.93, and 0.90. These values represents ___, ___, ___, ____ and___ degrees of workability.
a) Medium, High, Low, Medium, Medium b) High, High, Low, High, Medium
c) Medium, High, Very Low, High, Medium d) High, High, Medium, High, Medium
7. The slump value required for concreting work of lightly reinforced sections is
a) Upto 25 mm b) 25 -50 mm c) 75-100 mm d) Above 100 mm
8. During consistency test for 100gms of cement, the consistency was 32%. ____________is the amount
of water to be added in initial setting time for a sample of 350gms of cement?
9. Bulking of sand, results in production of richer batch in terms of cement than specified. (True/ False)
10. ______________ is the maximum cement content for RCC mix design as per IS-456:2000.
11. If ‘P’ is the standard consistency for the given cement then given the quantities of water required
for
i) Setting time test =__________ ii) Soundness test by Le-chatelier method = ________
12. For M20 grade concrete, having mix proportion 1:2:4, Cement: Aggregate ratio is 1:____
13. The soundness of cement due to lime and magnesia both is measured by
a) Le Chateliers’ test b) Vicat’s apparatus test c) Autoclave test d) Flow table test
18. The correct sequence of workability test(s)/method(s) in the order of their application from low to
high workability is
a) Slump test, compaction factor test and vee-bee consistometer
b) Compaction factor test, vee-bee consistometer and slump test
c) Vee-bee consistometer, slump test and compacting factor test
d) Vee-bee consistometer, compacting factor test and slump test
19. What is the correct sequence of operations involved in concrete production?
a) Batching—mixing—handling—transportation
b) Mixing—batching—handling—transportation
c) Transportation—handling—mixing—batching
d) Handling—transportation—mixing—batching
20. Absorption capacity of an aggregate refers to the difference expressed in appropriate proportion in
water content between
a) A wet and a dry aggregate
b) A dry aggregate and an oven-dry aggregate
c) A saturated surface-dry aggregate and a dry aggregate
d) A saturated surface-dry aggregate and an oven-dry aggregate
21. Increase in fineness of cement
a) Reduces the rate of strength development and leads to higher shrinkage
b) Increase the rate of strength development and reduces the rate of deterioration
c) Decreases the rate of strength development and increase the bleeding of cement
d) Increase the rate of strength development and leads to higher shrinkage
22. The most commonly used retarder in cement is
30. The percentage of which of the following compounds of cement clinker should be varied to use it
for hydraulic structures like dams
d) Tetra-calcium alumina-ferrite