Assunto: HRSG support welding for GE‘s performance test device installa:on’
Data: quarta-feira, 25 de setembro de 2019, 09:54:52 Hora padrão da África Ocidental
De: 王华
Para: silva251@hotmail.com, higogomes, Cláudio Rene Brandão De Matos (claudio.dematos@dar.com)
CC: 杨永红, 李李孝新, 王孟奇, ⻩黄绍明
Anexos: image003(09-25-02-44-41).png, image004(09-25-02-44-41).png, image001(09-25-02-44-41).png, image002(09-25-02-44-41).png, pastedImage.png,
pastedImage.png, pastedImage.png, pastedImage.png, bg.jpg
Page 1 of 7
2. The support also needs GE's performance test team to go to the site for review before the performance test device can be installed.
3. The welded support is on the flue liner. It is only used to install the wire rope through the rings. It does not have too much tensile force and will not
cause damage to the inner liner. Moreover, the GE team has been doing this, it is a mature installation plan;
4. After the HRSG performance test is completed, these supports will be removed to restore the original condition of the flue.
Best regards!
_____________________
WANG HUA(Verônica)
CMEC Angola
email: wanghua@cmec8.com
TEL: 945009231
Hi Li,
Regards
Yosry
Hi Yosry,
Page 2 of 7
1. Both positions (1) or (2) will work as there is only 200 mm difference between the two. We will let the site team choose to their convenience
2. For the channel I’m open to either 100 or 200 mm channel. To make life easier for all parties involved, if they can weld the channel along with M12 bolt
and nut with the channel, it will avoid confusion for sizing.
Thanks
Karthik Chellaperumal
Performance Engineer
GE Power
Hi Karthik,
Sorry for bothering you again. Would you please advise our customer regarding the inquires below.
Regards
Yosry
Dear sir:
for the position of the channel, please see the attached pictures:
Page 3 of 7
Please help us to confirm the following 2 things:
1.As the transition part is tilted, the position is right above the indicated hole in the picture, we'd like to know we should take
the opening inside(2) or outside(1)?, there would be about 200mm's difference.
2. For the normal channel steel, we have the width of 100 and 200, which one should we use? and do we have the bolt size?
such as M10 or M12? when we send this to the installation team, they would ask the same questions
Regards
Li
Dear Li,
Regards
Yosry
Hi Yosry,
Page 4 of 7
b. Location of the bolt/channel. Top of the HRSG, above the holes on the bottom. Holes are shown below for reference
With regard to the cost, as per the agreed test procedure CMEC should provide us craft labor and support for executing site specific tasks.
Thanks
Karthik Chellaperumal
Performance Engineer
GE Power
Hello Karthik,
Would you please give more clarification for our customer inquiries.
Regards
Yosry
Dear sir:
Refer to your email below, we can support to fabricate and weld but with the following doubts:
1. Is this grid permanent or temporary?
2. The material and specification of the grid and bolts(such as whether it should be high-temperature resistance
material, etc., as site team doesn't have the stainless steel or heat resistant steel, only has the common channel steel
which can be used for short period in high temperature)
3. The exact position of the grid
For the above mentioned issues, the installation scheme and drawings are highly appreciated.
Furthermore, this work will generate certain expenses ( for scaffolding, welding, etc.), will GE be responsible for it?
Regards
Li
Page 5 of 7
Wish you have a nice day
............................................
Li Xiaoxin
CMEC Angola
Email: joyous615@163.com
Tel: +244 943334066
............................................
Team,
“For the upcoming Steam turbine performance test, we will have to install temperature measurement grid at the inlet of the HRSG.
For installing this measurement we have sent in all the required measurement probes with our instrumentation. Arun had already
helped identify the dimensions from site.
We need site help for welding a bracket at the top of HRSG so we can tie up our instrumentation at HRSG inlet. I’m attaching
photos from another site where the site team helped fabricate and weld the brackets.”
Regards
Yosry
Page 6 of 7
Page 7 of 7