Hazard Reporting Procedure
Contractor doc. n°: Engineering doc. n°: Rev.: A01 C01 Company doc. n°:
NAWPPL-BIMS-NPPL- NAWPPL-BIMS-NPPL-
000-HS-PRO-00012 Sheet 2 of 7 000-HS-PRO-00012
Contents:
1. PURPOSE ..............................................................................................................................................................3
2. Scope of Application ...........................................................................................................................................3
2.1. Scope ................................................................................................................................................................. 3
2.2. Responsibilities.................................................................................................................................................. 3
3. Reference Documents .........................................................................................................................................3
4. Terminology, Definitions, Abbreviations .........................................................................................................3
5. Process ..................................................................................................................................................................3
5.1. Hazards Observations ...................................................................................................................................... 3
5.1.1. General ........................................................................................................................................ 3
5.1.2. Frequency and Duration .............................................................................................................. 4
5.1.3. Observation Methodology ........................................................................................................... 4
5.1.4. Follow-Up .................................................................................................................................... 4
6. Attachments ..........................................................................................................................................................5
Status .................................................................................................................................................................................7
1. PURPOSE
Define the process for reporting hazards and safety improvement suggestions;
Outline a system for tracking and closing out hazard reports.
2. SCOPE OF APPLICATION
2.1. Scope
Site construction.
2.2. Responsibilities
- Observer
Any unsafe act, unsafe condition must be immediately reported by the Observer. Any
suggestion or problem regarding to safety on the Construction Site shall be promptly reported.
The Site Manager and Site HSE Advisor are responsible to incorporate the findings into an
action plan for the site and close out the items raised.
3. REFERENCE DOCUMENTS
None
5. PROCESS
5.1.1. General
Hazards Observations are to be done by all levels of Management. The aim is to observe
behaviours or conditions on the site and to provide feedback on what has been observed to
enable improvement at the site.
The observer must be authorised to go onto the site, this means having been through the site
induction process or been accompanied by somebody who has.
Note: During the site visit if any serious HSE conditions or acts are observed then this shall
trigger immediate action and/or interruption of the process.
HSE observation are to be undertaken by all Managers (all levels) when visiting a construction
site.
The observation visit should last from 20 to 50 minutes; this could be integrated into a more
general site tour.
Using the template provided in the reference section to this document the Manager should
follow the below steps.
3. Undertake the observation visit ticking the amount of “In Order” and “At Risk” observations
undertaken (The observation should be done openly with no blame).
4. Provide feedback to the people in the area you are observing, this could be the
CONTRACTOR Supervisor, the SUBCOTRACTOR or both depending on language issues
(Proactive comments based on observations, not judgements).
5. Note any unplanned observations on the observation report, unplanned observations are
any observation that were observed which were not related to what was stated in the
“Specific requirement/standard to be checked” section.
6. Total the number of “In Order” and “At Risk” observation and identify the % compliance for
the site.
7. Give the feedback to the Site Management (Factual report, may include suggestions but
not judgements, names are never reported).
5.1.4. Follow-Up
Site HSE Advisor & Site Manager - to define actions to be taken to improve the level of
compliance with the target of 100%
Site Manager - to monitor and aid the implementation of such actions (with the support of Site
HSE Advisor)
6. ATTACHMENTS
Hazard Observation Card
Société Société
OBSERVATION HSE OBSERVATION HSE
الشركة الشركة
الصحة و السالمة و المحيط
ّ مالحظات حول الصحة و السالمة و المحيط
ّ مالحظات حول
تص ّرف /سلوك مثالي التاريخ تص ّرف /سلوك مثالي التاريخ
تص ّرف /سلوك خطير الساعة تص ّرف /سلوك خطير الساعة
المالحظات المالحظات
…………………………………………………………… ……………………………………………………………
………………………………. ……………………………….
…………………………………………………………… ……………………………………………………………
………………………………. ……………………………….
…………………………………………………………… ……………………………………………………………
………………………………. ……………………………….
…………………………………………………………… ……………………………………………………………
………………………………. ……………………………….
النتائج النتائج
Risk Assessment
Possible
Date of Location/ Description of Possible Immediate Corrective
Ref. Immediate
Observation Area Hazard/Aspect Basic Cause Action Taken Action
Cause STATUS
Yes No
Note: