Professional Documents
Culture Documents
Jsa-0001 - Excavation Cipp Rapid
Jsa-0001 - Excavation Cipp Rapid
Management Office
(RTMO) for Package P20A
JOB SAFETY ANALYSIS FOR EXCAVATION WORKS
DOC. REF. NO: JSA- 0001
JOB SAFETY ANALYSIS
Supervisor Name: Mohd Wari Bin Kassim Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: P20A4 3.Evaluate the Risk and Decide If Existing Controls
Task : Excavation work Date: are Adequate
JSA No: 0001 4.Record Your Findings
5.Review and Revise If Necessary
No. Task Involves Specific Hazards Person Affected Risk Rating Control Measures Responsible Person
1. Mobilization • Illegal entry All personnel L • Competency (worker attended • Site Supervisor
• Workers workers working at involved Project HSSE RAPID Induction & • HSSE personnel
site Valid CIDB, Work Permit, OHD • Project Engineer
Medical Check Up, personnel
competency and in-house
training etc.)
2. Identifying • Struck by moving All personnel M • Work supervisor and worker • Site Supervisor
underground utilities vehicle involved attend toolbox talk • HSSE Personnel
and Setting Out Work • Flagman must be provided • Project Engineer
• Put safety signage
• Wear approved reflective
vest/jacket and other PPE i.e.
safety helmet, safety shoe and
etc.
3. Mobilizing backhoe • Struck by moving All personnel L • Ensure backhoe is inspected first • Site Supervisor
into excavation area vehicles i.e. car, Involved prior to enter site area • Project Engineer
lorry truck and etc. • Assess ground condition prior to • HSSE Personnel
excavation works • Competent person
• Provide flagman and banksman
4. Access to working area • Trip and fall All personnel L • Provide proper access and egress • Site Supervisor
Involved inside the trench • Project Engineer
• Wear approved reflective vest • HSSE Personnel
and others PPE i.e. safety • Competent person
helmet, safety shoes and etc.
5. Excavation works • Worker hit by All personnel M • Secure excavation parameter • Site Supervisor
moving object involved and turning circle of backhoe • Project Engineer
(bucket) with warning tape and safety • HSSE Personnel
cones • Competent person
• Provide Flagman/Banksman
• Ensure backhoe is installed with
reverse alarm
• Wear proper PPE (hand gloves)
• Damage to H
underground • Identifying underground services
service • Do manual excavation
PROJECT: HDPE HYDRANT PIPE CIPP LINER for RAPID Temporary Executive Village (RTEV) and Rapid Temporary Management Office
(RTMO) for Package P20A
JOB SAFETY ANALYSIS FOR EXCAVATION WORKS
DOC. REF. NO: JSA- 0001
JOB SAFETY ANALYSIS
6. Backfilling and • Ergonomic All personnel H • Train proper way of using • Site Supervisor
compacting earth Involved compactor • Project Engineer
platform • Ensure that the body position is • HSSE Personnel
appropriate during the activity • Competent person
• Work using buddy system
• Job rotation / sequence of
work in safe manner
• Bad weather
L • Stop work during bad weather
(raining/ lightning)
• Provide proper shelter
PROJECT: HDPE HYDRANT PIPE CIPP LINER for RAPID Temporary Executive Village (RTEV) and Rapid Temporary Management Office
(RTMO) for Package P20A
JOB SAFETY ANALYSIS FOR EXCAVATION WORKS
DOC. REF. NO: JSA- 0001
JOB SAFETY ANALYSIS
7. Extended hour • Fatigue All personal L • Provide enough lightning at • Site supervisor
involved work area • Project engineer
• Educate worker on fatigue • HSSE Personnel
management Experience /
• Job rotation / sequence of competent worker
work in safe manner
Supervisor Name: Mohd Wari Bin Kassim Signature: 1.Look for The Hazards
Site: RAPID Pengerang 2.Decide Who Might Be Harmed and How
Area: P20A4 3.Evaluate the Risk and Decide If Existing Controls
Task : Excavation work Date: are Adequate
JSA No: 0001 4.Record Your Findings
5.Review and Revise If Necessary
PROJECT: The Procurement, Construction and Commissioning (PCC) of Infrastructures and Foundation for RAPID Temporary
Executive Village (RTEV) and Rapid Temporary Management Office (RTMO) for Package P20A4
JOB SAFETY ANALYSIS FOR EXCAVATION WORKS AND LAYING OF HDPE CORRUGATED DUCT INSIDE TRENCH
DOC. REF. NO: JSA- 0014
JOB SAFETY ANALYSIS
Date:
Date:
Date:
Reviewed by :
OWNER/PMC HSE :
P = PROBABILITY
Probability (P) Example Rating
Most Likely The most likely result of the hazard / being realized 5
Possible Has a good chance of occurring and is not unusual 4
Conceivable Might be occur at some time in the future 3
Remote Has not been known to occur after many years 2
Inconceivable Is practically impossible and has never occurred 1
S = SEVERITY
Severity (S) Example Rating
Catastrophic Numerous fatalities, irrecoverable property damage and 5
productivity
5-12 MEDIUM
A risk identified as LOW may be considered as acceptable and further
reduction may not be necessary. However, if the risk can be resolved quickly
1-4 LOW and efficiently, control measures should be implemented and recorded.