Professional Documents
Culture Documents
LIGHTING AND POWER CHECKLIST Rev 3
LIGHTING AND POWER CHECKLIST Rev 3
Page 1 Lighting‐HVAC CHECK LISTRev 3 20.03.2017
HVAC
Installed Capacity of A/C equipment(TR) Electrical Demand load
(Without counting Stand by units ) for A/C equipments in kW=
Total Air Conditioned Floor Area in m 2 Demand load of Unitary exhaust fans(not part of A/C system) in kW
Applicability Information Required
Section Remarks by
Item (For Bulk Customers only) Attached Drawing Reference Number
Ref KAHRAMAA Engineer
Yes No NA
THERMAL INSULATION OF BUILDING (SECTION 5)
5.2 Wall & Roof U value Provide Wall & roof U value calculation sheet(Appendix :1)
6.3 Cooling Equipment Control Provide System Control Diagrams(For Bulk Customer only).
Provide Energy Recovery Ventilation System Schedule with
6.4 Energy Recovery Ventilation Efficiency Details(For Bulk Customer only).
Page 2 Lighting‐HVAC CHECK LISTRev 3 20.03.2017