Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

19177 19177 19177 19177 19177 19177 19177 19177 19177

19177 Roll No.


19177 19177 19177 19177 19177 Total19177
No. of Pages
19177 : 02 19177

Total No. of Questions : 09


BBA (2012 & Onward Batches) (Sem.–4)
19177 19177 19177 19177 19177 19177 19177 19177 19177
PRODUCTION AND OPERATIONS MANAGEMENT
Subject Code : BBA-406
19177 19177 19177 19177 Paper19177
ID : [A2376]
19177 19177 19177 19177

Time : 3 Hrs. Max. Marks : 60

19177
INSTRUCTION
19177 19177
TO CANDIDATES
19177
: 19177 19177 19177 19177 19177
1. SECTION-A is COMPULSORY consisting of TEN questions carrying T WO marks
each.
2. SECTIONS-B consists of FOUR Sub-sections : Units-I, II, III & IV.
19177 19177
3. 19177
Each Sub-section 19177
contains 19177
T WO questions 19177carrying T
each, 19177 19177
EN marks each. 19177

4. Student has to attempt any ONE question from each Sub -section.

19177 19177 19177 19177 19177


SECTION -A
o m
19177 19177 19177 19177

19177
1.
19177
Write briefly :
19177 19177 19177
.r c 19177 19177

m
19177 19177
a) Define plant location.

p e o
.r c
b) Discuss the objectives of work simplification.
19177 19177 19177

p a
19177 19177 19177

c) What are the disadvantages of keeping large inventories?


19177 19177 19177

19177 19177 d) What


19177

b r
is the utility19177
of quality circles?
19177 19177

p e 19177 19177 19177

e) Define plant layout.


a
rp
19177 19177 19177 19177 19177 19177 19177 19177 19177
f) What do you mean by time study?

19177 19177
g) Discuss the significance of re-order level.
19177 19177

h) What is single acceptance sampling?


19177 b 19177 19177 19177 19177

i) Explain the concept of quality.


19177 19177 19177 19177 19177 19177 19177 19177 19177

j) What is meant by routing?

19177 19177 19177 19177 19177 19177 19177 19177 19177

1 | M-71208 (S12)-2288

19177 19177 19177 19177 19177 19177 19177 19177 19177

19177 19177 19177 19177 19177 19177 19177 19177 19177


19177 19177 19177 19177 19177 19177 19177 19177 19177

SECTION-B
19177 19177 19177 19177 19177 19177 19177 19177 19177

UNIT-I

19177 2
19177 List and explain all 19177
19177 the factors that19177
affect the location
19177 of a plant.
19177 Further explain
19177 the 19177
factors which could affect the locational decision to set up a refinery unit in Punjab.

3 Discuss in detail the different types of layouts, giving examples.


19177 19177 19177 19177 19177 19177 19177 19177 19177

UNIT-II

19177 4
19177 Discuss19177
what is meant
19177 by productivity
19177 linked incentives.
19177 Explain
19177 all types19177
of such 19177
incentives.

5 Write short notes on :


19177 19177 19177 19177 19177 19177 19177 19177 19177

a) Scheduling

19177 19177 b) Method


19177 study 19177 19177

o m19177 19177 19177 19177

.r c
UNIT-III

m
19177 19177 19177 19177 19177 19177 19177 19177 19177

e
6 What is Supply Chain Management? How does it optimize operations of a company?

7 Write short notes on :


p o
a .r c
19177 19177 19177 19177 19177 19177 19177 19177 19177

a) J.I.T.

b) Inventory Costs
r p e
19177 19177 19177

b 19177 19177

UNIT-IV

a
19177

p
19177 19177 19177

rp
19177 8
19177 Explain19177
the Taguchi philosophy.
19177 What
19177role does it19177
play in Quality Management?
19177 Does it
19177 19177

have any relevance in the Indian system?

19177
9
19177
Write short notes on :
19177

a) Sequential Sampling
19177 19177 b 19177 19177 19177 19177

19177 19177 b) Mean-Range


19177 Charts
19177 19177 19177 19177 19177 19177

19177 19177 19177 19177 19177 19177 19177 19177 19177

2 | M-71208 (S12)-2288

19177 19177 19177 19177 19177 19177 19177 19177 19177

19177 19177 19177 19177 19177 19177 19177 19177 19177

You might also like