Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 10

TEST: KF-1

Code: Operator : R. Requis


Sample Name: Conc. Rougher Zn Date :
Project: Hour:

Description: Flotation Kinetics

Procedure Kinetics test condiciones de planta


Feed 1000 g of ore x 1000 cc , 35% solids
Grind K80 = 140 um

Conditions
Stage ORP Reagents added grams per tonne Time, minutes Product Weight Solids Weight Assays
pH mv Na2SiO3 Mibc Grind. Cond. Floth. slurry g % dry g Zn % Pb % Fe % Ins %
-
Conditioning 11.0 1000 2
Flot 1 1 Conc.1 258 25.8 66.5 46.43 4.85 5.3 6.73
Flot 2 1 Conc.2 373 8.3 30.8 41.42 4.67 6.72 9.55
Flot 3 2 Conc.3 529 5.8 30.8 37.58 3.68 8.48 10.15
Flot 4 15 4 Conc.4 903 4.3 39.0 35.33 3.47 17.41 16.7
Flot 5 4 Conc.5 1285 0.0

Tails 850.3 19.37 1.82 15.03 24.93

Total 1017.4

Cumulative Metallurgical Balance Flotation Kinetic Curve

Recovery : %
50
Product Time Weight Assays Recovery %
Zn Pb Fe Ins CuO
40
min. % % % % % Oz/tn % ZnO Zn Pb Fe Ins PbO ZnO
0 0 0 0 0 0 0 0 0
30
Conc.1 1 6.5 46.43 4.9 5.3 6.73 0.00 6.54 13.2 14.3 2.5 2.0 #DIV/0!
Conc.2 2 9.6 44.84 4.8 5.7 7.62 0.00 9.56 18.7 20.6 3.9 3.2 #DIV/0!
20
Conc.3 4 12.6 43.10 4.5 6.4 8.23 0.00 12.59 23.6 25.6 5.7 4.6 #DIV/0!
Conc.4 8 16.4 41.28 4.3 9.0 10.21 0.00 16.42 29.5 31.6 10.5 7.4 #DIV/0! 10
Conc.5 12 16.4 41.28 4.28 9.0 10.21 0.00 16.42 29.5 31.6 10.5 7.4 #DIV/0!
0
0 4 8 12 16
Tail 83.6 19.37 1.82 15.0 24.93 0.00 83.58 70.5 68.4 89.5 92.6 #DIV/0! Time : minute

Zn Pb Fe Ins Auj Cuj


Head (Calc) 100.0 22.97 2.22 14.0 22.51 0.00 100.00 100.0 100.0 100.0 100.0 #DIV/0! Fej Sj Aj. Fe

Head (Assay) 0.78 0.20

Grade Pb : %
Zn Pb Fe Ins
Cu Grade vs Cu Recovery
R inf 29.75 31.78 11.75 8.00
k 0.459 0.480 0.212 0.255
48

Conditions Grind Mill d/l, cm = 8" x 8.5"


Observations Ball Charge Kg = 12.28
RPM = 65 44
Vol H2O cc = 500
Ore g = ± 1000
40
Flotation Cell L = 2.0 0 5 10 15 20 25 30 35 40 45 50

Air flow l/min = 10 Recovery : %

RPM = 1250
Solids % = 33
TEST: KF-1B

Code: Operator : R. Requis


Sample Name: Conc. Rougher Zn Date :
Project: Hour:

Description: Flotation Kinetics

Procedure Kinetics test condiciones de planta


Feed 1000 g of ore x 1000 cc , 35% solids
Grind K80 = 140 um

Conditions
Stage ORP Reagents added grams per tonne Time, minutes Product Weight Solids Weight Assays
pH mv Na2SiO3 Mibc Grind. Cond. Floth. slurry g % dry g Zn % Pb % Fe % Ins %
-
Conditioning 11.0 0 2
Flot 1 1 Conc.1 258 32.0 82.5 45.65 4.47 5.45 6.3
Flot 2 1 Conc.2 373 6.5 24.1 37.49 5.19 7.75 11.2
Flot 3 2 Conc.3 529 8.8 46.4 29.87 2.72 11.8 15.11
Flot 4 15 4 Conc.4 903 6.5 58.6 24.82 2.03 14.13 18.65
Flot 5 4 Conc.5 1285 0.0

Tails 543.1 18.77 1.62 15.49 25.66

Total 754.7

Cumulative Metallurgical Balance Flotation Kinetic Curve

Recovery : %
50
Product Time Weight Assays Recovery %
Zn Pb Fe Ins CuO
40
min. % % % % % Oz/tn % ZnO Zn Pb Fe Ins PbO ZnO
0 0 0 0 0 0 0 0 0
30
Conc.1 1 10.9 45.65 4.5 5.5 6.30 0.00 10.93 21.3 22.8 4.3 3.1 #DIV/0!
Conc.2 2 14.1 43.81 4.6 6.0 7.41 0.00 14.12 26.4 30.5 6.1 4.8 #DIV/0!
20
Conc.3 4 20.3 39.58 4.1 7.7 9.74 0.00 20.27 34.2 38.3 11.4 9.0 #DIV/0!
Conc.4 8 28.0 35.49 3.5 9.5 12.21 0.00 28.04 42.4 45.7 19.3 15.6 #DIV/0! 10
#DIV/0!
0
0 4 8 12 16
Tail 72.0 18.77 1.62 15.5 25.66 0.00 71.96 57.6 54.3 80.7 84.4 #DIV/0! Time : minute

Zn Pb Fe Ins Auj Cuj


Head (Calc) 72.0 23.46 2.15 13.8 21.89 0.00 71.96 57.6 54.3 80.7 84.4 #DIV/0! Fej Sj Aj. Fe

Head (Assay) 0.78 0.20

Grade Pb : %
Zn Pb Fe Ins
Cu Grade vs Cu Recovery
R inf 42.97 45.76 36.55 33.11
k 0.462 0.529 0.094 0.080
48

Conditions Grind Mill d/l, cm = 8" x 8.5"


Observations Ball Charge Kg = 12.28
RPM = 65 44
Vol H2O cc = 500
Ore g = ± 1000
40
Flotation Cell L = 2.0 0 5 10 15 20 25 30 35 40 45 50

Air flow l/min = 10 Recovery : %

RPM = 1250
Solids % = 33
TEST: KF-2

Code: Operator : R. Requis


Sample Name: Conc. Rougher Zn Date :
Project: Hour:

Description: Flotation Kinetics

Procedure Kinetics test condiciones de planta


Feed 1000 g of ore x 1000 cc , 35% solids
Grind K80 = 140 um

Conditions
Stage ORP Reagents added grams per tonne Time, minutes Product Weight Solids Weight Assays
pH mv Na2SiO3 Mibc Grind. Cond. Floth. slurry g % dry g Zn % Pb % Fe % Ins %
-
Conditioning 11.0 1000 2
Flot 1 1 Conc.1 258 32.7 84.3 45.65 4.41 5.65 5.86
Flot 2 1 Conc.2 373 6.6 24.8 36.4 4.99 8.04 11.94
Flot 3 2 Conc.3 529 4.1 21.9 37.57 3.1 9.84 10.57
Flot 4 15 4 Conc.4 903 5.8 52.1 26.58 2.18 14.71 16.92
Flot 5 4 Conc.5 1285 0.0

Tails 554.5 18.68 1.6 14.93 25.23

Total 737.6

Cumulative Metallurgical Balance Flotation Kinetic Curve

Recovery : %
50
Product Time Weight Assays Recovery %
Zn Pb Fe Ins CuO
40
min. % % % % % Oz/tn % ZnO Zn Pb Fe Ins PbO ZnO
0 0 0 0 0 0 0 0 0
30
Conc.1 1 11.4 45.65 4.4 5.7 5.86 0.00 11.43 22.2 23.8 4.8 3.1 #DIV/0!
Conc.2 2 14.8 43.55 4.5 6.2 7.24 0.00 14.79 27.4 31.7 6.8 5.0 #DIV/0!
20
Conc.3 4 17.8 42.55 4.3 6.8 7.80 0.00 17.76 32.2 36.0 9.0 6.4 #DIV/0!
Conc.4 8 24.8 38.00 3.7 9.1 10.39 0.00 24.82 40.2 43.3 16.7 12.0 #DIV/0! 10
#DIV/0!
0
0 4 8 12 16
Tail 75.2 18.68 1.60 14.9 25.23 0.00 75.18 59.8 56.7 83.3 88.0 #DIV/0! Time : minute

Zn Pb Fe Ins Auj Cuj


Head (Calc) 75.2 23.48 2.12 13.5 21.55 0.00 75.18 59.8 56.7 83.3 88.0 #DIV/0! Fej Sj Aj. Fe

Head (Assay) 0.78 0.20

Grade Pb : %
Zn Pb Fe Ins
Cu Grade vs Cu Recovery
R inf 39.86 42.62 31.32 22.67
k 0.538 0.623 0.094 0.093
48

Conditions Grind Mill d/l, cm = 8" x 8.5"


Observations Ball Charge Kg = 12.28
RPM = 65 44
Vol H2O cc = 500
Ore g = ± 1000
40
Flotation Cell L = 2.0 0 5 10 15 20 25 30 35 40 45 50

Air flow l/min = 10 Recovery : %

RPM = 1250
Solids % = 33
TEST: KF-3

Code: Operator : R. Requis


Sample Name: Conc. Rougher Zn Date :
Project: Hour:

Description: Flotation Kinetics

Procedure Kinetics test condiciones de planta


Feed 1000 g of ore x 1000 cc , 35% solids
Grind K80 = 140 um

Conditions
Stage ORP Reagents added grams per tonne Time, minutes Product Weight Solids Weight Assays
pH mv Na2SiO3 Mibc Grind. Cond. Floth. slurry g % dry g Zn % Pb % Fe % Ins %
-
Conditioning 11.0 2000 2
Flot 1 1 Conc.1 258 24.8 64.0 46.6 4.77 5.09 6.37
Flot 2 1 Conc.2 373 6.5 24.1 40.1 5.79 6.99 9.47
Flot 3 2 Conc.3 529 6.0 32.0 39.0 3.04 10.73 12.94
Flot 4 15 4 Conc.4 903 4.7 42.7 27.6 2.17 14.02 16.76
Flot 5 4 Conc.5 1285 0.0

Tails 566.8 18.7 1.6 14.93 25.23

Total 729.6

Cumulative Metallurgical Balance Flotation Kinetic Curve

Recovery : %
50
Product Time Weight Assays Recovery %
Zn Pb Fe Ins CuO
40
min. % % % % % Oz/tn % ZnO Zn Pb Fe Ins PbO ZnO
0 0 0 0 0 0 0 0 0
30
Conc.1 1 8.8 46.63 4.8 5.1 6.37 0.00 8.77 17.6 19.8 3.3 2.5 #DIV/0!
Conc.2 2 12.1 44.85 5.0 5.6 7.22 0.00 12.08 23.3 28.9 5.0 4.0 #DIV/0!
20
Conc.3 4 16.5 43.28 4.5 7.0 8.74 0.00 16.46 30.6 35.2 8.5 6.5 #DIV/0!
Conc.4 8 22.3 39.17 3.9 8.8 10.85 0.00 22.31 37.6 41.2 14.5 11.0 #DIV/0! 10
#DIV/0!
0
0 4 8 12 16
Tail 77.7 18.68 1.60 14.9 25.23 0.00 77.69 62.4 58.8 85.5 89.0 #DIV/0! Time : minute

Zn Pb Fe Ins Auj Cuj


Head (Calc) 77.7 23.25 2.11 13.6 22.02 0.00 77.69 62.4 58.8 85.5 89.0 #DIV/0! Fej Sj Aj. Fe

Head (Assay) 0.78 0.20

Grade Pb : %
Zn Pb Fe Ins
Cu Grade vs Cu Recovery
R inf 38.23 41.15 26.38 18.36
k 0.455 0.564 0.100 0.114
48

Conditions Grind Mill d/l, cm = 8" x 8.5"


Observations Ball Charge Kg = 12.28
RPM = 65 44
Vol H2O cc = 500
Ore g = ± 1000
40
Flotation Cell L = 2.0 0 5 10 15 20 25 30 35 40 45 50

Air flow l/min = 10 Recovery : %

RPM = 1250
Solids % = 33
TEST: KF-4

Code: Operator : R. Requis


Sample Name: Conc. Rougher Zn Date :
Project: Hour:

Description: Flotation Kinetics

Procedure Kinetics test condiciones de planta


Feed 1000 g of ore x 1000 cc , 35% solids
Grind K80 = 140 um

Conditions
Stage ORP Reagents added grams per tonne Time, minutes Product Weight Solids Weight Assays
pH mv Na2SiO3 Mibc Grind. Cond. Floth. slurry g % dry g Zn % Pb % Fe % Ins %
-
Conditioning 11.0 4000 2
Flot 1 1 Conc.1 258 32.0 82.5 47.7 4.47 5.45 5.3
Flot 2 1 Conc.2 373 6.5 24.1 42.5 5.19 7.75 9.2
Flot 3 2 Conc.3 529 6.9 36.4 39.9 2.72 11.8 10.11
Flot 4 15 4 Conc.4 903 5.4 48.6 26.8 2.03 14.13 11.65
Flot 5 4 Conc.5 1285 0.0

Tails 543.1 17.8 1.62 15.49 27.66

Total 734.7

Cumulative Metallurgical Balance Flotation Kinetic Curve

Recovery : %
50
Product Time Weight Assays Recovery %
Zn Pb Fe Ins CuO
40
min. % % % % % Oz/tn % ZnO Zn Pb Fe Ins PbO ZnO
0 0 0 0 0 0 0 0 0
30
Conc.1 1 11.2 47.65 4.5 5.5 5.30 0.00 11.23 22.6 23.5 4.4 2.6 #DIV/0!
Conc.2 2 14.5 46.48 4.6 6.0 6.18 0.00 14.51 28.5 31.4 6.3 4.0 #DIV/0!
20
Conc.3 4 19.5 44.80 4.1 7.5 7.18 0.00 19.46 36.9 37.7 10.5 6.2 #DIV/0!
Conc.4 8 26.1 40.24 3.6 9.1 8.32 0.00 26.08 44.4 44.0 17.2 9.6 #DIV/0! 10
#DIV/0!
0
0 4 8 12 16
Tail 73.9 17.77 1.62 15.5 27.66 0.00 73.92 55.6 56.0 82.8 90.4 #DIV/0! Time : minute

Zn Pb Fe Ins Auj Cuj


Head (Calc) 73.9 23.63 2.14 13.8 22.62 0.00 73.92 55.6 56.0 82.8 90.4 #DIV/0! Fej Sj Aj. Fe

Head (Assay) 0.78 0.20

Grade Pb : %
Zn Pb Fe Ins
Cu Grade vs Cu Recovery
R inf 44.69 43.67 26.93 12.71
k 0.503 0.611 0.127 0.174
48

Conditions Grind Mill d/l, cm = 8" x 8.5"


Observations Ball Charge Kg = 12.28
RPM = 65 44
Vol H2O cc = 500
Ore g = ± 1000
40
Flotation Cell L = 2.0 0 5 10 15 20 25 30 35 40 45 50

Air flow l/min = 10 Recovery : %

RPM = 1250
Solids % = 33
TEST: KF-5

Code: Operator : R. Requis


Sample Name: Conc. Rougher Zn Date :
Project: Hour:

Description: Flotation Kinetics

Procedure Kinetics test condiciones de planta


Feed 1000 g of ore x 1000 cc , 35% solids
Grind K80 = 140 um

Conditions
Stage ORP Reagents added grams per tonne Time, minutes Product Weight Solids Weight Assays
pH mv Na2SiO3 Mibc Grind. Cond. Floth. slurry g % dry g Zn % Pb % Fe % Ins %
-
Conditioning 11.0 4000 2
Flot 1 1 Conc.1 258 26.7 68.8 42.4 2.53 6.4 9.9
Flot 2 1 Conc.2 373 4.9 18.4 37.1 2.50 11.0 10.4
Flot 3 2 Conc.3 529 5.2 27.4 31.7 2.50 8.7 13.3
Flot 4 15 4 Conc.4 903 5.7 51.6 29.6 2.32 12.3 14.9
Flot 5 4 Conc.5 1285 0.0

Tails 621.9 18.22 2.17 14.82 23.7

Total 788.1

Cumulative Metallurgical Balance Flotation Kinetic Curve

Recovery : %
50
Product Time Weight Assays Recovery %
Zn Pb Fe Ins CuO
40
min. % % % % % Oz/tn % ZnO Zn Pb Fe Ins PbO ZnO
0 0 0 0 0 0 0 0 0
30
Conc.1 1 8.7 42.4 2.5 6.4 9.9 0.00 8.73 16.8 9.9 4.1 4.1 #DIV/0!
Conc.2 2 11.1 41.3 2.5 7.4 10.0 0.00 11.06 20.8 12.5 6.0 5.2 #DIV/0!
20
Conc.3 4 14.5 39.0 2.5 7.7 10.8 0.00 14.54 25.8 16.4 8.2 7.4 #DIV/0!
Conc.4 8 21.1 36.1 2.5 9.1 12.0 0.00 21.09 34.6 23.2 14.1 12.0 #DIV/0! 10
#DIV/0!
0
0 4 8 12 16
Tail 78.9 18.2 2.17 14.8 23.7 0.00 78.91 65.4 76.8 85.9 88.0 #DIV/0! Time : minute

Zn Pb Fe Ins Auj Cuj


Head (Calc) 78.9 22.0 2.23 13.6 21.2 0.00 78.91 65.4 76.8 85.9 88.0 #DIV/0! Fej Sj Aj. Fe

Head (Assay) 0.78 0.20

Grade Pb : %
Zn Pb Fe Ins
Cu Grade vs Cu Recovery
R inf 28.51 24.61 23.10 20.17
k 0.340 0.265 0.107 0.136
48

Conditions Grind Mill d/l, cm = 8" x 8.5"


Observations Ball Charge Kg = 12.28
RPM = 65 44
Vol H2O cc = 500
Ore g = ± 1000
40
Flotation Cell L = 2.0 0 5 10 15 20 25 30 35 40 45 50

Air flow l/min = 10 Recovery : %

RPM = 1250
Solids % = 33
TEST: KF-5

Code: Operator : R. Requis


Sample Name: Conc. Rougher Zn Date :
Project: Hour:

Description: Flotation Kinetics

Procedure Kinetics test condiciones de planta


Feed 1000 g of ore x 1000 cc , 35% solids
Grind K80 = 140 um

Conditions
Stage ORP Reagents added grams per tonne Time, minutes Product Weight Solids Weight Assays
pH mv Na2SiO3 Mibc Grind. Cond. Floth. slurry g % dry g Zn % Pb % Fe % Ins %
-
Conditioning 11.0 4000 2
Flot 1 1 Conc.1 258 25.7 66.2 41.57 2.52 6.94 10.06
Flot 2 1 Conc.2 373 5.8 21.7 38.14 2.40 9.8 12.62
Flot 3 2 Conc.3 529 6.5 34.5 31.12 2.47 10.18 13.92
Flot 4 15 4 Conc.4 903 6.3 56.6 28.36 2.15 12.77 18.73
Flot 5 4 Conc.5 1285 0.0

Tails 574.7 18.92 2.2 15.16 23.7

Total 753.7

Cumulative Metallurgical Balance Flotation Kinetic Curve

Recovery : %
50
Product Time Weight Assays Recovery %
Zn Pb Fe Ins CuO
40
min. % % % % % Oz/tn % ZnO Zn Pb Fe Ins PbO ZnO
0 0 0 0 0 0 0 0 0
30
Conc.1 1 8.8 41.57 2.5 6.9 10.06 0.00 8.78 16.1 9.9 4.4 4.1 #DIV/0!
Conc.2 2 11.7 40.72 2.5 7.6 10.69 0.00 11.66 20.9 13.0 6.4 5.8 #DIV/0!
20
Conc.3 4 16.2 38.02 2.5 8.4 11.60 0.00 16.24 27.2 18.0 9.8 8.8 #DIV/0!
Conc.4 8 23.7 34.96 2.4 9.8 13.86 0.00 23.75 36.5 25.2 16.7 15.4 #DIV/0! 10
#DIV/0!
0
0 4 8 12 16
Tail 76.3 18.92 2.20 15.2 23.70 0.00 76.25 63.5 74.8 83.3 84.6 #DIV/0! Time : minute

Zn Pb Fe Ins Auj Cuj


Head (Calc) 76.3 22.73 2.24 13.9 21.36 0.00 76.25 63.5 74.8 83.3 84.6 #DIV/0! Fej Sj Aj. Fe

Head (Assay) 0.78 0.20

Grade Pb : %
Zn Pb Fe Ins
Cu Grade vs Cu Recovery
R inf 34.47 27.76 24.72 23.45
k 0.397 0.289 0.153 0.158
48

Conditions Grind Mill d/l, cm = 8" x 8.5"


Observations Ball Charge Kg = 12.28
RPM = 65 44
Vol H2O cc = 500
Ore g = ± 1000
40
Flotation Cell L = 2.0 0 5 10 15 20 25 30 35 40 45 50

Air flow l/min = 10 Recovery : %

RPM = 1250
Solids % = 33
Primera Limpieza
Na2SiO3 Time Wt Assays Recovery %
g/t Zn Pb Fe Ins
min. % % % % % Zn

0 8.0 28.0 35.5 3.5 9.5 12.2 42.4


150 8.0 24.8 38.0 3.7 9.1 10.4 40.2
300 8.0 22.3 39.2 3.9 8.8 10.8 37.6
600 8.0 26.1 40.2 3.6 9.1 8.3 44.4

D e s p la z a m ie n t o d e In s o lu b le s ( % )

RA 055 1500 8.0 21.1 36.1 2.5 9.1 12.0 34.6


RA 055+Na2SiO3 8.0 23.7 35.0 2.4 9.8 13.9 36.5

Flotación Cinética Insolubles


20

16

12

0
0 4 8 12
Tiempo : minutos
0 150 300 600 o 1000j
2000 400 0
22.95 2.25 14.48 21.44

Recovery % Assays
Zn Pb Fe Ins
Pb Fe Ins % % % %

45.7 19.3 15.6 23.46 2.1 13.8 21.9


43.3 16.7 12.0 23.48 2.1 13.5 21.5 22.5
41.2 14.5 11.0 23.25 2.1 13.6 22.0 45
44.0 17.2 9.6 23.63 2.1 13.8 22.6 90

23.2 14.1 12.0 21.99 2.2 13.6 21.2


25.2 16.7 15.4 22.73 2.2 13.9 21.4
95.1
96.5
98.6
98.2

93.6
95.0

You might also like