CHECKLIST FOR TOILET WATERPROOFING

Project Name :-
Building :-
Location :-
Date
Sr.no Point To be Checked Yes NA Remark
A) TO BE CHECKED BEFORE BASE COAT
1 Has the core cutting been done at required locations ?
2 Has the spout been placed in two layers ?
All surfaces to be applied are cleaned by chipping /removing of
3
excess mortar /loose material by using wire brush
4 Leakages at sunk checked by water ponding
In case of major leakage ,gravity grouting or pressure grouting
5
done
Grouting checked by ponding (if OK then proceed otherwise
6
repeat process)
B) TO BE CHECKED DURING BASE COAT
Approved waterproofing admixture brand/make and
1
proportion( ml/bag)
Specified cement mortar proportion mixed according to
2
measurment box

3 Base coat applied to floors and vertical surfaces up to thrash coat

4 Ponding of base coat done for min. 4 days and leakage tested
C)  TO BE CHECKED BEFORE BRICKBAT COBA
Floor traps and other plumbing lines installed in masonry after
1
base-coat as per drawings and with approved slope

2 Checking of joints of plumbing / drainage lines for leakages done

D) TO BE CHECKED FOR FINAL COAT


1 Thiyas of final coat proper (slope checked)
2 Final coat (top coat) applied properly
3 Offset of final coat with respect to slab kept proper
4 Date of final coat displayed on wall
5 Curing of final coat for 7 days by ponding

Site Engineer Quality Engineer Project Engineer