1.0 Purpose:
The purpose of these specifications is to assure acceptable finish quality, consistent with
commercial practices, that will result in the most reliable outdoor service for the equipment.
DATE
2.0 Scope
REV.
This specification shall apply to any parts where drawings or parts lists note it as a requirement.
2.1.1 Cleaning
E.C. NO
2.2 Phosphatizing
2.1.2.1 Applied by the immersion method, minimum coating weight shall be 300
MG/sq. ft.
2.1.2.1 Applied by the spray method, minimum coating weight shall be 150 MG/sq. ft.
REV.
2.3 Exception
Parts constructed from mill zinc-coated steel shall be prepared by immersing in an etching
TWL
11-27-02
DATE
REV.
OUTDOOR EQUIPMENT
DATE: 11-27-02 REVISION 21
BY
2.3.1 Etching solution consists of 1 part (by vol.) Prezaink-B (Industrial Chemical
Products Co.) & 3 parts water (by volume).
2.3.2 Parts shall be immersed for 30-40 seconds.
DATE
3.1 No primer is required for the polyester powder paints specified in Table II.
REV.
4.1 A uniform coat of the approved material (see Table II) shall be applied over the
external surfaces.
E.C. NO
4.2 The average dry film thickness for ten random measurements on the unit shall be
3.5 mils with a minimum dry film thickness of 2.5 mils.
5.1 Oil filled tanks shall have a uniform coat of approved material (see Table II)
over prepared internal surfaces unless otherwise specified on product drawing.
DATE
The thickness of the internal paint coating shall be 1.5 mil minimum on oil filled
tanks.
REV.
5.2 Control cabinets shall have a uniform coat of approved material (see Table II)
over prepared internal surfaces unless otherwise specified on product drawing.
Interior surfaces of control cabinets and non-oil filled tanks shall have an
average dry film thickness for ten random measurements on a unit of 2.5 mil
with a minimum dry film thickness of 1.5 mil.
E.C. NO
Line shall be made, as noted on product drawing, by using the approved material (see
BY
Table IV)
11-27-02
DATE
REV.
OUTDOOR EQUIPMENT
DATE: 11-27-02 REVISION 21
BY
7.0 General:
Materials from the different sources of supply shall not be mixed in any combination
except as noted on the approved materials tables.
DATE
8.0 Inspection:
REV.
Paints approved per Spec. 101 must conform to ANSI C57.12.31-1996 or later rev.
BY
11.0 Coatings:
11.1 INSIDE COATING: Prime Per SPEC.#101. TABLE III (include flange top
surface).
DATE
11.2 OU TSIDE COATING: Grit blast and aluminum metalize to .006 +/-.002 thickness.
Prime with Zinc chromate. Coat per SPEC. #101 finish
REV.
11.3 IDENTIFICATION: After the tank has been painted. Vendor to stencil the
word “Aluminized” ½ inch high to indicate that the
tank has aluminum metalized. The stencil shall be
E.C. NO
11-27-02
DATE
REV.
OUTDOOR EQUIPMENT
DATE: 11-27-02 REVISION 21
BY
TABLE II
Description Munsell
Number Group No. Number
Notation
3A None req’d Ferro Powder VT401 Polyester Grey-Blue 5BG7.0/0.4
Coatings Div. or Powder ASA-70
(Preferred #1) VT401A
3B None req’d AKZO JL146U Polyester Grey-Blue 5BG7.0/0.4
(International Powder ASA-70
E.C. NO
Paint)
3C None req’d H.B. Fuller 4873-82D Polyester Grey-Blue 5BG7.0/0.4
Powder ASA-70
3D None req’d Morton 30-7326 Poly Powder Grey-Blue 5BG7.0/0.4
ASA-70
BY
NOTE: 1. Vendor may substitute finish coat group numbers only as stated:
Finish coat group numbers – 3A and 3B are interchangeable.
DATE
TWL
BY
11-27-02
DATE
REV.
OUTDOOR EQUIPMENT
DATE: 11-27-02 REVISION 21
BY
TABLE IV
APPROVED OIL-LINE MARKING MATERIAL
MATERIAL COLOR
DATE
* A minimum drying time of 5 minutes is required for the Sanford marker prior to
immersing marker material in oil. Apply as thin as marking bead as possible.
BY
* Note: A minimum drying time of 20 minutes is required for the Diagraph marker
prior to immersing marker material in oil. Apply as thin a marking bead as possible.
This marker material is to be used only in cases where the preferred source is
unavailable.
DATE
TABLE V
APPROVED FINISH COAT MATERIAL
REV.
TWL
BY
11-27-02
DATE
REV.
OUTDOOR EQUIPMENT
DATE: 11-27-02 REVISION 21