QUOTATION FOR DEMOLITION WORKS IN

EXISTING BUILDING MOI AVENUE MOMBASA


PLOT MOMBASA/BLOCK XX TABITHA W. NGUNYI
A GROUND FLOOR COMPRISING BANKING HALL
AND BACK OF HOUSE AMENITIES

Scope
1 Demolish offices infront of teller cubicles
2 Reinforced concrete staircase to mezzanine floor 2 flights
3 Main entrance porch 180,000.00

Back of house
4 Demolish entire cubicles acroos width of floor
5 Demolish back office and stores 100,000.00

B CEILING WORK
1 Carefully remove all acoustic ceiling boards,framework and battens
2 Remove surface conduit pipes and cables 80,000.00

C ELECTRICAL INSTALLATIONS
Remove all wall fittings,cables and trunking compartments 80,000.00

D Allow for loading in trucks and disposal of materials/debri 50,000.00

MEZZANINE FLOOR DEMOLITIONS

1 Demolish all offices


2 Demolish lockers behind offices
3 Demolish offce in masonry walling
4 Demolish server room
5 Demolish all the 3 storage facilities
6 Allow for moving materials to ground floor and loading in trucks 50,000.00

STRUCTURAL ENGINEER SCOPE


1 Design and support suspended mezzanine floor from back of house
to front of building minimizing columns on ground floor 272 sq m 280,000.00
2 Issue of working drawings for steel fabrication contractor
3 Supervision of works
CLIENT SCOPE
1 Facilitation for repair permit from county government to
include demolition and hoarding