Risk Assessment Record: 5 4 3 2 1 1 2 3 4 5 Severity

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

AL FOUZAN TRADING & GENERAL

CONSTRUCTION CO.
Risk Assessment Record

Project/ Doc. No.: 0010


5 5 10 15 20 25
Location:

Likelihood
4 4 8 12 16 20
Dar Al Hijra 3 3 6 9 12 15
Project – 2 2 4 6 8 10
1 1 2 3 4 5
Package 1
Subject : painting 1 2 3 4 5
Assessment done by: Mohammad .Farooquddin Severity
Checked by: Eng. Abdul Mujeeb
Date Assessed: 03/01/2017 Date Checked: 03/01/2017

NOTE: Employees / Workers shall undergo HSE Induction prior to start work assignment. Toolbox talks shall be conducted by HSE Officer/Supervisor prior to each job by
referring to this R.A. & other appropriate references
Low Results: not much additional Moderate Risk: appropriate additional controls high risk: priority to eliminate the Extreme risk: work shall not be started until
controls required are required risk risk is eliminated
No Risk Assessment ACTION
Activities Hazard Identification likelihoo Severit Risk Risk Controls
. d y rate
BY :

1 Hazardous substances Those who are involved 2 2 4 Where possible no hazardous substances to be used Supervis
paints, thinners and in , use water or/forem
varnishes Painting as well as based alternatives en
those in the vicinity Where it is considered necessary for a hazardous
who may be affected by substance to be used contact Operations who will
fumes or dermatitis and arrange for a COSHH assessment and Safe Working
skin conditions for Procedure to be developed prior to work commencing
users.

2 Working at height Those involved who 3 2 6 Where possible work at height should be avoided. Supervis
Using of man lift need to Where this is not possible an assessment must be or/safety
access work at height made as to how the work will be undertaken safely. officer
Falls – Serious injury
Death certified man lift operator.

Man lift certified.

Page 1 of 5
Risk Assessment
AL FOUZAN TRADING & GENERAL
CONSTRUCTION
10
CO. 25
5 5
15 20
Risk Assessment Record

Likelihood
4 4 8 12 16 20
3 3 6 9 12 15
Project/ Doc. No.: 0010 2 2 4 6 8 10
Location: 1 1 2 3 4 5

Dar Al Hijra 1 2 3 4 5
Severity
Project –
Package 1
Subject : painting
Assessment done by: Mohammad .Farooquddin Checked by: Eng. Abdul Mujeeb
Date Assessed: 03/01/2017 Date Checked: 03/01/2017
3 Electric paddle • Electrical installation 3 2 6 • Instruct staff not to use equipment which has not safety
Air compressor meets BS and is been tested. officer
Grinder maintained in a safe • Staff should be encouraged to visually check
Condition. Equipment before use. If they are in any doubt about
• All equipment the safety of equipment, it must not be used and must
purchased meets CE be reported to Health & Safety Services.
standards. • Ensure sockets are not overloaded, include Item in
• Sufficient socket regular health and safety inspection.
outlets are provided in • Ensure cabling is not subjected to damage by
each Office. furniture (e.g. desk legs, chairs and cabinets) or
• Appliances are pedestrians. All cables that must traverse traffic
appropriately labeled to routes should be protected by cable covers if they
denote last and next cannot be safely re-routed or Tied back out of the way.
test date.
• Staff do not attempt
any electrical repairs
themselves only
competent and
authorized Persons to
work on electrical
systems.

Page 2 of 5
Risk Assessment
AL FOUZAN TRADING & GENERAL
CONSTRUCTION CO.
Risk Assessment Record

Project/ Doc. No.: 0010


5 5 10 15 20 25
Location:

Likelihood
4 4 8 12 16 20
Dar Al Hijra 3 3 6 9 12 15
Project – 2 2 4 6 8 10
1 1 2 3 4 5
Package 1
Subject : painting 1 2 3 4 5
Assessment done by: Mohammad .Farooquddin Severity
Checked by: Eng. Abdul Mujeeb
Date Assessed: 03/01/2017 Date Checked: 03/01/2017
4 Asbestos By sanding down walls 2 2 4 The procedures for obtaining authorization to work Supervis
and must be followed. This procedure will ensure that the or/ safety
ceilings those relevant asbestos surveys are consulted and that no officer
undertaking asbestos containing materials are disturbed
painting as well as If the premises is a domestic house
those in the area may then no sanding down is permitted
be exposed to asbestos
fibres.

5 Sand blast machine, General concept about Sand 2 2 4  Sandblasting is a special physical process that uses safety
P.P.E Blasting and Painting . a stream of sand propelled by water or compressed air officer
and applied on a
Sandblasting creates a powerful abrasive force that
can act on any surface worked on using this air
propelled material There are
Alternative sandblast materials that can be used
depending on the requirement of the work. These
include iron globules, emery and powdered quartz.
 Sandblasting is commonly used for cleaning the
cast irons in foundry shops. It is also the preparatory
process done on different kinds of surfaces before
enameling, painting and during the process of
galvanizing. It is also a popular cleaning solution for
surfaces with hard to remove grime and other debris
that accumulate in the
Concrete surfaces of buildings.

Page 3 of 5
Risk Assessment
AL FOUZAN TRADING & GENERAL
CONSTRUCTION
10
CO. 25
5 5 15 20
Risk Assessment Record

Likelihood
4 4 8 12 16 20
3 3 6 9 12 15
Project/ Doc. No.: 0010 2 2 4 6 8 10
Location: 1 1 2 3 4 5

Dar Al Hijra 1 2 3 4 5
Severity
Project –
Package 1
Subject : painting
Assessment done by: Mohammad .Farooquddin Checked by: Eng. Abdul Mujeeb
Date Assessed: 03/01/2017 Date Checked: 03/01/2017
6 Portable equipment - Those using drill - 3 2 6 Stir paints manually or, Supervis
Users may use a Injuries Equipment must be suitable for use i.e. proprietary or/forem
portable from moving parts mixer blade en
drill for mixing Equipment must be in good working order and free
from defect
If using an extension lead uncoil fully
Plug into nearest plug socket
RCD must be used
Mixing must be undertaken by staff
7 External painting in hot Those involved – heat 2 2 4 In hot weather, avoid the hottest part of the day, Supervis
or exhaustion, sunstroke, wear a high factor sunscreen and drink plenty of or/forem
cold weather hypothermia fluids. en
Take breaks in shade
In cold weather, ensure appropriate clothing is
worn; take breaks in a warm place if possible. If not
set time limits on external work

8 PTW Application Hazardous activities Obtain proper work permit before start of work. Permit safety
Without sufficient should be availed from the concerned authority. officer
preparation&safety
measures. Method statement to be explained to all employees and it
must be made available at the site during the activities.

Barricade Work Area & post necessary sign boards

Page 4 of 5
Risk Assessment
AL FOUZAN TRADING & GENERAL
CONSTRUCTION CO.
Risk Assessment Record

Project/ Doc. No.: 0010


5 5 10 15 20 25
Location:

Likelihood
4 4 8 12 16 20
Dar Al Hijra 3 3 6 9 12 15
Project – 2 2 4 6 8 10
1 1 2 3 4 5
Package 1
Subject : painting 1 2 3 4 5
Assessment done by: Mohammad .Farooquddin Severity
Checked by: Eng. Abdul Mujeeb
Date Assessed: 03/01/2017 Date Checked: 03/01/2017
9 Work in domestic Animals, Violence and 3 2 6 No work to be undertaken which disturbs the fabric Supervis
premises aggression, asbestos of the building including sanding down as we have no or/forem
knowledge as to the presence of asbestos. en

Note: attached MSDS

Prepared by: Checked by:


Approved by:

Signature: Signature:
Signature:

Page 5 of 5